Proposed Tech Specs Tranferring Tables of Fire Detection Instrumentation,Deluge & Sprinkler Sys & Fire Hose Stations to Fire Protection Plan
ML20128F099
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/24/1985
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20128F084 List:
References
NUDOCS 8505290555
Download: ML20128F099 (6)


Text

.

INSTRUMENTATION FIRE DETECTION INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.7 ~ As a minimum, the fire dete: tion instrumentation required for protection of safe shutdown equipment in the Control Complex, Auxiliary Building, and Intermediate Building, as specified in the Fire Protection Plan, shall be OPERABLE.

APPLICABILITY:

Whenever equipment in that fire detection zone is required to be OPERABLE.

ACTION:

With one or more of the fire detection instrument (s), inoperable:

Within I hour, establish a fire watch patrol to inspect the zone (s) with a.

the inoperable instrument (s) at least once per hour, and b.

Restore the inoperable instrument (s) to OPERABLE status within 14 days or in lieu of any other report required by Specification 6.9.1, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next 30 days outlining the action taken, the cause of the.

malfunction and the plans and schedule for restoring the instrument (s) to OPERABLE status.

c.

The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

SURVEILI.ANCE' REQUIREMENTS 4.3.3.7.1 Each of the above fire detection instruments shall be demonstrated OPERABLE at least once per 6 months by performance of a CHANNEL FUNCTIONAL TEST.

4.3.3.7.2 "The circuitry associated.with the detector alarms. listed in the Fire Protection Plan shall be demonstrated OPERABLE at least once per 6 months for all National Fire Protectiori Association (NFPA) Code 72D Class B supervised circuits.

4.3.3.7.3 The non-supervised circuits between the local panels and the control room for the detectors listed in the Fire Protection Plan shall be demonstrated OPERABLE at least once per 31 days.

8505290555 850524 PDR ADOCK 05000302 P

PDR l

I CRYSTAL RIVER - UNIT 3 3/4 3-40 L

E

e i

DELETED l

l l

l l

4 l

CRYSTAL RIVER - UNIT 3 3/43-41 i

i

PLANT SYSTEMS DELUGE AND SPRINKLER SYSTEMS LIMITING CONDITION FOR OPERATION 3.7.11.2 The deluge and sprinkler systems required for protection of safe shutdown equipment in the Control Complex, Auxiliary Building, and Intermediate Building, as specified in the Fire Protection Plan sha!! be OPERABLE.

APPLICABILITY:

Whenever equipment in the deluge / sprinkler protected areas is required to be OPERABLE.

ACTION:

a.

With one or more of the above required deluge and sprinkler systems inoperable, establish a continuous -fire watch with backup. fire suppression equipment for tne unprotected area (s) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />; restore the system to -

OPERABLE status with 14 -days or, in lieu of any other report required by Specification 6.9.1, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within. the next 30 days outlining the action taken, the cause of the inoperability and the p'ans and schedule for restoring the system to OPERABLE status, b.

The provisions of Specification 3.0.3 and 3.0.4 are not applicable.

$URVEILLANCE REQUIREMENTS 4.7.11.2. Each of the above required deluge and sprinkler systems shall be demonstrated OPERABLE:

At least once per 12 months by cycling each testtble valve in the flow path a.

through at least one complete cycle of full travel.

I b.'

At least once per 18 months:

l 1.

By performing a system functional test which includes simulated automatic actuation of the system, and:

(a)

Verifying that the automatic valves in the flow path actuate to their correct positions.

l t

I l

l' CRYSTAL RIVER - UNIT 3 3/4741 F

l' L,

_j

-O DELETED CRYSTAL RIVER - UNIT 3 3/4 7-43

PLANT SYSTEMS FIRE HOSE STATIONS LIMITING CONDITION FOR OPERATION 3.7.11.4 The fire hose stations required for protection of safe shutdown equipment in the Control Complex, Intermediate Building, Turbine Building, and Auxiliary Building, as specified in the Fire Protection Plan shall be OPERABLE.

APPLICABILITY:

Whenever equipment in the areas protected by the fire hose stations is required to be OPERABLE.

ACTION:

With one or more of the fire hose stations inoperable, route an equivalent l-a.

capacity fire hose to the unprotected area (s) from an OPERABLE hose station within I hour.

b.

The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

SURVEILLANCE REQUIREMENTS 4'.7.11.4 Each of the above fire hose stations shall be demonstrated OPERABLE:

l a.

At ! east once per 31 days by:

1.

Visual inspection of the station to assure all required equipment is at the station, and b.

At least once per 18 months by:

1.

Removing the hose for inspection and re-racking, and l.

2.

Replacement of all degraded gaskets in couplings.

l c.

At least once per 3 years by:

1.

Partially opening each hose station valve to verify valve OPERABILITY and no flow blockage.

2.

Conducting a hose hydrostatic test at a pressure at least 50 psig greater than the maximum pressure available at that hose station.

CRYSTAL RIVER - UNIT 3 3/4 7-45 L

/

e e e O DELETED l

t.

j I

t t

I f

CRYSTAL RIVER - UNIT 3 3/4 7-46 l