Text

,~ _ - - .. - - -. ~. .. . _ . __ . .

l REVISED COPY OPERATING DATA REPORT l DOCKET NO. 50-370 DATE 05-14-85 i

COatPLETED BY 3 A- no-vis TELEPHONE 704-173-7567 OPERATING STATUS 1

1. Unit Name: McGuire 2 Notes
  • Nameplate Rating
2. Reporting Period: April 1 1985-April 30. 1985 (cross Mwe) calculated as
3. Licensed Therms! Power 131Wt): 3411 1450.000 MVA x .90 power
4. Namepiste Rating (Gross SIWE): 1305 factor per Page lii,
5. Design Electrical Rating (Net SIWE): 1180 NUREG-0020.
6. Sisximum Dependable Capseity IGross 31We):
7. 31sximum Dependable Capacity (Net 31We): 11*0
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To which Restricted. If Any (Net .\lWe):
10. Resens For Restrictions.lf Any

This alonth Yr..to.Dste Cumulative i- 11. Hours in Reporting Period 719.0 2 879.0 _10 223.0

12. Number Of Houn Resetor Was Crities! 0.0 Sc5.0 6 773.1
13. Reactor Reserve Shutdown Hours --- ---
14. Hours Generator On.Line 0.0 594.9 6 686.0 5
15. Unit Resene Shutdown Hours --- --- ---
16. Gross Thermal Energy Generated (SIWH) 1 948 246 21 318 917

.17. Gross Electrical Energy Generated (3!WH) 247 '

699 628 7 537 351

' 18. Net Electrical Energy Generated (31WH) -6 627 658 081 7 215 881

19. Unit Service Factor 0.0 20.7 65.4
20. Unit Availability Factor 0.0 20.7 65.4 j
21. Unit Capacity Fsetor (Using .\lDC Net) 0.0 19.4 59.8
22. Unit Capseity Factor (Using DER Net) 0.0 19.4 59.8 4
23. Unit Forced Outage Rate 100.0 56.5 22.5
24. Shutdowns Scheduled Oser Nest 6 31onths(Type.Date. sod Durstion of Esch):

Maintenance Outage - June 28, 1985 - 2 Weeks l

25. If Shur Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Ststus IPrior to Commercial Operation):

, Forcesst Achiese.1 INITIA L CRITICALITY "

INITI.4 L ELECTRICITY Coil.\tERCIAL OPERATION 390 9 R

REVISED COPY .

Page 1 of 2 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. so-no UNIT NAME.Mecuire 2 -

DATE 06-14-85 A P ril 1985 REPORT MONTH COMPLETED BY E A. Reavis TELEPHONE 704-373-7567

%O e o o,y License y Cause & Corrective 27 "c u .5 2

  • 5e g

Action to No. Date  % %b 8 y g ,. Event y, gm, S 5E E %S$

xmo EE BE F o~ ce Report # mu vu Prevent Recurrence 1A l 85-04-01 F 66.00 A 4 EE GENERA Diesel Generator Repairs 18- 85-04-03 s 334.92 C 1 RC FUELXX End of Cycle 1 Refueling Outage 1C 85-04-17 F 48.00 A 4 IB PIPEXX Repair Reactor Vessel Level Instrumentation Line Welds ID 85-04-19 F 72.00 A l 4 CF PIPEXX Repair Welds on Residual Heat Removal l Lines due to Water Hammer

. . I 1E 85-04-22 F 36.00 A l 4 IA INSTRU Repair Incore Thermocouple l , Instrumentation Conoseals IF 85-04-24 F 12.00 A i 4 SC VALVEX Repair Containment Purge Valves Following Leak Rate Test Failures ,

IG 85-04-24 F 48.00l A 4 CJ VALVEX Repair. Seat Leak on Pressurizer Power'

Operated Relief Valve 1H 85-04-26 F 47.00 A 4 SF VALVEX Repair' Actuator on Safety Injection Isolation Valve II 85-04-28 F 24.00 A 4 CG VALVEX Repair Valves in the Chemical, Volume, f and Control System 1 2 3 4 Reason
Method: Exhibit G - Instructions S led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee - '

C-Refueling . 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain) File (NLREG-0161)

E-Operator Training 6 License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I - Same Source li-Other (Explain)

(O /*171

d REVISED COPY. .

4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0. so_ i70 UNIT NAME Mccuire 2- -

Page 2 of 2 DATE 06-14-85 REPORT MONTH April 1985 COMPLETED BY J. A. Reavis

__. .. . . ...,_j____ _ _ _ _

TELEPHONE 704-373-7567 "s.O c tj License y Cause & Corrective 3? "a v5E

  • 8 pr, Action to No. Date .  % .g g g jg, Event g H

S o- 5E- 2 a:

%E5 xeo Report # EE 83 Prevent Recurrence mo ou IJ "

85-04-29 F 24.00 A 4 CG VALVEX Repair Leak on Volume Control Tank Pressure Relief Va'. e

' 1K 85404-30 F 7.08 A 4 SF VALVEX Repair Seat Leak on Safety Injection Isolation Valve I

f f

i i

i I

s t i

_ - . . - _ _ _ _. .....__ .t 1 2 3 4 Reason: Method: Exhibit G - Instructions S led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain) File (NtREG-0161)

E-Operator Training f License Examination i

F-Adninistrat ive 5 G-Operational Error (Explain) Exhibit I - Same Source II-Other (Explain)

(Q1971

REVISED COPY DOCKET NO: 50-370 UNIT: McGuire 2 '

DATE: 06-14-85 NARRATIVE SLDtMARY Month: April 1985

?

Diesel generator repairs were completed early in the month and the end of cycle 1 refueling outage continued throughout the remainder of the month due to several-delays resulting from unexpected extra outage work.

x

+

l-i e

1-t . . ,

,