ML20127M628

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Page 3/4 6-21 Re Containment Isolation Valves
ML20127M628
Person / Time
Site: Crystal River 
Issue date: 06/25/1985
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20127M614 List:
References
NUDOCS 8507010303
Download: ML20127M628 (1)


Text

_

TABLE 3.6-1 (continued)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds)

LRV-45 iso. LR test panel from RB NA LRV-44 NA LRV-46 NA LRV-87 & 88*

iso. H recombiner ports from RB NA 2

LRV-89 & 90*

NA LRV-91 & 92*

NA LRV-93 & 94*

NA 3.

MSV-146 #

iso. misc. waste storage NA tank from RCSG-1B NA

- MSV-128 #

NA 4.

_ NGV-62 iso. NG system from steam NA generators NGV-81 #

NA NGV-82 iso. NG system from pzr.

NA 3.

SAV-24 iso. SA from RB NA SAV-23 & 122 NA 6.

SFV-18 iso SF system NA SFV-19 NA SFV-Il9 #

iso. Fuel Transfer tubes from NA F.T. Canal SFV-120 #

NA 7

WSV-1 Iso. containment monitoring NA system from RB WSV-2 NA D. PENETRATIONS REQUIRING TYPE B TESTS Blind Flange 119 iso. RB NA Blind Flange 120 NA Blind Flange 202 NA B507010303 850625 PDR ADOCK 05000302 P

PDR CRYSTAL RIVER - UNIT 3 3/4 6-21 L