Text
_-
\\
REVISED COPY
\\
OPERATING DATA REPORT i
DOCKET NO.
50-370 DATE _ 06-14-85 COMPLETED BY J. A. Re~ avis TELEPilONE - 704-371-7567 OPERATING STATUS
- 1. Unit Name.
McGuire ?
Notes
- Nameplate Rating
- 2. Reporting Period.
March 1. I 985-Mech 31. I985
- 3. Licensed Thermal Power (31Wt): J 4II 1450.000 MVA x.90 power
- 4. Namepiste Rating (Gross 31We):
1305*
factor per Page iiI,
- 5. Design Electrical Rating (Net 31We): 1180 NUREG-0020.
- 6. Maximum Dependable Capacity (Gross 31We):
- 7. Maximum Dependable Capacity (Net 31We):
1180 S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reaso
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
1 This 3!onth Yr..to.Date Cumulative
- 11. Hours in Reporting Period 744.0
- 12. Number Of Hours Reactor Was Critical 0.0 2 160.0 o 504 n 595.0 6 733.I
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On Line 0.0 594.9 6 686 n
- 15. Unit Resme Shutdown Hours
- 16. Gross Thenna! Energy Generated (31WH) 1 o4s 746
.17. Gross Electrical Energy Generated (MWH) 204 699 381 _
91 11 g of 7 IS. Net Electrical Energy Generated (MWH)
-3 002 664 708 _ _
7 537 104 7 222 508
- 19. Unit Service Factor 0.0 27.5 70.4
- 20. Unit Availability Factor 0.0 27.5 70.4
- 21. Unit Capacity Factor (Using 3tDC Net) 0.0 26.1 64.4
- 22. Unit Capacity Factor (Using DER Net) 0.0 26,1 64.4
- 23. Unit Forced Outage Rate 100.0 39.6 24.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Eschi:
Maintenance Outage - June 28, 1985 - 2 Weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operationi:
Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (4/77)
R
REVISED COPY UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME McGuire 2 DATE 06-14-85 REPORT MONTH March 1985 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s.
O
'g j License cause & Corrective y
c32 "c
o.5 &
y Event
,&r, gm, Action to No.
Date
% h-S 3g!
5:E E
%5 EE
$3 Prevent Recurrence H
o-a:
Ieo Report #
mu oo
~. _ _ _.
1
,85-03-01 S
354.00 C
1 RC FUELXX End of Cycle 1 Refueling Outage 1A l85-03 F 390.00 A
4 EE GENERA Diesel Generator Repairs I
i
__._-_a__
1 2
3 4
Reason:
Method:
. Exhibit G - Instructions S
IM A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (MREG-0161)
E-Operator Training 6 License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source H-Other (Explain)
(4 /77)