4
~
CD&L Carolina Power & Light Company
[a UM, \\q P 2.. 0 5 P. O. Box 101, New Hill, N C 27562 May 9,1985 Dr. 3. Nelson Grace NRC-361 United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 2900)
Atlanta, Georgia 30323 CAROLINA POWER & LIGHT COMPANY-SHEARON HARRIS NUCLEAR POWER PLANT 1986 - 900,000 KW - UNIT 1 STANDBY DIESEL GENERATOR-CRANKSHAFT OIL PLUGS, ITEM 211
Dear Dr. Grace:
Attached is our final report on the subject item which was deemed reportable per the provisions of 10CFR50.55(e) and 10 CFR, Part 21, on April 12, 1985. With this report, Carolina Power & Light Company considers this matter closed.
If you have any questions regarding this matter, please do not hesitate to contact me.
Yours very truly, g
i et+
R. M. Parsons Project General Manager Completion Assurance Shearon Harris Nuclear Power Plant RMP/aj A ttachment cc:
Messrs. G. Maxwell /R. Prevatte (NRC-SHNPP)
Mr. R. C. DeYoung (NRC)
^sq')
ww I,,{h M '
/
85052g{8 0
00 e
sat XEX-SEl/1-OS5
,i i
i CAROLINA POWER AND LIGHT COMPANY SHEARON HARRE NUCLEAR POWER PLANT UNIT NO.1 FINAL REPORT
. CRANKSHAFT OIL PLUGS FOR THE IB-SB EMERGENCY STANDBY DIESEL GENERATOR ITEM 211 May 7,1985 Reportable under 10CFR50.55(e) and 10CFR21 XEX-BS7/2-OS5
w-
'o Sublect: ~
Shearon Harris Nuclear Power Plant Unit No.1 -10CFR50.55(e) and 10CFR21 reportable deficiency concerning the crankshaf t oil plugs for the IB-SB Emergency Standby Diesel Generator.
Item:
The oil plugs in the cra'nkshaf t for the IB-SB Standby Diesel Generator (S/N 74047)
Supplied By:
The crankshafts ' were supplied with the Engines by Transamerica Delaval, Inc. (TDI), Oakland, California a
Nature of Deficiency:
In a letter dated March 18, 1985, TDI informed CP&L of a potentially reportable problem with crankshaft oil plugs made of 22 gauge metal. After investigation CP&L determined that the IB-SB engine had 22 gauge plugs in the crankshaft.
Date Problem Occurred:
Refer to section above.
Date Problem
)
ReDorted:
On April 12,1985, Mr. N. 3. Chiangi (CP&L) notified the NRC (Mr. A. Hardin) that this item is reportable under the provisions of 10CFR50.55(e) and 10CFR21.
Scope of Problem:
. This' problem concerns 16 oil plugs installed on the IB-SB engine.
Reasons Deficiency Is Reportable:
The emergency diesel generators supply on-site power to essential systems in the event of a loss of off-site power.
Proper operation of the lubricating oil subsystem is essential to the operation of the diesel generator. Loss of one or more of these oil plugs could lead to loss of oil pressure and resultant unavailability of the diesel generator.
Corrective Action:
In April 1985 TDI representatives replaced the 22 gauge crankshaf t oil plugs with 16 gauge oil plugs. This work was checked by CP&L Engineering and QA personnel. The final acceptance was based upon a liquid penetrant examination of the new oil plugs performed by CP&L NDE personnel.
Final Report:
The new 16 gauge oil plugs have been installed.