ML20127M628
| ML20127M628 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 06/25/1985 |
| From: | FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML20127M614 | List: |
| References | |
| NUDOCS 8507010303 | |
| Download: ML20127M628 (1) | |
Text
_
TABLE 3.6-1 (continued)
CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds)
LRV-45 iso. LR test panel from RB NA LRV-44 NA LRV-46 NA LRV-87 & 88*
iso. H recombiner ports from RB NA 2
LRV-89 & 90*
NA LRV-91 & 92*
NA LRV-93 & 94*
NA 3.
MSV-146 #
iso. misc. waste storage NA tank from RCSG-1B NA
- MSV-128 #
NA 4.
_ NGV-62 iso. NG system from steam NA generators NGV-81 #
NA NGV-82 iso. NG system from pzr.
NA 3.
SAV-24 iso. SA from RB NA SAV-23 & 122 NA 6.
SFV-18 iso SF system NA SFV-19 NA SFV-Il9 #
iso. Fuel Transfer tubes from NA F.T. Canal SFV-120 #
NA 7
WSV-1 Iso. containment monitoring NA system from RB WSV-2 NA D. PENETRATIONS REQUIRING TYPE B TESTS Blind Flange 119 iso. RB NA Blind Flange 120 NA Blind Flange 202 NA B507010303 850625 PDR ADOCK 05000302 P
PDR CRYSTAL RIVER - UNIT 3 3/4 6-21 L