O PublicService
.n. c..
Company of Colorado 16805 WCR 19 1/2, Platteville, Colorado 80651 May 3,1985 Fort St. Vrain Unit No. 1 P-85152 Regional Administrator g g g g p=' g Attn:
Mr. E. H. Johnson Region IV U.S. Nuclear Regulatory Commission NAY - 61985 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 j
Docket No. 50-267
SUBJECT:
FOSAVEX-85 Scenario Package
REFERENCE:
Letter, Gahm to Johnson, dated 04/01/85 (P-85114)
Dear Mr. Johnson:
Attached please find the detailed scenario package for the 1985 Fort St. Vrain Radiological Emergency Exercise (FOSAVEX-85).
This is being submitted according to the schedule set forth in G-84049 (Collins to Lee, dated February 9,1984).
The exercise is to be full-scale, with participation by the licensee and state and local governments.
The scenario involves a
radiological release which will be of such a magnitude that a General Emergency is declared.
Please note, however that primary coolant inventories have been increased by several orders of magnitude to attain such a release, and that no such release can feasibly occur with the actual primary coolant activity available in the Fort St.
Vrain primary coolant system.
The scenario is described in the following attachments to this letter:
(l -
Scope and Objectives Attachment A Conduct of the Exercise Attachment B
/
Narrative Summary and Sequence of Events Attachment C Observer / Prompter Packages Attachment D J
I dW 8507000130 850503 ADOCK050g27 PDR
n 'If you have any comments or questions regarding this submittal, please contact Mr. Frank Novachek of my staff at (303) 785-2223, extension 201 as soon as possible.
Sincerely,
.hA h
4 J. W. Gahm Manager, Nuclear Production Fort St. Vrain Nuclear-Generating Station JWG:SMS/dr Attachments
Attachment A SCOPE AND OBJECTIVES b
t i
l 1
e s
i 4
I
)
i i
1 i
i
1 Attachment A Page 1 of 2 FORT ST. VRAIN FOSAVEX-85 PURPOSE:
The purpose of FOSAVEX-85 is to test the Radiological Emergency Response Plan and Implementing Procedures as tools for use by Public Service Company of Colorado personnel when responding to a radiological emergency at Fort St. Vrain. A concurrent purpose is to test the offsite response of stato and local agencies in the event of such an occurrence at Fort St. Vrain.
DATE:
F0SAVEX-85 has been scheduled as a one-day exercise to be initiated at or after 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br /> on June 18, 1985.
SCOPE:
1.
The exercise will be an unannounced off-hours emergency exercise, with participation by the licensee and state and local authorities.
2.
The scenario begins as a non-radiological initiating event which will require activation of the emergency organization. A second event, involving the release of radioactive material, occurs and increases in severity to a " GENERAL EMERGENCY".
Actual meteorological conditions will be used for cimulated radiological assessment during the exercise.
3.
All Emergency Response Facilities will be activated by the licensee and state and local authorities.
4.
Personnel not participating in the exercise shall report to normal work locations and shall perform normal duties.
OBJECTIVES:
1.
Demonstrate that response center personnel can be alerted and notified during non-working hours to man the emergency response centers.
2.
Demonstrate, by use of the new notification fanout, the emergency response facilities can be manned and operational in a timely fashion.
l l
L
Attachment A Page 2 of 2 3.
Demonstrate that direction and supervision at the response centers is sufficient to ensure that overall facility response is adequate and that each facility runs smoothly. Demonstrate that Directors keep their staffs informed of the emergency classification and plant status.
4.-
Demonstrate that personnel accountability of those personnel on-site at the onset of the exercise can be accurately determined in a timely fashion.
5.
Demonstrate that the incident assessment staff can perform the assigned tasks related to assessment and that timely decisions and appropriate response can be made concerning the incident category.
6.
Demonstrate that the telecommunications system can be manned and operated in a timely manner and that the system is adequate to handle anticipated traffic during site emergency conditions.
7.
Demonstrate that emergency monitoring teams and damage control teams, if needed, can be assembled and dispatched from the Personnel Control Center in a timely manner and can adequately perform assigned functions at their appointed destinations.
Demonstrate also that the teams are adequately briefed of applicable plant conditions and protective clothing, dosimetry and respiratory protection requirements prior to being dispatched from the Personnel Control Center.
8.
Demonstrate that plant operations and support personnel respond to the emergency situation utilizing emergency procedures to mitigate the consequences of the incident.
9.
Demonstrate the capability of emergency personnel to follow and use emergency procedures, checklists, and data sheets.
- 10. Demonstrate the use of status boards to keep response personnel informed of the status of the event and to provide a basis for data transmission to the response centers.
l
m
.4m.
m m
.a
.h 4.64-J L-4 a
A a
_-..A
-w.-.--._m.
L--
Jm.ma,2 l
4 b
i I
e Attachment B CONDUCT OF THE EXERCISE J
k l
i t
!i 4
1 4
f I
l I
i i
n-,.,
_m.,
---_--n,,,,n,-
,,n---
Attachment B Page 1 of 2 FOSAVEX-85 CONDUCT OF THE EXERCISE 1.
Activity released and doses received are designed to be significant enough to escalate the event to a General Emergency.
The release is not intended to be realistic in terms of actual available inventory.
2.
Actual meteorological conditions will be utilized, a.
Field monitoring teams will be provided with pre-determined field measurement data (via prompter cards).
The field monitoring teams will be dispatched to track the plume.
In the event that the meteorological stability category would preclude a plume from being detected (from a radiological standpoint),
the field monitoring teams will continue to use the pre-determined data to demonstrate plume tracking capability, b.
Depending upon the meteorological conditions during the exercise, the Personnel Control Center may have to be relocated.
If this becomes necessary, in the judgement of the Technical Support Center Director, the Personnel Control Center will be moved only once to the other onsite location, for purposes of demonstrating the capability.
3.
An extra crew of shift operating personnel will be used as the operating crew for the exercise.
The regularly scheduled operating crew will perform their normal functions for the plant conditions at the time.
4.
There will be no effort made to involve personnel arriving for normal work schedule, should the exercise still be underway when the Graveyard Shift begins (2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />).
These personnel will be processed routinely through the Search and Identification facility.
5.
Certain operator actions may have to be pre-empted in order to prevent the premature termination of the exercise.
6.
The Early Warning Alert (EWA) system will be activated during the drill.
Attachment B Page 2 of 2 7.
Personnel involved in control rod drive refurbishment activities, other than those directly involved in the emergency organization, shall continue uninterrupted with their work.
Accountability of these individuals will be established.
8.
During the loss of outside electric power to be simulated during the exercise, equipment and systems that would be affected will not be used.
With regard to computer systems, the IBM controllers will be out of service. The Data Acquisition System (Data Logger) will be assumed to still be available due to the modification currently being installed to provide noninterruptible power to the system.
l
a i
Attachment C
' NARRATIVE
SUMMARY
AND SEQUENCE OF EVENTS f~
s
Attachment C Page 1 of 5 F0SAVEX-85 NARRATIVE
SUMMARY
With the reactor operating at a steady power rate of 65% on the evening of Tuesday, June 18, 1985, an earthquake is experienced. The Control Room operators are informed that the earthquake had a horizontal -acceleration of 0.07, corresponding to an ALERT 9
classification.
Notifications are made, and personnel report to their emergency stations.
45 minutes after the earthquake, a strong tremor occurs, and certain plant equipment is damaged.
Included are a condenser rupture and a collapse of three cells on the main cooling tower.
Loop 2 feedwater is shutdown, and the Reactor scrams.
Simultaneously with the aftershock, a loss of all outside electric power occurs. The emergency diesel generators pick up loads as programmed.
A pinhole leak -begins forming in the reheat section of the steam generator.
One hour into the exercise, the turbine-driven boiler feedpumps experience high vibration and low flow and are tripped.
Condensate is supplied to the Loop 1 EES section of the steam generator to supply core cooling capability. A and B circulators will be run on condensate.
One hour and fifteen minutes into the event the reheater leak increases in magnitude so that it is detectable.
While' attempting to isolate the reheater, it is found that three valves have failed, and the release is exiting the building via an electromatic relief valve.
As the release is nonisolable, a SITE AREA EMERGENCY is declared. Depressurization of the PCRV through the helium purification system is initiated.
As dose assessments are performed, it is concluded that a GENERAL EMERGENCY should be declared due to dose rates at the Exclusion Area Boundary.
Meanwhile, an Equipment Operator slips on spilled wet and oily resin.
He suffers a compound fractured leg and is contaminated. The Medical Emergency Plan is put into effect.
Two hours into the event, outside power is returned.
Attachment C Page 2 of 5 d
Dose assessment f:alculations continue ans' dose 3 rates decrease due to the PCRV being depressurized. Approximately four hours after the release became detectable, the PCRV is depressurized.
.s a
f l
+
I
/
o i
4 I,
4
)
A 1
k s
~
s j
i
~
5 a
a
?
+
y u
4 b
o a 0
Attachment C Page 3 of 5 FOSAVEX-85 SEQUENCE OF EVENTS 00:00 Initial Conditions:
Reactor steady at 65% power level.
B Boiler Feed pump out on a clearance.
00:00 0.07g earthquake occurs.
There are no onsite or offsite consequences. An ALERT level emergency is declared.
Notifications are made, and personnel begin reporting to the emergency response centers.
Operators begin walkdown of the plant in accordance with emergency procedures.
00:45 An aftershock occurs, and causes considerable onsite damage, including:
1)-
A condenser rupture.
This causes a loss of vacuum and an automatic reactor scram.
2)
Loss of outside power.
Emergency Diesel Generators pick up loads as expected.
3)
Feedwater Loop 2 shutdown.
01:15 Reheat monitors show an increase indicating a primary coolant leak through the Loop 1 reheater section of the steam generator.
A SITE AREA EMERGENCY is declared due to the nonisolable leak.
01:30 Reactor Equipment Operator reports via the plant paging system that he has suffered a compound fracture of his leg and is contaminated. Weld County and St. Luke's Hospital are notified.
01:45 (approx)
Dose assessment is complete.
Emergency classification is determined to rema1ri at a SITE AREA EMERGENCY.
02:00 Outside power is restored.
02:15 (approx)
Dose assessment performed again.
Emergency has now increased in magnitude to a GENERAL EMERGENCY.
s Attachment C Page 4 of 5 i
TIME AFTER START OF DRILL EVENT 02:45 (approx)
Oose assessment results still indicate a GENERAL EMERGENCY.
t 03:15 Dose assessment results show a decrease in the magnitude of the emergency. A SITE AREA EMERGENCY is declared.
05:30 After depressurization is complete; release is terminated; de-escalation of the classification of the event from a SITE AREA EMERGENCY to NONE occurs.
NOTE:
After 03:00, other events may occur onsite to drill the operating shift. These are not intended to affect the emergency classification, or require offsite
- response, except for communications response.
i-l 1-f i
e:.
. ~,.,
,-e v,-
c.
. ~, -
,,_.,m.,,,,,,-,--
v-,..,.
a..~.
.n
- - ~ ~ -
m
,-~~-
---.--n.
U
\\
an t
c **.
gO 2 sn u b eC Ch.
h A
u u
C A
C l
i to g
4 to a
eC W
g j
v" e a Gs a e e a a e a e a a e 2
Ea b
G G
.GJ C
==
es=
to G
M
- ** C O C O O n n O M e3 O C
- C 7 O -s O O O. O. O. O. O. n 9. O. O O O. O. O O. O O. O n
W m.
I e e
e e e
e t
7 c")
W w.J w J w.aJ su as.M.a J '.J w.J w w w w
%W e / P *** n n f* A o r O f om a#O Po=
EL >
9'* C* # =0 N % O O t 4 4 ** 33 # - O *e 4 N Y
e e o e e e o e o e e e o e e e e e e 1
m.
N r =e m ? O + 4 4 4 4 4 **
- m N % ee ne ts
- e 9 m O e -. -e -.e.e
.e N
0 0 0 O 0 3. O. O. O O O O O C D O O 0 0 e'
s t e a +
I s e e e a t I e e 6 I ?.
w as us w.a w w w w w w w w.a w w.a w w
%3 f* N (* m fp *= d N J d'b Amen #@== T # em 8
- N. e P O "1 O P
- 4 7 # ** N. # iJ* *
- f s
e e
e e
e e e e e e e o e e e en =e e a a.e o =a ? e t* T *= P..n # PNN e
i j
- an e e A N N A N A 8N N m. N P= or *** ea se 0000000O90000000000 t;
I e e I I e e s I e e I I e s a e I s es
.4 u W w w w eJ w a W a.J w w w uJ J w J W sh a=e @ C.
t " em R t,
.a* =
- 4 *. E' O e en se a==
. f J. & 4 A m'. N o.e C. O
- A 0 0 4
% ** b 4 @
em e e a e
e e e e e e e e
u -== # 4 ee -e====== =e.mo se me me T *= 4 g
- W 8*
"CU e
E l
ta N
3o 2
~~90DO000000000000-gjg n
c e O. n. c. e. e. c. c. e. O. c. O. O. O. O. O. O. O s, f,.
e e i
u
.s u tae sa
@pa g
61 w LJ w u' u w w L4 w u
.w u w t, e ** ** T1 m' L.
N
. 8 w
m N P== -e m N O P e a'> # 'S em
- f. #. # t'. **. 7 9m. 4..T.N. O. Gr. /. ts.F.#.**.*.=.=
3, f
- f A
e t'*
N # ee N # f f # # # #
8'" 8P m f( N s=8 m. me
@ M O
g.J
@W as-Fw en e=e W
3
- m. e. -
fut EM
=U O ""*
+4 5 N M
7 43 W
=
m P4
- m 88% *** m a't aat m 8'84 se't N N 8% N N N N g
a C. D. D. D. O. O. O. O. C. O. O. O. h. 6 0. O. O. D. O.
u.$,_.F,M I.,
- =
J~
W W W W taJ W W W L&I %ed bf had W hM 4 6 bad bad W
.i b M s O.n
- 't 4 4 N D J u.>=== e' # N. e.4 a' me N em
? ** N **' cr (N # #== v.
3 OsN Cl 3 M
r* u M de s e== e.s e (*
se C
g e o e e e o e e e e e e e o e e e=* D*
f m
- f8" PJ '%J N se me em m. as f8* #m @f@(d
,a.
aa
. er er g *g 50 s P E M 3
.sJ u3
- e4 h I
U Wb 8s O
e.
L l
I a.
e.dW uW (3 e uc
- . b. @. N. O. T. a. #. 4 3 @. O. t. ?. O O. O. N O.
&ff**
O%
O,.8 t
Do e
c l
2O
- c a # 4 O O O N O f O
- 't 9 ** e P=== -e
.c,,,
in en i
T
- == @==
- si N 88* ff* ** r om me T e D. N W s*
de. W Omn e&Oe nnm'meaN N+~
aNem kl,h"j w
- M M* # (O P= # 88* me E # ** ** N 4 ** me se me
~<~.m-
~~ ooo##,Pem~
et J th.a e.
b a =g yy e-o w O
.C CE Eb La.
0==
I.
et
.u O@O@ O @ O O Oad O M O d'*
O E O O O SO
-n e.. s.. e... e r.. m... e r e.. e r e.. e y
n w
.e
~ ~ ~_- NNNN--eerteorre 8
~
3s k
k' a...
~..o c.
39's t.
NWA s.
l.
4 a
$I94 9 L 4 6 Gasenadr000 eip0
h ATTACHMENT D OBSERVER / PROMPTER PACKAGES
Control Room Package A.
Initial conditions summarized on the attached Shift turnover sheets.
In general:
1)
Reactor steady at 65% power.
2)
Steady state control systems in remote auto 3) 1 B Boiler Feed Pump is out on a clearance 4)
Auxiliary Boiler is in service according to Technical Specification requirements
SMAP-8 Attachment A Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 0 Service
- 9' PUBLIC SERVICE COMPANY OF COLORADO SHIFT SUPERVISORS SHIFT TURNOVER CHECKLIST On-Coming Shift /600 to.2VoD (ON)
(OFF)
Date (cl/A/Pl5 1.0 NARRATIVE LOG AND DATA SHEET REVIEW 1.1 Shift Supervisors Narrative Log l[]
1.2 Night Order Book l[l 1.3 Primary Coolant Moisture Data l[l
~
1.4 RWP's Outstanding l_l 1.5 Health Physics Status Report l[l 1.6 Water Chemistry Status Report ll 1.7 Consumables Inventory Report l[l 1.8 Reportable Events l_l 1.9 A.N.I. Reports l[l 1.10 Snubber Impairment Log l[l FORM tB1372 3 ~.M3
SYAP-8 Attachment A Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 0 service 9"
PUBLIC SERVICE COMPANY OF COLORADO 2.0 PLANT STATUS LOG l
l Date 6//B/85 Time 1600 Operator J. d)tAgfe,St.
I I
l l Reactor Power A5 Electric Load 22D MW I
I l
l PCRV Pressure C>35 psia Average Core Outlet
/360
- F i
I l
l Total Helium Flow 6,8 Circ. Inlet Temp.
MO
- F I
I l
/@D
- F Hot Reheat Steam
/ Con
- F l
I l
l Primary Coolant Oxidants CO O ppm, CO o
ppm, H O O ppm 2
2 i
I l
l increasing decreasing steady i
I l
l Analytical Moisture Monitors in Service 9305 None l
l Region Outlet Temperature Alarms on Data Logger l
l l
l (None',
l l
(C+rcle "None" or list region and status, e.g. 24/300) hD l System 46 Pumps B
System 47 Pumps B
l 1
l l Waste Releases In Progress h
l R/A Liquid YES 1
I 1
l R/A Gas YES ll h
Reactor Sump > 10 gpm YES Comments: Sim e.
FORMlBl3*2 22 3643
SKAP-8 Attachment A Public FORT ST. VRAIN NUCLEAR GENERATING STATION Zssue 1
'E' service PUBLIC SERVICE COMPANY OF COLORADO l
l He Purification Trains i
I l
l Service Standby Regeneration l
l A
B A
B Regen A
B None i
l 1
~
l l
.l lH Getters 2
I I
l l
In Service tandby Activating None l
l A
B A
B A
B l
Fire Water Ecoster Pump In Service A
B h
NO BVBW In Service Brg. Water Make-up From @
P-2105 P-2108 Gravity Other l
l P-2105/ Gravity Feed From Deaerator CST OM Turbine Water Removal Pump In Service B
Pelton Water Return To Condenser Cond. Pump suction
~ ~
l l Buffer He Make-up From QurifiedHeiT61tj Bottle Farm h
l RMS Position Fuel Load Off ISS Position Start Up Low Power Plant Control Systems for > 30%
Manual N/A I
l l
l A
B C
D l
l Circulator Speed E#PY) 6M SFm 58CD hC hC h1C hC Motive Power Comments:
11M Lo FoRMi9lTT2 22 3643
SMAP-8 Attachment A Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 0 Service
- 98 PUBUC SERVICE COMPANY OF COLORADO l
l LOOP 1 EES In Service YES NO l
l l
l EES Supplied From FW EFW EM Cond.
N/A Reheater In Service NO l
l Reheater Supplied From ISO psi CRHT BPFT EM N/A l
l Steam Steam Steam Cond.
l Reheat Attemperators In Service NO Flow 77 K. #/hr.
l Main Steam Bypass Open YES h
l Start-up Bypass Open YES LOOP 2 EES In Service NO l
l EES Supplied From h
N/A h
NO l
Reheater In Service l
Reheater Supplied From 150 psi CR BPFT EM N/A l
l Steam Steam Steam Cond.
Reheat Attemperators In Service NO Flow
- 7r #/hr.
h l
l Main Steam Bypass Open YES l
l Sta: c-up Bypass Open YES Comments:
simt t-FORM 18:372 3 3M3
SMAP-8 Attachment A Public FORT ST. VRAIN NUCLEAR GENERAT!NG STATION Issue 1 service PUBLIC SERVICE COMPANY OF COLORADO h
l Condensate Pumps A
B h
l Condensate Polishers A
L.P. Heaters YES h l L.P. Heater Shell Flooded
- 2 YES
- 3 l
l Deaerator In Service NO Deaerator Steam Source 150 psi CRht N.A.
Boiler Feedpumps In Service
@g B, None H.P. Heaters In Service None h
l Pre-Boiler Recire. In Service YES Circulating Water Pumps In Service hh@h h-Hot Reheat Bypasses Open
- 1
- 2
- 3
- 4
- 5
- 6 h
- 2
- 3
- 4
- 5 l
HS-3220 Position l
Drainage Flowpath Normal Direct to Decay Hea l
l Condenser Exchanger l
l l
l Decay Heat Excaanger Supplied From l
l BPFT Loop 1 Rht Loop 2 Rht h
Station Housepower RAT l
l Q.._ -
B C
D STBY) l Emergency Diesel l
l Generators B) hM h/ PAR.
l l ACM D-G YES NO l
Main Bus Links In Place NO h
Station Batteries On Overcharge A
B C
Commentsh bfe,00rA,.Irr A onm,0 nnS bb /)Mtid
/
/
FORM t81372 3 3643
SMAP-8 Attachment A Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 O
Service PUBLIC SERVICE COMPANY OF COLORADO l
l Service Water Pumps A
AhlR)
B[LR)
None Service Water Tower Fans l
l Instrument Air Compressors hB l
l l
l Main Tower Fans A B
C D
E F
G H
I J None l
I l
l H/L/R 1]
jf Q
y y
l}
Q-i.]
y Q
l I
'l l P.P.S. Moisture Monitors Tripped l
1118 1117 1116 1119 1115 1120 1121 1122 Penetration Interspace Pressure > PCRV NO DEPRESS Circulating Water MU Pumps B
C l
l River Makeup Pumps l
l St. Vra Platte River hB l
l A
B None None 1
I l
l 230 KV Status (Circle any breaker open or out of service) l l
l l 5309 5307 5301 5317 5319 I
I l
l 5310 5306 I
I l
l 5311 5305 5300 5313 5315 I
i l
l Start-Up Book completed to Step N/
l l (during start-up or power changes)
Comments llfrtlf,
F OR M (81372. *2 - 3643
SMAP-8 Attachment A Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 O
SerVICO PUBLIC SERVICE COMPANY OF COLORADO 3.0 PERSONNEL STATUS OFF-G0ING ON-COMING 3.1 Shift Supervisor (SRO)
G,6. Sh;[/ef-Reactor Operator (SRO)
N4 A/M E. Reactor Operator (RO)
- f. Opfde Sc W. Reactor Operator (RO)
- 8. Ldwse, Reactor Equipment Operator (F.B.)
- 6. 7)?r/2.
Turbine Equipment Operator (F.B.L.)
L. b e h u,o I. Auxiliary Tender (F.B.)
D, 7hls
- 0. Auxiliary Tender (F.B.)
If it}hrek
- Health Physics Technician (F.B.)
L.A 8ms
- Lead Security Officer (F.B.)
- d. Esif W
- Names will be added after they report for duty.
3.2 Remarks 11 FY1 U >
O FORM (81372 3 3643
SMAP-8 Attachment A Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 S'
Service PUBLIC SERVICE COMPANY OF COLORADO 4.0 SPECIAL INTEREST ITEMS 4.1 LCO's in grace period or violation 11 m A L 4.2
.Non-routine testing in progress itD1t os 4.3 Surveillance required to be performed prior to 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> today.
Absic s 4.4 Emergency maintenance work in progress.
11Mir >
80RMiBim.m 3643 L_
SMAP-8 Attachment A Public FORT ST. VRAIN NUCLEAR GENEPATING STATION Issue 1 0SerYICO 9'
PUBUC SERVICE COMPANY OF COLORADO 4.5 Housekeeping problems.
Ilmin t
4.6 Safety and/or accidents reported during shift.
11p+10 4.7 Operating instructions listed in order of decreasing priorities.
Oltff kf j f f,
( W k A ff qq A h, h, hhp 0 M Uf[j b
/, el c l
.)
ft
/4M A LA
[
l'Y 45
- 4
! /14 1 th t!(b /Hf r >.
FORM 888 372 3 3643
SVAP-8 Attachment A Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 O Service O'
PUBUC SERVICE COMPANY OF COLORADO 4.8 Check and if any operator will exceed AC 7.1.1 guidelines, notify the Superintendent of Operations or his designee and get permission to exceed.
st/+v e >
6.6. Q N f(L, Off-Going ShifA Supervisor Oncoming Shift Supervisor 6
FOmv tBl372 22 3M3
SMAP-8 Attachment A Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 OService 9
PUBLIC SERVICE COMPANY OF COLORADO 5.0 POST SHIFT TURNOVER REVIEW (Items to be reviewed after coming on shift.)
5.1 Operator Logs l[l 5.2 LCO Compliance Log l[I 5.3 Plant Trouble Reports l[l 5.4 Clearance Log l[I 5.5 0.D.R. l.og l[l 5.6 TCR Log l[l 5.7 Start-up Book l[l 6.0 Conduct a shift briefing of proposed operation.
Update individual operating instructions if necessary.
l_l FORM 181372 21 3643
SMAP-8 Attachment A FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 0 Public 9"
Service PUBUC SERVICE COMPANY OF COLORADO 7.0 OPERATOR SHIFT TURNOVER CHECKLISTS REVIEWED s
7.1 ReactorOperator(SRO) l[l 7.2 E. Reactor Operator l[l 7.3 W. Reactor Operator l[l 7.4 Reactor Equipment Operator l[l 7.5 Turbine Equipment Operator l[l 7.6 I. Auxiliary Tender l[l 7.7
- 0. Auxiliary Tender l[l Oncoming Shift Supervisor i
FORMt8 372 22 3643
SMAP-8 Attechment C Public FORT ST VRAIN NUCLEAR GENERATING STATION Issue 1 O'
service PUBLIC SERVICE COMPANY OF COLORADO EAST REACTOR OPERATORS SHIFT TURNDVER CHECKLIST On-Coming Shift /4 00 to2'd'd (ON)
(OFF)
Date &f/B /A 5 1.0 NARRATIVE LOG AND DATA SHEET REVIEW 1.1 Reactor Operators Narrative Log l[l 1.2 Primary Coolant Moisture Data l[I 1.3 Water Chemistry Status Report l[l 1.4 P.P.S. Logs, Status l[l 1.5 Surveillance Test Status l[l 1.6 LCO Compliance Log Status l_l A
.Y FORM t61372 ':-3643
S?.hi-6 Attachment A f
Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 9
SerVICO PUBLIC SERVICE COMPANY OF COLORADO 2.0 PLANT STATUS LOG l
l Date 6//B/85 Time 1600 Operator I. d fA/fff; SL,
'l I
l l Reactor Power 45 Electric Load 22D MW I
I l
l PCRV Pressure G36 psia Average Core Outlet
/360 F
1 l
l l Total Helium Flow 68 Circ. Inlet Temp.
64D F
l l
l l Main Steam
/@D F
Hot Reheat Steam
/ Cod F
l I
l l Primary Coolant Oxidants CO O ppm, CO o
ppm, H O O ppm 2
2 increasing decreasing steady i
I l
l Analytical Moisture Monitors in Service h
None 9305 l
l Region Outlet Temperature Alarms on Data Logger 3
l l
(firtle "None" or list region and status, e.g. 24/300) hD System 46 Pumps B
l l System 47 Pumps hB I
i l
l Waste Releases In Progress l
1 h
l R/A Liquid YES 1
l R/A Gas YES h
Reactor Sump > 10 gpm YES Comments: th c FORM (Sim-ll XA3
m.-:
Attachment A Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1
- 9' Service PUBLIC SERVICE COMPANY OF COLORADO l
l He Purification Trains l
I I
l Service Stan b Regeneration l
l A
B A
B Regen A
B None l
I
.I j.H Getters 2
l I
l l
In Service Standby Activating None hB I
I A
A B
~
l Fire Water Booster Pump In Service A
B BUBW In Service NO Brg. Water Make-up From P-2105 P-2108 ' Gravity Other l
l-P-2105/ Gravity Feed From Deaerator -- CST OM Turbine Water Removal Pump In Service B
Pelton Water Return To aera Condenser Cond. Pump Suction l
l Buffer He Make-up From Bottle Farm l
RMS Position Fuel Load Off l
ISS Position Start Up Low Power Plant Control Systems for > 30%
y Manual N/A l
l l
l A
B C
D l
l Circulator Speed '
6@
6F(D SMn 5Fod h4 C h4 C hC h4 C Motive Power Comments:
It&tw m
FCRMl8 372 22 Xi43 a
i.v.
Attachment A PubliC FORT ST. VRA!N NUCLEAR GENERATING STATION Issue 1 9
SerVICO PUBLIC SERVICE COMPANY OF COLORADO l
l LOOP 1 EES In Service YES NO l
l l
l EES Supplied From FW EFW EM Cond.
N/A Reheater In Service NO l
l Reheater Supplied From 150 psi CRHT BPFT EM N/A l
l Steam Steam )
Steam Cond.
l l
Reheat Attemperators In Service NO Flow 27 K_ #/hr.
h l
l Main Steam Bypass Open YES h
l Start-up Bypass Open YES l LOOP 2 EES In Service NO l
l EES Supplied From h
N/A Reheater In Service NO l
l Reheater Supplied From 150 psi CR BPFT EM N/A l
l Steam Steam Steam Cond.
Reheat Attemperators In Service NO Flow f7f #/hr.
h l
l Main Steam Bypass Open YES l
Sta;c-up Bypass Open YES Comments:
it/ nth S
k f oRM t86 372 3 3e43
...c.e Attachment A Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1
@ Service E'
PUBLIC SERVICE COMPANY OF COLORADO h
l Condensate Pumps A
B h
l Condensate Polishers A
L.P. Heaters M
YES h l
l L.P. Heater Shell Flooded
- 2 YES
- 3 l
l Deaerator In Service NO Deaerator Steam Source 150 psi CRht N.A.
l l Boiler Feedpumps In Service
@ g B,, @
None l
H.P. Heaters In Service None l
l Pre-Boiler Recirc. In Service YES l Circulating Water Pumps In Service hh@@
h Hot Reheat Bypasses Open
- 1
- 2
- 3
- 4
- 5
- 6 l
l HS-3220 Position h
- 2
- 3
- 4
- 5 l
I Decay Hea* e l
l Drainage Flowpath Normal Direct to l
l Condenser exchanger I
l l
l Decay Heat Exchanger Supplied From l
l BPFT Loop 1 Rht Loop 2 Rht h
Station Housepower RAT I
l STBY) l l Emergency Diesel 6
B C
D
.I I
~
_ B) hM h/ PAR.
l l
Generators l
ACM D-G YES NO Main Bus Links In Place NO h
l Station Batteries On Overcharge A
B C
Commentsh b/&fr A,,100,/) einy/) m c/ bG AfMy
/
/
FC AM e Bl 37ll.". 3643
in,f-5 Attachment A Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 Service PUBLIC SERVICE COMPANY OF COLORADO l
l Service Water Pumps A
AhlR)
BhLR)
None Service Water Tower Fans l
l Instrument Air Compressors @
B l
1 l
l Main Tower Fans A B
C D
E F
G H
I J None l
I I
I HIL/R F1 JL U
d U
d
/}
d d
d
- l I
I l P.P.S. Moisture Monitors Tricoed l
1118 1117 1116 1119 1115 1120 1121 1122 l
Penetration Interspace Pressure > PCRV NO DEPRESS Circulating Water MU Pumps B
C l
l River Makeup Pumps l
l St. Vra Platte River l
l A
B None A
B None I
I l
l 230 KV Status (Circle any breaker open or out of service) l I
l l 5309 5307 5301 5317 5319 1
l l
l 5310 5306 I
I l
l 5311 5305 5300 5313 5315 l
l l
l Start-Up Book completed to Step N/A l
l (during start-up or power changes)
Comments I'lfrue,
so w isi m.:2. w o
u r.
e Attachment A 7
Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 9'
SGIVICO PUBLIC SERVICE COMPANY OF COLORADO 3.0 PERSONNEL STATUS OFF-GOING ON-COMING 3.1
. Shift Supervisor (SRO) 6.6.SUher Reactor Operator (SRO)
NA MM E. Reactor Operator (RO)
- J. Oters/c-$r; W. Reactor Operator (RO)
- 2. 4de Reactor Equipment Operator (F.B.)
6.7Wr/a Turbine Equipment Operator (F.B.L.)
L.OdoEuo I. Auxiliary Tender (F.B.)
C. b lJ
- 0. Auxiliary Tender (F.B.)
A trJhrg/s
- Health Physics Technician (F.B.)
L.A 8ms
- Lead Security Officer (F.B.)
- d. Eacloved
- Names will be added after they report for duty.
3.2 Remarks it m v.
~
t I
l I
FORM (8)M.22 3t%1
u.,
Attachment A Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 e
Page 8 of 12 A
werVICG PUBLIC SERVICE COMPANY OF COLORADO 4.0 SPECIAL INTEREST ITEMS 4.~ 1 LCO's in grace period or violation
!Ifn.LG, 4.2 Non routine testing in progress (1D1tr>
9 4.3 Surveillance required to be performed prior to 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> today.
FllMc s 4.4 Emergency maintenance work in progress.
!? &19 f F oA M i8t 33. =. 3643
SMAP-8 Attachment C pub ljC FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 g
of M A Service PUELIC SERVICE CO.Y.PANY OF COLORADO 4.5 Operating instructions listed in order of decreasing priorities.
fin $1A W D n npl 8 i a /7 @ 6 5 Vn Defj%
/
y
/
041 fil 8 Am Ools he ek ki OLn U
.hofDin ed b.ansb r,,
4.6 Indicate the status of a'ny inoperable radiation monitors on I-14 This should include spare monitors being used to insure-operability of normal monitors.
Ald I
4 l'
i d
0 D ( k /1 $r, S t..
Off-Gding Reactor Operator On-Coming Reactor Operator s
,i e,
foRMiBIM O 3643
'/
3
SMAP-8 Attachment C Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 0 service "9"
PUBLIC SERVICE COMPANY OF COLORADO 5.0 Items to be reviewed after coming on shift.
5.1 Reactor Operator Logs (All R.O. Logs and Data Sheets) l_l 5.2 LCO compliance Log l_l 5.3 Plant Trouble Reports J_l 5.4 Clearance Log l[l 5.5 0.D.R. Log l[I 5.6 TCR Log l[
5.7 Start-up Book l_l On-Duty Reactor Operator 4
4 7OP M (8) V2 2 3643
- s
's.
SMAP-8 Public FORT ST. VRAIN NUCLEAR GEMERATING STATION Zssue 1 0SerVICO g
of M PUBUC SERVICE COMPANY OF COLORADO 5
WEST REACTOR OPERATORS SHIFT TURNOVER CHECKLIST
,-/
On'-Coming Shift W C C to 2<l00
/
(ON)
(OFF)
~
6//S/A5 Date 1.0 NARRATIVE LOG AND DATA SHEET REVIEW 1.1 Reactor Operators Narrative Log
((l 1.2 Primary Coolant Moisture Data l[l a
1.3 Water Chemistry Status Report l[I 1.4 P.P.S. Logs, Status
((l
+
i
~
1.5 Surveillance Test Status l_l 1.6 LC0 Compliance Log Status
![I t,
5 5
i FORM (Bj372 22 3643
iin-6 Attachment A Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 Service eust C ssRvlCE COMPANY OF COLORADO 2.0 PLANT STATUS LOG l
l Date bl/8/85 Time 1500 Operator 5. Lht M k SL.
1 l
l l Reactor Power
/,5 Electric Load 2ZO MW I
I I
l PCRV Pressure (o36 psia Average Core Outlet
/360
- F l
l l
l Total Helium Flow 68 Circ. Inlet Temp.
64.3
- F I
I l
/@D
- F Hot Reheat Steam
/ Cod
- F i
1 1
I Primary Coolant 0xidants CO O ppm, CO o
ppm, H O O ppm 2
2 I
increasing decreasing steady i
I I
I Analytical Moisture Monitors in Service 9305 None I
I Region Outlet Temperature Alarms on Data Logger I
i
@(OtrCle "None" or list region and status, e.g. 24/300)
I i
3 I
l hD 1
System 46 Pumps B
System 47 Pumps hB I
i l
l Waste Releases In Progress h
i R/A Liquid YES 1
1 1
1 R/A Gas YES h
Reactor Sump > 10 gpm YES Comments: Stg c,
FORM (817..C %13
u.,r :
Attachment A FORT ST. VRAIN NUCLEAR GENERATING STATION lssue 1
@ Public 9'
Service PUBUC SERVICE COMPANY OF COLORADO l
l He Purification Trains l
I l-l Service Stan b Regeneration l
l-A B
A B
-Regen A
B None i l
I
.l lH Getters 2
1 -l l
l In Service tandby Activating None I
l A
B A
B A
B Fire Water Booster Pump In Service A
B l
l BUBW In Service NO Brg. Water Make-up From P-2105 P-2108 ' Gravity Other
~
l l
P-2105/ Gravity Feed From Deaerator CST OM Turbine Water Removal Pump In Service B
Pelton Water Return To aera Condenser Cond. Pump Suction l
l Buffer He Make-up From QMed Heh Bottle Farm h
l RMS Position Fuel Load Off l
ISS Position Start Up Low Power l
Plant Control Systems for > 30%
Manual N/A I
I I
I A
B C
D l
l Circulator Speed
$3cr) 6600 56kY) 560(3
^
l
. Motive Power hC hC hC hC Comments:
/l/r21_o 5
FCRM iel 372 22 + 3643 8
w.c.. -i Attachment A Public FORT ST. VRAIN NUCLEAR GENERATING STATION lssue 1
@ SerVICOPUBLIC SERVICE COMPANY OF COLORADO l
l LOOP 1 EES In Service YES N0 1
I e
1 l
EES Supplied From FW EFW EM Cond.
N/A I
I l
I Reheater In Service YES N0 1
I l
i Reheater Supplied From 150 psi CRHT BPFT EM
.N/A l
l Steam Steam Steam Cond.
Reheat Attemperators In Service NO Flow 27 K. #/hr.
Main Steam Bypass Open YES
~
h l
Start-up Bypass Open YES l-LOOP 2 EES In Service NO EES Supplied From h
N/A
]
Reheater.In Service NO Reheater Supplied From 150 psi CR BPFT EM N/A
-l l
Steam Steamj Steam Cond.
Reheat Attemperators In Service NO Flow f7f #/hr.
h l
l Main Steam Bypass Open YES l
Starc-up Bypass Open YES Commerits:
Mitt FORM tB)372-:2 3643 n'
k J-w.e - -
Attach en: A Public FORT ST. VRAIN NUCLEAR GENERATING STATION-Issue 1 E'
U SOTVICO PUBUC SERVICE COMPANY OF COLORADO h
l Condensate Pumps A
B h
l l Condensate Polishers A
L.P. Heaters M
h YES h I L.P. Heater Shell Flooded
- 2 YES
- 3 l
Deaerator In Service NO l
l g( m l Deaerator Steam Source 150 psi CRht N.A.
Boiler Feedpumps In Service
,) @
None l
l H.P.: Heaters In Service None n
l Pre-Boiler Recirc. In Service YES Circulating Water Pumps In Service hh@@
~ ~ ~ ~ ~ ~
Hot Reheat Bypasses Open
- 1
- 2
- 3
- 4
- 5
- 6 l
l HS-3220 Position h
- 2
- 3
- 4
- 5 l
Drainage Flowpath Normal Direct to Decay Hea l
l Condenser Exchanger
.t i
I l
l Decay Heat Exchanger Supplied From l
l BPFT Loop 1 Rht Loop 2 Rht h
Station Housepower RAT l
I
)
I 'l Emergency Diesel 6
B C
D STBY l
Generators B) hM h/ PAR.
l ACM D-G YES NO Main Bus Links In Place NO h
Station Batteries On Overcharge A
-B C
Ccmments& A/Aths,.lso,a onm1/> <v&
hv />udd
/
/
1 mwe,m.=.m
- i..n. -i Attachment A Public _
FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 b
Service PUBLIC SERVICE COMPANY OF COLORADO h
l l Service Water Pumps A
AhlR)
BMLR)
. Service Water Tower Fans None l _l Instrument Air Compressors hB
-l l
l
~l Main Tower Fans A B
C D
E F
G H
I J None i
I l
l H/L/R Q
j[
Q y
y y
l}
g y
2 l
l
'l l P.P.S. Moisture Monitors Tricoed l
1118 1117 1116 1119 1115 1120 1121 1122 l
Penetration Interspace Pressure > PCRV NO DEPRESS Circulating Water MU Pumps B
C
.l l River Makeup Pumps l
l St. Vra Platte River l
l A
B None B
None
- 1. l l
l 230 KV Status (Circle any breaker open or out of service)
-1 l
l l 5309 5307 5301 5317 5319 I
I l
l 5310 5306 l
l l
l 5311 5305 5300 5313 5315 l
I l
l Start-Up Book completed to Step N/
l l (during start-up or power changes)
Comments l' /Yllf 3 FORM 15:372 3 3643 e
Atcachment A Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 SOTVICO PUBLIC SERVICE COMPANY OF COLORADO 3.0 PERSONNEL STATUS OFF-G0ING ON-CCMING 3.1 Shift Supervisor (SRO) 6.C".Sii,[/ef-Reactor Operator (SRO)
NJ
.V.4 E. Reactor Operator (RO)
- f. Cef.:de fc W. Reactor Ope. 2 tor (RO)
/. Ldwse Reactor Equipment Operator (F.B.)
- 6. hrtp_
Turbine Equipment Operator (F.B.L.)
L.d50 pus I. Auxiliary Tender (F.B.)
C. hlJ
- 0. Auxiliary Tender (F.B.)
A ujhrgh
- Health Physics Technician (F B )
L./~ [ ems
- Lead Security Officer (F.B.)
- d. En4,W
- Names will be added after they report for duty.
3.2 Remarks 11 mw,
e l
9 FCAM t212n O.3643
...s.
A :achment A Public FORT ST. VRAIN NUCLEAR ' GENERATING STATION Issue 1 service PUBLIC SERVICE COMPANY OF COLORADO 4.0 SPECIAL INTEREST ITEMS 4.1 LCO's in grace period or violatian rl/MA G 4.2 Non-routine testing in progress fil'rStos 4.3 Surveillance required to be performed prior to 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> today.
rlfrtic >
9 4.4 Emergency maintenance work in progress.
11mr e,
Fonuist 372 2 3643 J
SYAP-8 Attachment D Public FORT ST. VRAIN NUCLEAR GEMERATING STATION Issue 1 SerVICO PUBUC SERVICE COMPANY OF COLORADO 4.5 Operating instructions listed in order of decreasing priorities.
fmt'lIhnp, Mth 6$iNu? h MYo ONnC4.3
~
u a li) 23 " A N ho, G h A a p
'O
. h r Wth 41 o b b aphtNJ' 0>.
4.6 Indicate the status of any inoperable radiation monitors on I-14.
This should include spare monitors being used to insure operability of normal monitors.
A/ A
~
P M l b ?.>
Off-Going Reactor Operator On-Coming Reactor Operator
.g i
FORM 1813*2 22 3643
SMAP-8 Attachment D Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 SerVICO PUBLIC SERVICE COMPANY OF COLORADO 5.0 p0ST SHIFT TURNOVER CHECKLIST (Items to be reviewed after coming on shift.)
5.1 Reactor Operator Logs (All R.O. Logs and Data Sheets) l_l 5.2 LCO Compliance Log l[l 5.3 Plant Trouble Reports l[l 5.4
' Clearance Log l[I 5.5 0.D.R. Log l[l 5.6 TCR Log l[l 5.7 Start-up Book l[l On-Duty Reactor Operator FORM (Bs 372 22 3M3
SKAP-8 Attachment E Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 9
Service PUBLIC SERVICE COMPANY OF COLORADO REACTOR EQUIPMENT OPERATORS SHIFT TURNOVER CHECKLIST On-Coming Shift /600 tofe/OO Date takSk5 1.0 NARRATIVE LOG AND DATA SHEET REVIEW 1.1 Reactor Equipment Operator Narrative Log l_l
~
1.2 Reactor Equipment Operator Log #1 l_l 9
e FORM (Bl372 2 3643
. ~..... _. _ _.
SMAP-8 Attachment E Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 OSerVICO
- 9' PUBLIC SERVICE COMPANY OF COLORADO 2.0 REACTOR EQUIPMENT OPERATOR PLANT STATUS LOG Operator 6,2a\\klo, l
l Date d>//B/AS Time
/ 6N')
i 1
l l Reactor Power (4
Electric Load 22d MW l
l l
l PCRV Pressure 636 psia Average Core Outlet /36 0 F
I i
l l Main Steam Temp. /006 F Hot Reheat Steam Temp. /no() F I
I l
l Primary Coolant 0xidants CO O ppm, CO C3 ppm, H O O
_ ppm 2
l increasing decreasing steady I
l l
l Analytical Moisture Monitors in Service l
l ME9305 ME9306 t/
ME9307 /
I I
l l He Purification Train Servic Stan Regeneration l
l l
lH Getters I
l l
l In Servi andby Activating None l
l A
B A
B A
B l
l l
l He Circulator Status I
I l
l A
B C
D l
l Circulator Speed SRT) 5Sco Scvv3 SW) hFWC
@FWC hFWC hFW C Power Source l BUBW Header In Service h NO Brg. Water Make-up From P-2105 P-2108 G avity l
l P-2105/ Gravity Feed From Deaerator CST l
Pelton Water Return To Deaer D Condenser Cond. Pump Suction I
l l
l Buffer He Make-up From urified Bottle Farm Comments:
d/tne,
FoRMigl372 22 3643
SMAP-8 Attachment E FORT ST. VRAIN NUCLEAR GENERATING STATION lssue 1 OPublic 9
service PUBUC SERVICE COMPANY OF COLORADO l
N0 I
I l
l EES Supplied From FW EFW EM Cond.
N/A l
l l
l Reheater In Service YES NO I
I l
l Reheater Supplied From 150 psi CRHT BPFT EM N/Al l
l l
Steam Steam Steam Cond.
Reheat Attemperators In Service NO Flow d#/hr l
l Main Steam Bypass Open YES 0
I I
l l
Start-up Bypass Open YES NO LOOP 2 EES In Service N0 l
l EES Supplied From EFW EM Cond.
N/A l
l Reheater In Service NO l
l Reheater Supplied From 150 psi RHT BPFT EM l
l Steam Steam Steam Cond.
Reheat Attemperators In Service NO Flow 77L'
- /hr.
h l
l Main Steam Bypass Open YES l
Start up Bypass Open YES hh 005 Moisture Monitor Dewars Normal l
l Rad Waste Release in Progress I
l-l l
R/A Liquid YES #
l l
R/A Gas YES #
1 I
Comments:
il mws FORM t81372 22 3643
SMAP-8 Attachment E FORT ST. VRAIN NUCLEAR GENERATING STATION hsue 1 O Public 9
Service PUBUC SERVICE COMPANY OF COLORADO l
l Liouid Waste System Status Tank in Service B
Tank Recircling A
B Monitor l
l Demin In-Service A
B N/A I
I l
l Status of Off-Line PIG CLEAN DIRTY MAINT.
l l
l l
I I Gaseous Waste System Status l
I l
I Tank In-Service A
B I
I l
l Tank Off-Line FULL EMP BEING SAMPLED Compressor In Service B
BOTH l
l Surve111ances SR-0P-29W Plant Recorder YES NO Comments 11 Mt e-3.0 PERSONNEL STATUS - (Non-Applicable)
)
i I
FORMiBI372 22 3643
SMAP-8 Attachment E Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 O
SerVICO PUBUC SERVICE COMPANY OF COLORADO 4.0 SpECIAL INTEREST ITEMS 4.1 RSD panel status (explain reason for any alarms that are up).
NA 4.2 Non-routine testing in progress (effecting
- E.O.'s area of responsibility).
R MW 4.3 Equipment Operator surveillance tests in progress at shift change.
til'rR9 s 4.4 Emergency maintenance work in progress.
itmus FCRM tBl372 22 3643
.SPAP-8 Attachment E Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 9
SerVICO PUBUC SERVICE COMPANY OF COLORADO 4.5 Special operating instructions.from the Shift Supervisor (or Reactor Operator).
s, it/ritp; 4.6 All Station logs, tests, and data sheets are
.f properly signed and dated.
IA_
6.bAL Off-Going Equipment Operator Oncoming Equipment Operator FORM t81372 22 3643
SMAP-8 Attachment E Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 Service PUBUC SERVICE COMPANY OF COLORADO 5.0 POST SHIFT TURNOVER REVIEW (Items to be reviewed after coming on shift.)
5.1 Reactor Equipment Operator Log #2
((l 5.2 Purification train regeneration log (if applicable)
N/A l_l l_l 5.3 Turbine Equipment Operator narrative log l[1 5.4 Turbine Equipment Operator Log #1 l[l 5.5 Turbine Equipment Operator Shift Turnover Checklist l[l 5.6 Plant Trouble Reports l[l 5.7 Clearance Log l[I 5.8 0.0.R. Log l[I 5.9 T.C.R. Log l[l On Duty Reactor Equipment Operator FORM (8 372 22 3643 L__
SMAP-3 Attachment F Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 9
SerVICO PUBUC SERVICE COMPANY OF COLORADO l
TURBINE EOUIPMENT OPERATOR SHIFT TURNOVER CHECKLIST On-Coming Shift
//<-(T) to 2dod Date Co//A/M 1.0 NARRATIVE LOG AND DATA SHEET REVIEW 1.1 Turbine Equipment Operator Narrative Log
((l 1.2 Turbine E.O. Log #1 l[j FOR M 181372.=. 3843
SMP-8 Attachmont F Pubile FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1
- 9' SerVICO PUBLIC SERVICE COMPANY OF COLORADO 2.0 TURBINE EQUIPMENT OPERATOR STATUS LOG l Oate
l l Reactor Power c,5 Electric Load 2 2 0 MW h
EES Supplied From h
Reheater In Service NO I
l l
l Reheater Supplied From 150 psi CRHT BPFT EM N/Al l
l l
Steam Steam Steam Cond.
I I
l l
Reheat Attemperators In Service NO Flow 27f #/hr.
h l
l Main Steam Bypass Open YES h
l Start-up Bypass Open YES l LOOP 2 EES In Service NO EES Supp1ted From h
N/A
~
Reheater In Service NO l
l Reheater Supplied From 150 psi CRh BPFT EM N/A l
l Steam heam Steam Cond.
l l
Reheat Attemperators In Service h
NO Flow 27t#/hr.
l Main Steam Bypass Open YES
~
l Start-up Bypass Open YES h
l l
Hot Reheat Bypasses Open YES Comments:
ilmscy FoRMigl3*2 22 3843
SPAP-8 Attachment F Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 E'
SerVICO PUBUC SERVICE COMPANY OF COLORADO 1
I Hot Reheat Attemperators lined up properly NO l
l (if NO, explain in comments)
I I
l HS 3220 Position
- 2
- 3
- 4
- 5 l
l Drainage Flowpath Normal Direct to Decay Heat l
l Condenser Exchanger l
l Decay Heat Exchanger Supplied From BPFT Loop 1 RHT Loop 2 R P-2105 supplied from CST l
Fire Water Booster In Service A
B h Condenser Cond Pump Suction Pelton Water return to
@ to l
I Deaerator drain open YES COND.
Misc. D.TK.
Turns l
Cire. Water Pumps in service @ h @ h I
i l
l Main iower fans A B C D E F G H I J None l
l l
l H/L/R sl_ y y y L} U y y y ff Condensate Pumps' ~
"A B
2 l
l S.J.A.E. in service NO 1
- 2 l
l PRI SEC h
Hog Ejector in service YES l
l L. P. Heaters in service NO h
l L. P. Shells flooded YES h
Deaerator in service NO llDearatorsteamsource 150 psi CRht N/A h
h BFP's in service B
None Comments: h b
herf an it n< n n !>c if 6 u h J +4,
n
)
y
/
/N A l il 1{ A it.f f FORM 18152 3 3M3
SMAP-8 Attachr.ent F Public FORT ST. VRAIN NUCLEAR GENERATING STATION Tssue 1 0 Service 9"
PUBUC SERVICE COMPANY OF COLORADO l
l H. P. He.aters in service h
None h
Pre-Boiler Rectrc. in Service YES I
I l
l Emergency Firewater Booster l in service P-2109 P-2110 l
l Emergency Diesels in standby h NO Main Bus Links in place NO Station Batteries on overcharge A
B C
j I
l l
l Auxiliary Boiler Status l
Inside STANDBY MAINT.
Outside IN SERVICE MAINT.
l l Waste Releases in progress l
l l
l R/A Liquic.
YES #
l I
l l
R/A Gas YES #
l 1
l l Surveillances l
SR-OP-29W Plant Recorders YES NO l
l SR-OP-21-W GE Turbine Generator YES NO Coments bit A4'f e n br i b
[M > /h t tah [1?> ht'Ol LNu V
. A l'h t H f f 3 t rN1 N h b
bm bra >br hi nt,a rA fl bn/1( ok nit $
Olbi
( fl h N5 2-V
~-
3.0 PERSONNEL STATUS - (Non-Acolicable)
~ ~~
FORMIBl772 3 3643
ShnP-5 Attachment F Publig FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 0 Service Page 5 of 7 PUBUC SERVICE COMPANY OF COLORADO 4.0 SPECIAL INTEREST ITEMS 4.1 Non-routine testing (effecting E.O.'s area of responsibility) in progress.
11/ r1( D 4.2 E.
O.
surveillance tests in progress at shift change,.
11 tat o, 4.3 Emergency maintenance work in progress
/2/PR c s 4.4 Special operating instructions from the Shift Supervisor (or Reactor Operator).
Il mt c-FO R M (81272. L*. 3643
SMAP-8 Attachment F Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 Page 6 of 7 Service pusuc sanvece comeAny or cot.onAno 4.5 All station logs and data sheets are properly signed and dated.
l[
- d. Bathun
~
'~
~ Off-Going Turbine Equip Operator Oncoming Turbine Equip.0perator' -
l FCmM egl372. 3 3e43
SMAP-8 Attachment F Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 0 service Page 7 of 7 PUBUC SERVICE COMPANY OF COLORADO 5.0 POST SHIFT TURNOVER REVIEW (Items to be reviewed after coming on shift.).
5.1 Reactor Equipment Operator narrative log l[l 5.2 Reactor Equipment Operator Shift Turnover Checklist l_l 5.3 Plant Trouble Reports
((l 5.4 Clearance Log l[l 5.5 0.D.R. Log l[l 5.6 TCR Log l[I
~
l On-Duty Turbine Equipment Operator l
I l
l t
9 FCRMitl372 :2 3843
SMAP-8 Attachment G Public FORT ST. VRAIN NUCLEAR GENERATING STATION lssue 1 G Service 9
PUBLIC SERVICE COMPANY OF COLORADO INSIDE TENDER SHIFT TURNOVER CHECKLIST On-Coming Shift /6dO to2d6d (ON)
(0FF)
Date 6//A/65 1.0 NARRATIVE LOG AND DATA SHEET REVIEW 1.1 Inside Tenders Narrative Log l[l 1.2 Inside Tender Log #1 l[l 1.3
' Daily Water Chemistry Status Report l[l e
O FORM (8:372.u 3643
SMAP-8 Attachmen% G Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1
- 9' SerVICO PUBLIC SERVICE COMPANY OF COLORADO 2.0 INSIDE TENDER PLANT STATUS LOG
^
l l Date 6//B/A5 Time
/$ m Operator O.
4d 1
I 1
I Reactor Power G$
Electric Load 22d MW l
l l
l He Circulators in service Motive Power
@FWC
@FWC hC hFWC Condenser in service NO l
l Ultra-Filtration Unit in Service YES h
l l Deaerator In Service NO Pre-Botier Recire, in Service YES l
NO EES Supplied by EFW EM Cond.
l l
Chemical Injection Points [Al.J/A.
l LOOP 2EESInService h
NO l
l l
EES Supplied by h
~
l Chemical Injection Points k ///.
@VV 1
-l l
l R. O. Unit in service NO h
l Building Heating in Service YES Heat XCHGR I
I m
l l
Makeup Train discharge to d ONDENSER )
CST l
Aux Boiler in service (I M OUTSIDE NONE I. l Comments:
flirn ej l
l l
i 1
,om,,, m. n. -
SPAP-8 Attachment G Public FORT ST. VRAIN NUCLEAR GENERATING STATION I:, sue 1 9
Service rusuc ssRvics cOukANY OF COLORADO J
i a
l l Waste Releases in Progress i
R/A Gas YES' Ammonia, Hydrazine, Sulphite Mixing Tank Levels > 30%
NO l
l Ammonia Pumps TO MAN OFF
.l 1
1 I Hydrazine Pumps A
MAN OFF l
Sulphite Pumps MAN OFF l P-3308 IN SERVICE N
AUTO MANUAL l
PCV 33148 In Service YES h
Inst. Air Compressors In Service B
Service Water Booster Pump In Service
@B h@E l' i Service Water Return Pumps In Service @
h
~
C l
l Misc Drain Tank Drain Path CST I
l c
l Service Air Source SAC
.l l Suveillances l'.
SR-OP-29W P; ant Recorder YES NO I
I Comments /
/loM Es 6
f FORM 181272 22 3u3
SMAP-8 Attachment G Publi'j FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 0 Service
- 9' PUBLIC SERVICE COMPANY OF COLORADO 3.0 PERSONNEL STATUS - (Non-Applicable) 4.0 SPECIAL INTEREST ITEMS 4.1 Non-routine testing (effecting the Auxiliary Tenders area of responsibility) in progress.
IL O11 0,
4.2 A.T. surveillance tests in progress at shift change.
Il m te s 4.3 Emergency maintenance work in progress.
/lh111 /
FORMie372 22 3t43
SMAp-8 Attachment G Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 0 Service O
PUBUC SERVICE COMPANY OF CCLORADO 4.4 Special Operating instructions frem the Shift Supervisc7; (or Reactor Operator) lifr1%
I l
4.5.. All station logs and data sheets are properly signed and dated.
l[
9 0 LNM1tt Off-Going Inside Aux Tender On-Coming Inside Aux Tender l
l wm,,, m. n. m
SMAP-8 Attachment G Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 9'
SerVICO PUBLic SERVICE COMPANY OF COLORADO 5.0 POST SHIFT TURNOVER CHECKLIST (Items to be reviewed after coming on shift.)
5.1 Water Tender log l[l 5.2 Outside Tender narrative log l[l 5.3 Outside Tender Shift Turnover Checklist l[l 5.4 Plant Trouble Reports l[l 5.5 Clearance Log l[l 5.6 0.D.R. Log l[l 5.7 TCR Log l[l 5.8 Inventory report (previous shift) l[l On-Duty Auxiliary Tender t
l FORM (81T2 3 3643
- 1. d -i AttaChOer.t N Public FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1
- / b SerVICS Page 1 of.5 gj PUBUC SERVICE COMPANY CF COLCRADO OUTSIDE TENDER SHIFT TURNOVER CHECXLIST On-C: ming Shift /6,O D to S MO O Date lob 8k5 1.0 NARRATIVE LCG AND CATA SHEET REVIEW 1,1 Outside Tenders Narrative Leg
((l 1.2 Outside Tenders Log #1-l((
1.3 Daily Water Chemistry Status Report l[l FCAMiB1372 22 3613
3/...; :
A;;achment M
.f Pub llC FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1
~
^j SerVICS PUBLIC SERVICE COMPANY OF COLORADO 2.0 OUTSIDE TENDER PLANT STATUS REPORT i
l l Date 4,//p/at5 Time
/50 0 Operator 6 //J 'r ep l s g
l l Reac:cr Pcwer
I l
l Main Tcwer Fans A B
C D
E F
G H
I J
None 1
I l
l H/L/R y I-/ Jt]
y Ll
//
y y
yy hlR)
B ' d L R)
Service Water Tcwer Fans A
h l He Circulator N Pres. Sys. in Service YES Emergency Cavity Pressurization in Service
.YES I
I l
l Waste Release in Progress R/A Liquid YES 4
Tur'ine Euilding Su=p Blewdewn to SE QUby l
o SLCUGH I
I l
l Main Tcwer Blowdown to (GOOSEQUILLj SLOUGH I
l l
l Main Tcwer Elewdewn HOT D
COLD../6Do RAW
()
I l
l l Shallow Well Status l
Supplying Plant h #4 h
- 11
- 9
- 12 h h
- 10 l
l Irrigation
- 3
- 11
- 12 l-1 Comments:
//mi c i
C FORM t973'2 '2 0&L3 L-,,
- n.-..--.,,
~, - - - - - - < - - -
.. u-} - -
Attacnten. H PublIC FORT ST. VRAIN NUCLEAR GENERATING STATICN I55CE 1 SerVICO-PUBLIC SERVICE COMPANY CF COLORADO-l l River Pumo Status I
l l
Supplying Storage Ponds SV "A" SV"B" PR"A" PR"B" None l
l Supplyi,ng Others (specify) upa,
_ _ u..
l 1
I l
I I
I I
I I
l I.
I i
I I
River Screen Wash Status PR ia&Mw I
l
.l l Waste Evaporation Ponds in Service NW NE l
LN Dewars, DRAW FROM SOUTH l
l RECIRC TO
_ 40RTH SOUTH l
l VENT NORT SOUTH I
I l
l Surveillances I
l l SR 5.2.24.a-D Cire Water Makeup System Pond Inc.: YES NO SR-OP-29W Plant Recorder YES NO Comments:
ti/ru 0; 3.0 PERSONNEL STATUS - (Non-Applicaole) 4.0 SPECIAL INTEREST ITEMS 4.1 Ncn-Routine Testing, surveillance tests, and maintenance work (effecting Auxiliary Tenders area of Responsi'flity) in progress.
o fefr1ur >
l'
{
[
,c~i m. u.x
~,
a l
^
~
A-ta-hmen "
~. PubilC FORT ST. VRAIN NUCLEAR GENERATING STATICN Issue 1
,.I E'
~
I SGTVlCS PU3LIC SERVICE COMPANY OF COLORADO 4.2 Condition-of Main and Service Water Cooling Towers. (Normal,orrlist condition,. e.g.
icing up, etc.)
Ok/) >
dML41 4.3 Road conditions or hazards encountered during rounds (this should include vehicle-problems).
~
Q V
i 4.4 Special cperating instructions from the Shi.ft Supervisor (or Reactor Operator).
N Af f o,
4.5 All station logs and data sheets are properly signed and dated.
l/
f a)/udo Off-Going Outside Tender On-Coming Outside Tender 70AMit:3122 - %Q
Attac=en. H
/ de PublIC FORT ST. VRAIN NUCLEAR GENERATING STATION Issue 1 Pace o, of 5 i' 'gj SerVICS PUBLIC SERVICE CCMPANY CF COLORADO
~
5.0 POST SHIFT TURNOVER CHECKLIST (Items to be reviewed after coming en shift.)
5.1'
_Inside T' ender narrative log.
l[l 5.2 Inside Tender Shift Turnover checklist l[]
~
5.3 Plant Trouble Reports l_l 5.4 Clearance Log l[I 5.5 0.0.R. Log l[1 5.6 TCR Log l[l 5' 7 Inventory Report (previous shift) l[l On-Duty Outside Auxiliary Tender I
j.
i i
l.
I
(=
FORM tBl37 3 3M3 L_
CONTR01. ROOM INPUT AND PROMPTER CARDS TIME RECIPIENT DESCRIPTION 00:00 Event:
Earthquake Control Room indications:
SS ERO WR0 Tremor is felt ERO I-06E, 5-5 (seismic instrumentation) alarm ERO Alarms on I-06G indicate trip of cooling water tower fans:
1-4 (A fan), 2-4 (B-fan), 3-5 (H-fan), 4-5 (I-fan), 5-5 (J-fan), 1-7 (Tower fan trip).
Green and white lights on control board indicate A, B, H,
I, and J fans have tripped.
SS Magnitude assigned by Results Department to be 0.079 ground acceleration I-14 RIS-9301 indicates 6.1 X 10' cmp for duration of drill.
Prompter Anticipated _ actions:
1)
Immediate actions per EP K-1 2)
Dispatch outside auxiliary tender to inspect-and restart tower fans 3)
Shift Supervisor declares Alert and begins making notifications per RERP CR 4)
Follow up actions per EP K-1 5)
Shift Supervisor begins orderly plant shutdown
1 CONTROL ROOM INPUT AND PROMPTER CARDS TIME RECIPIENT DESCRIPTION 00:45 Event:
Strong. Earthquake Aftershock SS, ERO, WR0 Tremor is felt ER0 The condenser north wall ruptures where the reheat bypass lines go into the condenser a)
I-06C 2-3 (Condenser low vacuum) b)
I-06C 1-3 (Condenser emergency vacuum) c)
I-06D 3-3 (Low vacuum trip) 1-1 (stop valves closed)-
d)
I-06C 5-6 (Hot reheat bypass valve vacuum trip)
(Both electromatics open) e)
local indication Turbine-driven. Boiler Feed Pump (TOBFP) turbine hoods begin overheating I-06 E 3-6 (4 KV bus undervoltage) 3-7 (480 V bus undervoltage)
All outside line breakers have green and white trip.
indications.
Normal plant lighting goes out.
Innumerous alarms associated with Turbine trip and loss of outside electric power.
b y-
,..-.e
,_e---
--m
-~
CONTROL ROOM INPUT AND PROMPTFR CARDS TIME RECIPIENT DESCRIPTION ER0 I-050 2-2 (Helium circulator 1C loss of bearing water) 5-2 (Helium circulator 1C trip first) 1-050 2-4 (Helium circulator ID loss of bearing water)
I-050 5-1 (Helium circulator 1C loop shutdown trip)
I-05D 5-3 (Helium circulator ID loop shutdown trip)
I-05D 5-6 (Loop 2 shutdown first)
Loop 2 helium circulator auxiliaries isolate normally Loop 2 secondary coolant isolates normally I-06G 1-4, 2-4, 3-4, 4-4, 5-4, 1-5, 2-5, 3-5, 4-5, 5-5, 1-7 (main tower fans tripped),
2-7, 3-7 (service water tower fans tripped)
Both diesel / generator sets start and load normally WR0 I-03A 5-1, 5-2, 5-3 single channel scram, I-03B 4-1, 5-1, 6-1 two Loop trouble.
Reactor scram (low vacuum), if not already scrammed.
0AT Outside auxiliary tender finds north 3 cells on main cooling tower partially collapsed.
Prompter Anticipated actions:
Immediate actions per Emergency Procedures (EPs) F-2, F-3, B, and C Follow-up reports to NRC and State by Technical Support Center or Shift Supervisor Follow-up actions per EPs F-2, F-3, B and C
=.
CONTROL ROOM INPUT AND PROMPTER CARDS 4
TIME RECIPIENT DESCRIPTION Restart follow-up actions of EP K-1 Dispatch outside auxiliary tender to restart Service Water Fans and check Main Cooling Tower.
01:00 Event:
TDBFPs high vibration ERO I-06A 4-3 (turbine)
I-06A 5-1 and 5-4 (low Boiler Feed Pump flow)
PI-3104 and PI-3106 I-06 indicating falling pressure FR-2205 and FR-2206 I-05 indicating falling flow Prompter Anticipated actions:
Trip both TDBFPs Put condensate on Loop I EES section of steam generator 01:15 Event:
Primary coolant leak through Loop I reheater (nonisolable leak through electromatic)
WR0 I-05B 1-4 (Loop 1 hot reheat pipe activity high)
I-03A 4-7 (Loop I reheat activity high)
I-05A 2-5 (Loop I reheat header activity high)
Prompter Anticipated actions:
Advise. Technical Support Center of condition, and ask them to initiate dose assessment Place A
and B circulators on condensate water turbine drives
CONTROL ROOM INPUT AND PROMPTER CARDS TIME RECIPIENT DESCRIPTION ERO As attempt is made to isolate Loop 1 reheater a)
HV-2253 broken operator b)
V-52110 stem broken c)
PCV-5221-1 failed open ER0 Initate actions per EP H-3 01:30 RE0 You have a compound fracture of left leg you slipped on spilled wet and oily resin at level 3 Health Physics storage area).
Page the Control Room and inform them of your condition and location.
Prompter Page by Reactor side Equipment Operator Prompter Anticipated actions:
CR should get page from Reactor side Equipment Operator Initiate FSV Medical Emergency Plan Ask Technical Support Center to arrange for a replacement Equipment l
Operator 02:00 Event:
Outside power becomes available WR0 Phone message from Lookout Center Dispatcher (Pawnee line charged to FSV switchyard) r l
l'
CONTROL ROOM INPUT AND PROMPTER CARDS TIME RECIPIENT DESCRIPTION Prompter Anticipated actions:
Power up the 4160 V busses and non-essential 480 V busses Begin picking'up non-essential loads as required.
Charging the essential 480 V busses from a single outside power line to be at the Shift Supervisors discretion.
TECHNICAL SUPPORT CENTER INPUT AND PROMPTER CARDS TIME RECIPIENT DESCRIPTION 01:15 Radiochem-Plateout Activity = 4.0 x 10 istry Person, C1 equivalent 1182 Technical for duration of drill Support Person SEE Radiochem-Circulating activity =
BELOW istry Person, SEE BELOW Technical Support Person 01:15 3.84E+03 Ci equivalent I1
01:30 3.54E+03 Ci equivalent I2'2 01:45 3.22E+03 Ci equivalent I232 02:00 2.86E+03 Ci equivalent I2'1 02:15 2.45E+03 Ci equivalent It'1 02:30 2.11E+03 Ci equivalent I1'1 02:45 1.82E+03 C1 equivalent I1
03:00 1.57E+03 Ci equivalent I282 03:15 1.35E+03 C1 equivalent I2'1 03:30 1.17E+03 Ci equivalent 12'2 03:45 1.02E+03 Ci equivalent I2'1 04:00 8.93E+02 Ci equivalent I2'1 04:15 7.84E+02 Ci equivalent I2'1 04:30 6.92E+02 Ci equivalent 1282 04:45 6.15E+02 Ci equivalent I282 05:00 5.50E+02 Ci equivalent I2'2 05:15 4.96E+02 Ci equivalent 11'1 i
TECHNICAL SUPPORT CENTER INPUT AND PROMPTER CARDS TIME RECIPIENT DESCRIPTION 05:30 4.52E+02 Ci equivalent I282 Graphs of Core Pressure and Temperatures will be provided to the Technical Support Center personnel during the exercise.
E
,