y

' [

UNITED STATES

[ "' i y NUCLEAR REGULATORY COMMISSION

~,;.' '

c. p WASHINGTON, D. C. 20555 k....,e#

May 2'2, 1985 Docket t?o. 50-219 LS05-85-05-025 LICENSEES: GPU Nuclear Corporation Jersey Central Power and Light' Company FACILITY:

Oyster Creek Nuclear Generating Station

SUBJECT:

WORKING MEETING WITH GPU NUCLEAR ON OYSTER CREEK LICENSING ACTIOS'S On Tuesday, May 14, 1985, a meeting was held at NRC, Bethesda, Maryland with GPU Nuclear (the licensee) on Oyster Creek licensing actions. This meeting was held to discuss the following:

1) safeguards information, 2) hydrogen water chemistry tests to be conducted at the plant, 3) the licensee's recently preposed changes to the staff-approved remmte shutdown panel and
4) status of licensing actions for the plant. Attachment 1 is,the list of individuals that attended the meeting. The following is a summary of;the significant items discussed and the actions taken or proposed.

1.0 Safeauards Information This part of the meeting was not open to the public and a summary of the significant items discussed is. net provided pursuant to 10 CFP 73.21.

2.0 Hydrocen Water Chemistry Tests The staff stated that the licensee should review previous plant submittals (e.g., Peach Bottom, Pilgrim) on such tests.

The licensee stated that the tests will be less than one week, are expected to be in September 1985 and may not require changes to the plant Technical Specifications for thr test.

Other plants have had to change the-set point for the main steam line radiation monitors.

Tho staff stated other non-ruclear olant facilites use larce amcunts of hydrogen and have safety proceoures to use the hydrogen safely.

The staff suggested that' detailed dose measurements, of the expected higher N-16 radiation levels around the plant, should be made during the tests.

3.0 Licensee's Proposed Chances to Remote Shutdown Panel The licensee will consider the following changes to its proposal: accomplishing the trip of the feedwater pumps, main steam isolation valves and the trip of the recirculation pumps outside the control room and having the verification of these actions in the remote shutdown panel procedures.

This will be the subject of a phone call early next week.

8505290465 850522 DR ADOCK 05000219 PDR.

go l Code Cl ya

~e I 4.0 Status of Licensing Actions This is the April Progress Sumary Report for licensing actions. The status of all incompleted Oyster Creek licensing actions was discussed. The following actions were taken or proposed:

The staff, at the request of the licensee, should stop its review of the licensee's submittals on Regulatory Guide 1.97 until revision 1 is submitted by the licensee. This is expected by July 31, 1985.

Check with the lead project manager on heavy loads phase II to determine what staff review will be done on the additional evaluations to be submitted by the licensee.

The licensee will decide by May 30, 1985, if any additional submittals will be provided on administrative changes request for clarity and format and on revised acceptance criteria for combined leakage.

Set up a phone call for early next week to discuss the staff's questions on the licensee's response to IE Bulletin 82-03.

The May progress summary meeting will be held at NRC on June 12, 1985.

., Project Manager Operating Reacto Branch #5 Division of Licensing

Attachment:

List of Attendees cc:

D. Crutchfield J. Wilson R. Goel R. Minili V. Benaroya F. Witt F. Skopec DISTRIBUTION Docket File Pwolinski BGrimes NRC PDR CJamerson OELD Local PDR EJordan ACRS (10)

ORB #5 Rdg JDonohew NRC Participants DL:0RB#5 D

L DL:0R #5 CJamerson b JD hew JZwolinski 85 5 / p/85 5/d:b/85 g

i CC i

G. F. Trowbridge, Esquire Resident Inspector Shaw, Pittman, Potts and Trowbridge c/o U.S. NRC 1800 M Street, N.W.

Post Office Box 445 Washington, D.C.

20036 Forked River, New Jersey 08731 l-J.B. Libernan, Esquire Cormissioner Bishop, Liberman, Cook, et al.

New Jersey Department of Energy 1155 Avenue of the Americas 101 Commerce Street New York, New York 10036 Newark, New Jersey 0h02 Eugene Fisher, Assistant Director Regional Administrator Division.of Environmental Cuality Nuclear Regulatory Commission Department of Environmental Region I Office Protection 631 Park Avenue.

380 Scotch Road King of Prussia, Pennsylvania 19406 Trenton, New Jersey 08628 BVR Licensing Manager P. B. Fiedler GPU Nuclear Vice President & Director 100 Interpace Parkway Oyster Creek Huclear Generating Parsippany, New Jersey. 07054 Station Post Of' ice Box 388 Deputy Attorney General Forked River, New Jersey 08731 State of New Jersey Department of Law and Public Safety 36 West State Street - CN 112 Trenton, New Jersey 08625 Mayor Lacey Township 818 West Lacey Road Forked River, New Jersey 08731 U.S. Environmental Protection Agency Region II Office ATTN:

Regional Radiation Representative 26 Federal Plaza

' ew York, New York 10007 D. G. Holland Licensing Manager Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731 i

i E

~. _

6 ATTACHMENT 1

'WOPKING MEETIi!G WITH GPU NUCLEAR ON

' OYSTER CREEK LICENSING ACTIONS' MAY14,1985

- flame Oroanization M. Laggart GDU Nuclear.

B. McCutcheon GPU i!uclear R. Ewart G?t' Nuclear J. Liachenmayer GPU l'uclear J.'Knubel GPU Nuclear J. Donohew NRC/i;RR/DL R. Manili NRC P. Kapo NRC F. Witt NRC F. Skopec NRC V. Benarova NRC-R. Goel' '

NRC 4

e