ML20127G953

From kanterella
Jump to navigation Jump to search
Forwards EPA 830429 Briefing Handout on U Mill Tailings Stds
ML20127G953
Person / Time
Issue date: 05/03/1985
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To: Ahearne, Gilinsky, Palladino
NRC COMMISSION (OCM)
Shared Package
ML20127A611 List:
References
FOIA-84-709 830503, NUDOCS 8506260144
Download: ML20127G953 (2)


Text

re ._. _ _

3 s - ..

  • * .ij., c I'\'*b-p'* "*N**

(s UNITED STATES I'

NUCLEAR REGULATORY COMMISSION i *f W ASHINGTON.,D. C. 20555

\,...../ -

'Y '

0FFICE OF THE SECRETARY NOTE FOR: Chairman Palladino Comissioner Gilinsky Commissioner Ahearne Commissioner Roberts

- Commissioner Asselstine FROM: Samuel J. Chilk, Secretar

SUBJECT:

HANDOUT FROM BRIEFING ON URANIUM MILL TAILINGS STANDARDS, FRIDAY, APRIL 29, 1983 The attached was distributed by EPA at the Briefing on' Uranium Mill Tailings Standards.

Attachment:

As stated cc: Commission Staff Offices EDO 9

i 6

e e

8506260144 PDR FOIA 850416 PDR

b. ,

BERICK84-709 -1

)

  • * ' ~

I -

e Attachment II l

. .t . ,

b a

+

~There are two' parts to the standards: standards for releases during

}

cperations, and standards for disposal. The proposed standards are su=marized in the following table, and also compared with the standards we hr;ve issued for inactive sites: .

i '.

Summary of Standards for Ac tive and Inactive Sites

  • Active" Mills Inactive l Sites j (proposed) (final) 6 Operational Disposal ~ Disposal Ground water Numerical RCRA Narrative RCRA Not needed--

Standards Standard guidance provided i

I 40 CFR 264.92* 40 CFR 264.111*

(augmented) and Design Requirement -

40 CFR 264.221*

'Suiface water Effluent Narrative RCRA Not needed--

!i Guidelines Standard guidance provided 40 CFR 440** 40 CFR 264.111*

  • f Air a) Nuclear Power 20 pCi/m2s . 20 pCi/m2 ,

i Operations radon emission radon emission Standards limit limit 40 CFR 190** ~

b) Radon emissions i kept as low as i

practicable **

Longevity of control Not applicable 200,-1000 years 200-1000 years Supplenenting Standards none none included I .

I o .

j e, The Act requires standar.ds consistent with RCRA regulations.

6,, Provision that alrecdy applies independently of this action.

Alternative in terms of air concentration at edge of' pile provided.

. Y e

J

....._a . _ . . . . < - . - , = - ~. *

^- ---,,-_.e -,--.y >, - - - - - - - - . - , -..-, -

- - - - - . ,, w