ML20128E629
| ML20128E629 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 05/22/1985 |
| From: | Reinaldo Rodriguez SACRAMENTO MUNICIPAL UTILITY DISTRICT |
| To: | Thompson H Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20128E634 | List: |
| References | |
| RJR-85-251, TAC-56689, NUDOCS 8505290432 | |
| Download: ML20128E629 (1) | |
Text
,-
.6
-a suu.
SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 s street, P.o. Box 15830, Sacramento CA 95852-1830,(916) 452-3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA RJR 85-251 May 22,1985 DIRECTOR OF NUCLEAR REACTOR REGULATION ATTN:
HUGH L THOMPSON JR, DIRECTOR DIVISION OF LICENSING U S NUCLEAR REGULATORY COMMISSION WASHINGTON DC 20555 DOCKET N0. 50-312 LICENSE NO. DPR-54
SUBJECT:
ADDITIONAL INFORMATION FOR PROPOSED AMENDMENT 112, REVISION 1 By letter dated April 26, 1985, the Sacramento Municipal Utility District revised its Operating License DPR-54 by submitting Proposed Amendment 112, Revision 1.
Per the request of Syd Miner, Rancho Seco's Project Manager, the District is submitting a copy of the Spent Fuel Cooling System Operating Procedure to aid the Commission in its review process.
This Proposed Amendment 112, Revision 1 involved adding a Limiting Condi-tion for operation for the Spent Fuel Pool.
Specifically, the coolant level of the Spent Fuel Pool will be continuously monitored so that if the level falls at or below the Low-Low Level alarm of 37 feet 6 inches, and the Spent Fuel Pool cooling system becomes inoperable, one train of the Decay Heat Removal System will be put into service.
Should you require any further information or have any questions with re-gard to the Spent Fuel Pool Limiting Condition for Operation, please contact W. Colombo at Rancho Seco Nuclear Generating Station Unit No. 1.