ML20128F691

From kanterella
Jump to navigation Jump to search
Corrected Ltr Forwarding Results of Addl Main Steam Line Break Analysis/Evaluation for Both Inside Containment & in Doghouse,Per 840808 Submittal.Qualification of Doghouse Equipment Demonstrated
Date released: 05/21/2020 Download: ML20128F691


Corrected Evaluation of Main Steam Line Break in Doghouse. Rept Redistributed Due to Copying Error
ML20128F701
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/31/1985
From: Ray J, Ritchie J, Weidler R
DUKE POWER CO.
To:
References
Download: ML20128F701 (49)
Corrected Ltr Forwarding Results of Addl Main Steam Line Break Analysis/Evaluation for Both Inside Containment & in Doghouse,Per 840808 Submittal.Qualification of Doghouse Equipment Demonstrated
ML20128F687
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 06/21/1985
From: Tucker H
DUKE POWER CO.
To: ADENSAM E G, DENTON H R
Office of Nuclear Reactor Regulation
References
Download: ML20128F687 (2)