MONTHYEARML20217D7031999-10-0707 October 1999 Informs That USNRC Had Dicussions with Licensee on 990908 Application for License Amend to Relocate 18-month Standby Diesel Generator Insp Sr.Forwards Preliminary Info Submitted by Licensee Re Supplement to Application ML20212L3481999-10-0101 October 1999 Forwards Document Re Replacement SG Water Level Trip Setpoint Differences to Be Placed in PDR ML20216F9021999-09-21021 September 1999 Notification of 991005-07 Meeting with STP Nuclear Operating Co in Bay City,Tx,To Review Plant Categorization & Feedback Process of Risk Ranking Components ML20211J2141999-08-27027 August 1999 Notification of 990831 Meeting with Util to Discuss Issues Associated with STPNOC Recent Request to Exclude safety- Related Low Risk Significant & non-risk Significant Components from Scope of Special Treatment Requirements ML20211G7001999-08-25025 August 1999 Forwards Examination Rept with as Given Written Exam Administered on 990706-15 for Distribution Under Rids Code IE42 ML20211G2501999-08-25025 August 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990706-15 ML20211F3801999-08-20020 August 1999 Notification of 990831 Meeting with Util in Rockville,Md to Discuss Issues Associated with STPNOC Recent Request to Exclude safety-related low-risk Significant & non-risk Significant Components, Designated Under Gqa Program ML20210P9351999-08-0909 August 1999 Notification of 990923 Meeting with Util in Arlington,Tx to Introduce New Director,Safety Quality Concerns Program & Status of Activities to Support Confirmatory Order Modifying License ML20210M6841999-08-0505 August 1999 Notification of Licensee Meeting with Util on 990914 in Arlington,Tx to Discuss New Mgt Team Introduction & Site Status ML20209D5751999-07-0909 July 1999 Notification of 990722 Meeting with Util in Rockville,Md to Discuss Licensee Proposed SG Water Level Trip Setpoint TS & Setpoint Impact on Pressurizer Water Level TS Per 10CFR50.36 ML20196L1481999-07-0707 July 1999 Forwards Info Provided by Licensee to Facilitate Conference Calls Re Licensee Desire to Propose Emergency Technical Specification Changes on Fuel Handling Building Exhaust Air Sys ML20212J2641999-06-24024 June 1999 Forwards Addl Info from Licensee Re Clarification of Sentence in Util (on Page 4 of 7) Which States That, Isolation Valves in This Sys Designed to Be Operated remote-manually from Control Room ML20195J0441999-06-14014 June 1999 Refers to Discussions with Licensee on Future Suppl to Application on Replacement Steam Generator Reactor Coolant Flow Differences ML20195J0841999-06-14014 June 1999 Forwards Info Re Suppl to Application on TS 3.6.3,action B, to Clarify Use of Check Valve with Flow Through Valve Secured as Means to Isolate Affected Containment Penetration,To Be Placed in PDR ML20207E8961999-06-0303 June 1999 Discusses Which Submitted Relief Request RR-ENG-2-8 Which Requested Relief from ASME Code Based on Provisions of Code Case N-491-2.Requests That Encl Be Placed Into PDR ML20207D9911999-05-28028 May 1999 Informs That NRC Requested That Licensees Respond to Survey on Hydrogen Storage Facilities,To Support Preliminary Evaluation to Determine If Addl Study Warranted.South Texas Project Licensee Response Encl for Placement in PDR ML20207A6671999-05-20020 May 1999 Notification of 990602 & 03 Meeting with Util in South Texas Project Nuclear Support Ctr,Southwest of Bay City,Tx,In Order for Licensee to Present low-power Shutdown Risk Model ML20207A3381999-05-19019 May 1999 Informs of Discussions with Licensee on 980831 Application for License Amend to TS 3.4.9.3 to Reflect Revised Cold Overpressure Mitigation Curve Associated with Replacement Sgs.Request That Encl Documents Be Placed in PDR ML20206N6411999-05-13013 May 1999 Refers to Discussions with Licensee on Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20206G5041999-05-0404 May 1999 Requests That Enclosures 1 & 2 Re 990412 Conference Call, Discussing Preliminary Results of SG Insp,Be Placed in PDR ML20206G2041999-05-0404 May 1999 Discusses 981201 Telcon Between NRC Staff & STP Re 10CFR50.59 Evaluation of MSLB Reanalysis & Effect on Isolation Valve Cubicle & Rcb.Requests That Encl Draft Info Be Placed in PDR ML20206A4851999-04-26026 April 1999 Informs That Staff Needs to Conduct Phone Call with Licensee on Licensee Response to GL 95-07.In Order to Conduct Phone Call,Staff Needs to Provide Licensee with Attached Info ML20205Q8251999-04-15015 April 1999 Forwards Documentation on Licensee 980928 Proposed Changes to TS on Control Room & Fuel Handling Bldg Ventilation Sys, Per 990304 Discussion with Util ML20205Q7961999-04-15015 April 1999 Forwards Documentation from Preliminary Discussions with Licensee on Proposed Changes to Atmospheric Steam Relief Valve Tss.Licensee Subsequently Made Formal Application on 990322 (Accession Number 9903300195) ML20205Q8111999-04-15015 April 1999 Forwards Draft Undated Rev 6 to Operations QA Plan Independent Technical Review, Per Discussions with Licensee on 990407 Re Proposed Change to TSs on Independent Safety Engineering Group ML20204H7731999-03-22022 March 1999 Notification of Significant Licensee Meeting with Util on 990419 in Arlington,Tx to Present Overview of Licensee Emergency Plan ML20207G8201999-03-0404 March 1999 Notification of Significant Licensee Meeting with Util on 990325 to Discuss Plant Performance Review Results ML20207K2301999-03-0404 March 1999 Notification of 990315 Meeting with STP Nuclear Operating Co in Rockville,Md So Licensee May Present risk-informed Exemptions Util Need for Implementation of Graded Quality Assurance at South Texas Project ML20199D1891999-01-11011 January 1999 Notification of 990126 Meeting with STP Nuclear Operating Co to Discuss C/As for Incomplete Control Rod Insertion Anomaly & to Discuss Need for Future mid-cycle Control Rod Drop Testing ML20198H3281998-12-15015 December 1998 Forwards Draft Info Submitted by Util Re 980728 Application for Amend Concerning Operator Action to Mitigate Sbloca,Per 981117 Telcon & for Placement in PDR ML20196G1521998-12-0303 December 1998 Forwards Draft Outline to NRC to Facilitate Discussions Between Util & NRC Re Actions Believed Needed to Address Restraints to Implementation of Graded QA ML20196F1751998-11-27027 November 1998 Notification of Licensee Meeting with Util on 981210 in Arlington,Tx to Discuss Certain Issues of Comprehensive Cultural Assessment for South Texas Project Site ML20196A8641998-11-24024 November 1998 Notification of 981208 Meeting with Util in Rockville,Md to Discuss Status of Current & Proposed Licensing Actions & Activities for Plant ML20195B9251998-11-10010 November 1998 Forwards,For Placement in Pdr,Draft Proposals That Were Provided by Licensee at Request of Staff,In Order to Assist Staff in Developing Commission Paper on Options for Making 10CFR50 More risk-informed ML20155H7471998-11-0505 November 1998 Notification of 981117 Meeting with STP Nuclear Operating Co in Arlington,Tx Re Presentation by Rosen,Manager,Risk Mgt& Industrial Relations on Licensee Perspective on Probablistic Risk Analysis ML20155C2651998-10-29029 October 1998 Forwards SG Insp Results Conducted in Oct 1998,to Be Placed in Pdr.Licensee Provided Info to Facilitate 981015 Conference Call ML20155C2231998-10-29029 October 1998 Forwards Draft Ltr from STP Nuclear Operating Co on Action Needed for Implementation of Graded QA for Plant Units 1 & 2 for Placement in PDR ML20155C2171998-10-26026 October 1998 Notification of 981109-10 Meeting with Util to Obtain Info from Licensee for NRC Proposed risk-informed Insp & Assessment Program.Agenda Encl ML20154L4101998-10-0909 October 1998 Forwards NRC Operator Licensing Exam Repts 50-498/98-301 & 50-499/98-301,including Completed Graded Tests Administered on 980602-04 ML20154L9261998-10-0909 October 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980602-04 ML20154A0331998-09-24024 September 1998 Informs That Based on Review of Licensee 10CFR50.59 Evaluation of Environ Qualification of Mechanical Components,Staff Found That Proposed Change to UFSAR to Eliminate Meq Program Would Not Alter Any Plant Sys ML20151Y7231998-09-12012 September 1998 Notification of Licensee Meeting with Util on 981013 in Arlington,Tx Re Licensee Presentation Concerning Graded Quality Assurance Program at Plant ML20239A0941998-09-0303 September 1998 Notification of 980915 Meeting W/Util in Rockville,Md to Discuss Problems W/Implementing Graded QA,10CFR50.59,impact on risk-informed Applications & Comments on NRC Proposed Rev to 10CFR50.59 ML20239A1171998-09-0202 September 1998 Notification of 980915 Meeting W/Stp Nuclear Operating Co in Rockville,Md Re Licensee Presentation of Uses of Probabilistic Safety Assessment ML20151T6061998-09-0101 September 1998 Notification of Significant Licensee Meeting W/Util on 980918 to Discuss Licensee Insp Plans for Units 1 & 2 Replacement Steam Generators ML20236X8171998-08-0303 August 1998 Notification of Licensee Meeting W/Util on 980820 in Arlington,Tx to Discuss Certain Issues Ongoing at STP Site ML20249A6781998-06-16016 June 1998 Forwards Confirmatory Order Modifying Licenses NPF-76 & NPF-80 (Effective Immediately),For Transmittal to Ofc of Fr for Publication.W/O Encl ML20216J4491998-04-16016 April 1998 Notification of 980506 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Aep & Central Southwest ML20217K9381998-04-0303 April 1998 Notification of 980413 Meeting W/Util in Rockville,Md to Discuss Licensee Desire for Update on Schedule for NRC Review of Licensee Application for Conversion to Improved Std TSs ML20197B0551998-03-0505 March 1998 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam submittal,2nd & 3rd Exam Submittal as Given Operating Exam Administered on 971020-1205 1999-09-21
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217D7031999-10-0707 October 1999 Informs That USNRC Had Dicussions with Licensee on 990908 Application for License Amend to Relocate 18-month Standby Diesel Generator Insp Sr.Forwards Preliminary Info Submitted by Licensee Re Supplement to Application ML20212L3481999-10-0101 October 1999 Forwards Document Re Replacement SG Water Level Trip Setpoint Differences to Be Placed in PDR ML20216F9021999-09-21021 September 1999 Notification of 991005-07 Meeting with STP Nuclear Operating Co in Bay City,Tx,To Review Plant Categorization & Feedback Process of Risk Ranking Components ML20211J2141999-08-27027 August 1999 Notification of 990831 Meeting with Util to Discuss Issues Associated with STPNOC Recent Request to Exclude safety- Related Low Risk Significant & non-risk Significant Components from Scope of Special Treatment Requirements ML20211G2501999-08-25025 August 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990706-15 ML20211G7001999-08-25025 August 1999 Forwards Examination Rept with as Given Written Exam Administered on 990706-15 for Distribution Under Rids Code IE42 ML20211F3801999-08-20020 August 1999 Notification of 990831 Meeting with Util in Rockville,Md to Discuss Issues Associated with STPNOC Recent Request to Exclude safety-related low-risk Significant & non-risk Significant Components, Designated Under Gqa Program ML20210P9351999-08-0909 August 1999 Notification of 990923 Meeting with Util in Arlington,Tx to Introduce New Director,Safety Quality Concerns Program & Status of Activities to Support Confirmatory Order Modifying License ML20210M6841999-08-0505 August 1999 Notification of Licensee Meeting with Util on 990914 in Arlington,Tx to Discuss New Mgt Team Introduction & Site Status ML20209D5751999-07-0909 July 1999 Notification of 990722 Meeting with Util in Rockville,Md to Discuss Licensee Proposed SG Water Level Trip Setpoint TS & Setpoint Impact on Pressurizer Water Level TS Per 10CFR50.36 ML20196L1481999-07-0707 July 1999 Forwards Info Provided by Licensee to Facilitate Conference Calls Re Licensee Desire to Propose Emergency Technical Specification Changes on Fuel Handling Building Exhaust Air Sys ML20212J2641999-06-24024 June 1999 Forwards Addl Info from Licensee Re Clarification of Sentence in Util (on Page 4 of 7) Which States That, Isolation Valves in This Sys Designed to Be Operated remote-manually from Control Room ML20195J0841999-06-14014 June 1999 Forwards Info Re Suppl to Application on TS 3.6.3,action B, to Clarify Use of Check Valve with Flow Through Valve Secured as Means to Isolate Affected Containment Penetration,To Be Placed in PDR ML20195J0441999-06-14014 June 1999 Refers to Discussions with Licensee on Future Suppl to Application on Replacement Steam Generator Reactor Coolant Flow Differences ML20207E8961999-06-0303 June 1999 Discusses Which Submitted Relief Request RR-ENG-2-8 Which Requested Relief from ASME Code Based on Provisions of Code Case N-491-2.Requests That Encl Be Placed Into PDR ML20207D9911999-05-28028 May 1999 Informs That NRC Requested That Licensees Respond to Survey on Hydrogen Storage Facilities,To Support Preliminary Evaluation to Determine If Addl Study Warranted.South Texas Project Licensee Response Encl for Placement in PDR ML20207A6671999-05-20020 May 1999 Notification of 990602 & 03 Meeting with Util in South Texas Project Nuclear Support Ctr,Southwest of Bay City,Tx,In Order for Licensee to Present low-power Shutdown Risk Model ML20207A3381999-05-19019 May 1999 Informs of Discussions with Licensee on 980831 Application for License Amend to TS 3.4.9.3 to Reflect Revised Cold Overpressure Mitigation Curve Associated with Replacement Sgs.Request That Encl Documents Be Placed in PDR ML20206N6411999-05-13013 May 1999 Refers to Discussions with Licensee on Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20206G2041999-05-0404 May 1999 Discusses 981201 Telcon Between NRC Staff & STP Re 10CFR50.59 Evaluation of MSLB Reanalysis & Effect on Isolation Valve Cubicle & Rcb.Requests That Encl Draft Info Be Placed in PDR ML20206G5041999-05-0404 May 1999 Requests That Enclosures 1 & 2 Re 990412 Conference Call, Discussing Preliminary Results of SG Insp,Be Placed in PDR ML20206A4851999-04-26026 April 1999 Informs That Staff Needs to Conduct Phone Call with Licensee on Licensee Response to GL 95-07.In Order to Conduct Phone Call,Staff Needs to Provide Licensee with Attached Info ML20205Q8251999-04-15015 April 1999 Forwards Documentation on Licensee 980928 Proposed Changes to TS on Control Room & Fuel Handling Bldg Ventilation Sys, Per 990304 Discussion with Util ML20205Q8111999-04-15015 April 1999 Forwards Draft Undated Rev 6 to Operations QA Plan Independent Technical Review, Per Discussions with Licensee on 990407 Re Proposed Change to TSs on Independent Safety Engineering Group ML20205Q7961999-04-15015 April 1999 Forwards Documentation from Preliminary Discussions with Licensee on Proposed Changes to Atmospheric Steam Relief Valve Tss.Licensee Subsequently Made Formal Application on 990322 (Accession Number 9903300195) ML20204H7731999-03-22022 March 1999 Notification of Significant Licensee Meeting with Util on 990419 in Arlington,Tx to Present Overview of Licensee Emergency Plan ML20207G8201999-03-0404 March 1999 Notification of Significant Licensee Meeting with Util on 990325 to Discuss Plant Performance Review Results ML20207K2301999-03-0404 March 1999 Notification of 990315 Meeting with STP Nuclear Operating Co in Rockville,Md So Licensee May Present risk-informed Exemptions Util Need for Implementation of Graded Quality Assurance at South Texas Project ML20199D1891999-01-11011 January 1999 Notification of 990126 Meeting with STP Nuclear Operating Co to Discuss C/As for Incomplete Control Rod Insertion Anomaly & to Discuss Need for Future mid-cycle Control Rod Drop Testing ML20198H3281998-12-15015 December 1998 Forwards Draft Info Submitted by Util Re 980728 Application for Amend Concerning Operator Action to Mitigate Sbloca,Per 981117 Telcon & for Placement in PDR ML20196G1521998-12-0303 December 1998 Forwards Draft Outline to NRC to Facilitate Discussions Between Util & NRC Re Actions Believed Needed to Address Restraints to Implementation of Graded QA ML20196F1751998-11-27027 November 1998 Notification of Licensee Meeting with Util on 981210 in Arlington,Tx to Discuss Certain Issues of Comprehensive Cultural Assessment for South Texas Project Site ML20196A8641998-11-24024 November 1998 Notification of 981208 Meeting with Util in Rockville,Md to Discuss Status of Current & Proposed Licensing Actions & Activities for Plant ML20195B9251998-11-10010 November 1998 Forwards,For Placement in Pdr,Draft Proposals That Were Provided by Licensee at Request of Staff,In Order to Assist Staff in Developing Commission Paper on Options for Making 10CFR50 More risk-informed ML20155H7471998-11-0505 November 1998 Notification of 981117 Meeting with STP Nuclear Operating Co in Arlington,Tx Re Presentation by Rosen,Manager,Risk Mgt& Industrial Relations on Licensee Perspective on Probablistic Risk Analysis ML20155C2231998-10-29029 October 1998 Forwards Draft Ltr from STP Nuclear Operating Co on Action Needed for Implementation of Graded QA for Plant Units 1 & 2 for Placement in PDR ML20155C2651998-10-29029 October 1998 Forwards SG Insp Results Conducted in Oct 1998,to Be Placed in Pdr.Licensee Provided Info to Facilitate 981015 Conference Call ML20155C2171998-10-26026 October 1998 Notification of 981109-10 Meeting with Util to Obtain Info from Licensee for NRC Proposed risk-informed Insp & Assessment Program.Agenda Encl ML20154L9261998-10-0909 October 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980602-04 ML20154L4101998-10-0909 October 1998 Forwards NRC Operator Licensing Exam Repts 50-498/98-301 & 50-499/98-301,including Completed Graded Tests Administered on 980602-04 ML20154A0331998-09-24024 September 1998 Informs That Based on Review of Licensee 10CFR50.59 Evaluation of Environ Qualification of Mechanical Components,Staff Found That Proposed Change to UFSAR to Eliminate Meq Program Would Not Alter Any Plant Sys ML20151Y7231998-09-12012 September 1998 Notification of Licensee Meeting with Util on 981013 in Arlington,Tx Re Licensee Presentation Concerning Graded Quality Assurance Program at Plant ML20239A0941998-09-0303 September 1998 Notification of 980915 Meeting W/Util in Rockville,Md to Discuss Problems W/Implementing Graded QA,10CFR50.59,impact on risk-informed Applications & Comments on NRC Proposed Rev to 10CFR50.59 ML20239A1171998-09-0202 September 1998 Notification of 980915 Meeting W/Stp Nuclear Operating Co in Rockville,Md Re Licensee Presentation of Uses of Probabilistic Safety Assessment ML20151T6061998-09-0101 September 1998 Notification of Significant Licensee Meeting W/Util on 980918 to Discuss Licensee Insp Plans for Units 1 & 2 Replacement Steam Generators ML20236X8171998-08-0303 August 1998 Notification of Licensee Meeting W/Util on 980820 in Arlington,Tx to Discuss Certain Issues Ongoing at STP Site ML20249A6781998-06-16016 June 1998 Forwards Confirmatory Order Modifying Licenses NPF-76 & NPF-80 (Effective Immediately),For Transmittal to Ofc of Fr for Publication.W/O Encl ML20216J4491998-04-16016 April 1998 Notification of 980506 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Aep & Central Southwest ML20217K9381998-04-0303 April 1998 Notification of 980413 Meeting W/Util in Rockville,Md to Discuss Licensee Desire for Update on Schedule for NRC Review of Licensee Application for Conversion to Improved Std TSs ML20197B0551998-03-0505 March 1998 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam submittal,2nd & 3rd Exam Submittal as Given Operating Exam Administered on 971020-1205 1999-09-21
[Table view] |
Text
- --
p-WW 8 IIB 5 Docket Nos.: '50-498 i
and 50-499 i
MEMORANDUM FOR: George W. Knighton, Chief Licensing Branch No. 3, DL i
FROM: N. Prasad Kadambi, Project Manager Licensing Branch No. 3 DL
SUBJECT:
NOTICE OF MEETING WITH HOUSTON LIGHTING & POWER SOUTH TEXAS PROJECT TO AUDIT DESIGN DOCUMENTATION OF MECHANICAL COMPONENTS DATE & TIME: May 17, 1985 Begin 8:00 am LOCATION: HLAP Offices 5400 Westheimer Avenue 4 Houston, Texas 77251 PURPOSE: The discussions at the meeting will be based on the review process shown in the enclosure.
PARTICIPANTS: NRC HL&P BETCHEL N. P. Kadambi M. Weisenburg, et al. D. Ashton, et al.
S. Moore, ORNL E. Rodabaugh, ORNL WESTINGHOUSE W. Garrin et al.
N. Prasad Kadambi, Project Manager Licensing Branch No. 3, DL
Enclosure:
As stated cc: See next page NOTE: NRC Meetings are open to interested members of the public to attend as observers. Those who wish to attend must contact P. Kadambi, (301-492-7272) before May 14, 1985.
M$ ye
! I W3 DG 3 N ambi/es GWK ghton 5/ /85 5/ 85
,2. .
5 South Texas
. Mr. J. H. Goldberg William S. Jordan, III, Esq.
Group Vice President, Nuclear Harmon, Weiss & Jordan Houston Lighting and Power Company 2001 S Street, N.W.
P. O. Box 1700 Suite 430 Houston, Texas 77001 Washington, D. C. 20009 Brian Berwick, Esq.
Mr. J. T. Westermeir Assistant Attorney General Manager, South Texas Project Environmental Protection Division
! Houston Lighting and Power Company P. O. Box 12548 P. O. Box 1700 Capitol Station Houston, Texas 77001 Austin, Texas 78711 Mr. E. R. Brooks Mr. Claude E. Johnson, Resident Mr. R. L. Range Inspector / South Texas Project Central Power and Light Company c/o U. S. NRC P. O. Box 2121 P. O. Box 910 Corpus Christi, Texas 78403 Eay City, Texas 77414 Mr. H. L. Peterson Mr. Jonathan Davis Mr. G. Pokorny Assistant City Attorney City of Austin City of Austin P. O. Box 1088 P. O. Box 1088 Austin, Texas 78767 Austin, Texas 78767 Mr. J. B. Poston Mr. A. Von Rosenberg Ms. Pat Coy City Public Service Board Citizens Concerned About Nuclear P. O. Box 1771 Power San Antonio, Texas 78296 5106 Casa Oro San Antonio, Texas 78233 Jack R. Newman, Esq.
Newman & Holtzinoer, P.C. Mr. Mark R. Wisenberg 1615 L Street, NW Manager, Nuclear Licensing Washington, DC 20036 Houston Lighting and Power Company P. O. Box 1700 Melbert Schwartz,Jr., Esq. Houston, Texas 77001 Baker & Botts One Shell Plaza Mr. Charles Halligan Houston, Texas 77002 Mr. Burton L. Lex Bechtel Corporation Mrs. Peggy Buchorn P. O. Box 2166 Executive Ofrector Houston, Texas 77001 Citizens for Equitable Utilities, Inc.
Route 1, Box 1684 Brazoria Texas 77422 e
y-rs' 4 i
-2
, Regional Administrator - Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011 Mr. Lanny Sinkin Citizens Concerned About Nuclear Power c/o Nuclear Information and Research
! Service 1346 Connecticut Avenue, N. W.
Fourth Floor Washington, D.,C. 20036 Mr. S. Head HL&P Representative Suite 1309 7910 Woodmont Avenue
, Bethesda, Maryland 20814
pic .. -
v Encisoure k
Design Documentation Review As part of the staff's review under the guidelines of Standard Review Plan 3.9.3, a design documentation audit will be performed for South Texas, Units 1 and 2. The purposes of the audit are:
- 1. To determine that design specifications required by the Code
(or will be) prepared and contain a complete basis for the construction of the components.
2.-For Code Class 1, 2 and 3 components: check that design reports as required by the Code have been (or will be) prepared, that the input data used are clearly traceable to agree with the design specification, and the analyses show compliance with Code requirements.
- 3. Check to see that specifications include appropriate provisions to assure reliable performance of components during their anticipated service, and that adequate documentation has been (or will be) received, which shows compliance with the specifications.
The first step of the audit consists of obtaining Code required design specifications and stress reports or design reports for pumps, valves, piping systems and other select components. For the South Texas audit, we wish to obtain a sampling of documents from both the NSSS and BOP portions as follows:
- 1. Pumps
- a. NSSS: primary coolant circulation pump
- b. BOP: a pump of Applicant's selection but not the auxiliary feedwater pump
- 2. Valves
- a. NSSS: a motor operated valve in NSSS scope
- b. B0P: main steam safety relief valves
- 3. Piping
- a. NSSS: primary coolant piping system
- b. BOP: a main steam lead from a steam generator to isolation valve i
- q.
. _2_
r.
- 4. Supports
- a. NSSS: supports for primary coolant circulation pump
- b. BOP: a support for main steam piping
- 5. Roto-Lok reactor vessel hea'd closure system From our past experience on other plants, an expeditious procedure appears to consist of the following:
- 1. Applicant accumulates the requested design documents for review at the one-day audit meeting.
-2. The staff reviews the documents, to the extent possible during a one-day meeting, primarily to ascertain the function, scope and completeness of the documents. The staff then requests that copies of the documents (possibly with some deletions or additions of documents) be provided for detailed review.
- 3. After receipt of the documents, a detailed review is made. Usually, this detailed review leads to some questions. A list of such questions is prepared and submitted to the Applicant for response. Generally, this review and follow-up letter entails one or two months of calendar time
- following receipt of the documents.
- 4. A second meeting with the Applicant, for detailed discussion and clarification of questions and/or responses thereto, has usually been needed in previous design document audits.
r- - -. .
p.- .s
, 'e
. itAY 8 1985 MEETING NOTICE DISTRIBUTION:
T9sirMit]Ne(s)iX50M98/4993 NRC PARTICIPANTS NRC'PDR" -
N. P. Kadambi Local PDR S. Moore, ORNL TIC E. Rodabaugh, ORNL FIS C H. L. Brammer y em . Nerses LR3 Reading H. Denton/D.' Eisenhut H. Thompson /F. Miraglia T. Novak J. Youngblood A. Schwencer E. Adensam E. Butcher D. Crutchfield C. Grimes ,
G. Holahan C. Thomas G. Lainas S. Varga D. Vassallo J. Miller J. Stolz F. Rowsome W. Johnston J. P. Knight, Acting Dir., DE R. Bernero R. Bonsak, Acting, AD/CSE, DE L. Rubenstein W.~ Houston D. Muller
, T. Speis F. Schroeder
.W. T. Russell, Acting Dir. , DHFS ACRS (16)
Attorney, OELD J. Partlow B. Grimes E. L. Jordan F. Ingram, PA Receptionist (Only if meeting is held in Bethesda)
Project Manager NPKadamb1 J. Lee bec: Applicant & Service Li.st