Forwards Listed Safety Evaluations in Support of Review of Station Blackout/Electrical Safeguards Upgrade (Sbo/Esu) Design Rept,Rev 1
ML20127C000
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 01/04/1993
From: Gamberoni M
Office of Nuclear Reactor Regulation
To: Parker T
NORTHERN STATES POWER CO.
Shared Package
ML20127C001 List:
References
TAC-M80659, TAC-M80660, TAC-M84327, TAC-M84328, NUDOCS 9301130251
Download: ML20127C000 (3)


Text

.. . - - . - - - - _ _ - - . . . _ _ _ . - _ . ~ . -

-Docket Hos. 50-282 January 4, 1993 and 50-306 Mr. Thomas M. Parker, Manager Nuclear Support Services Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401

Dear Mr. Parker:

SUBJECT:

PRAIRIE ISLAND SB0/ESU PROJECTS EVALUATION (TAC NOS M80659, M80660, M84327 AND M84328)

The staff is continuing its review of your Station Blackout / Electrical Safeguards Upgrade (580/ESU) Design Report, Revision 1 dated December 23, 1991. Our evaluation of the Diesel Generator Qualification Plan was-forwarded on January 31, 1990. Our evaluation of your 10 CFR 50.63 " Blackout Rule" response was forwarded on September 18, 1990. Safety Evaluations relating to structural engineering, electrical distribution aspects, instrumentation / load sequencing, and auxiliary / support systems were forwarded on April 28, 1992.

Additional Safety Evaluations are enclosed, they are: (1) an electrical distribution supplemental safety evaluation, (2) a revision to the instrumentation / load sequencing safety evaluation, (3) a safety evaluation documenting the results of the load sequencer. audit and (4) a safety evaluation for the mechanical design aspects. If you have any questions .

concerning these reviews, please contact me at (301) 504-3024.

Sincerely, Original signed by Marsha Gamberoni, Acting Project Manager Project Directorate III-l Division of Reactor Projects III, IV, V

-0ffice of Nuclear Reactor Regulation

Enclosures:

1. Electrical Distribution SSE
2. Instrumentation / Load Sequencer Revised SE :
3. Load _ Sequencer Audit SE
4. Mechanical Engineering.SE cc w/ enclosures:

See next page 110040 SEE PREVIOUS CONCURRENCE OFFICE LA:PDIII-l* PM:PDIII-1 , D:PDIII-1 k NAME MShuttleworth MGamberonikth LMarsh DATE 12/31/92 01/G5/93 1/k/93 DOCUMENT NAME: PI80659.LTR (G DRIVE) y ,o 1 9301130251 930104 PDR ADOCK 05000292

. u .2 ~t th [k 3 P PDR \1 I 3 .

Mr. T. M. Parker Prairie Island Nuclear. Generating Northern States Power Company Plant CC:

Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbridge 1 2300 N Street, N. W.

Washington DC 20037 Mr. E. L. Watzl, Site-General Manager Prairie Island Nuclear Generating Plant Northern States Power Company Route 2 Welch, Minnesota 55089 Lisa R. Tiegel Assistant Attorney General Environmental Protection Division Suite 200 520 Lafayette Road St. Paul, Minnesota 55155 U.S. Nuclear Regulatory Commission Resident Inspector Office 1719 Wakonade Drive East Welch, Minnesota 55089 Regiona'i Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. William Hiller, Auditor Goodhue County Courthouse Red Wing, Minnesota 55066 Kris Sanda, Commissioner Director of Public Service 790 American Center Building-150 East Kellogg Boulevard St. Paul, Minnesota 55101 4

~

l DISTRIBUTION:-

2 Docket 3flE ilRC & Local PDRs PDIII-l Reading PI Plant file J. Roe T. King /J. Zwolinski,13/H/24 L. Marsh M. Shuttleworth M. Gamberoni OGC-WF P. Loeser S. Saba M. Hartzman ACRS (10)

Plant file W. Shafer, R-III cc: Plant Service list e

I' f

i a

,,y....,.. . ...- - -