Responds to NRC Request for Info on Station Blackout/ Electrical Safeguards Upgrade Project to Add Two Safeguards EDGs to Upgrade Safeguards Electrical Distribution Sys & Upgrade Cooling Water Pump 121 to Swing Safeguards Pump
ML20126G931
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 12/29/1992
From: Parker T
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-M80659, TAC-M80660, NUDOCS 9301050005
Download: ML20126G931 (2)


Text

.- -_

Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 1927 Telephone (612) 330 5500 December 29, 1992 10 CFR Part 50 Section 50.63(c)(d)

U S Nuclear Regttlatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR CENERATING PINiT Docket Nos. 50-282 License Nos. DPR 42 50 306 DPR 60 Reply to Requests for Information on the Stetion Blackout / Electrical Safeguards Upgrade Project (TAC Nos. M80659/80660)

Reference:

Letter from Thomas M Parker, Northern Ctates Power. Company. to U S Nuclear Regulatory Commission dated December 23, 1991 titled

" Design Report for the Station Blackout / Electrical-Safeguards Upgrade Project," Revision 1 On December 23, 1991, we submitted for NRC Staff review the Design Report (Reference) for our project to add two safeguards emergency diesel generators, to upgrade the safeguards electrical distribution sy. stem, and to upgrade:the

  1. 121 cooling water pump to become a swing safeguards cump.

I j; --During an Instrumentation and Control System Branch on-site audit of this l project (conducted November 16 through 20, 1992), in response to questions, we made the following commitments:

l That we would provide a copy, when complete, of the evaluations.being performed to assess the impact of the new load sequencers on the current L accident analyses.

1 i

That we would complete site electromagnetic interference testing of the:
j. load sequencer programmable logic' controllers in the 30.Hz to 10 kHz range de-ing the Integrated Safeguards Test to be performed near the end of the e ant outage. The purpose of this testing is to_ determine if the quulfication of the equipment is adequate _for the site electromagnetic environment. This data will be analyzed to ensure the load sequencers will operate effectively in the plant environment.

0400n 9301050005 921229

(

PDR

_P ADOCA 05000282 PDR , h - ):)

. - - - - - . -. - -.- . _ ~ _ .- - . . . .

  • *? ' . <

Nodhorn States Power Company ~

U-S NRC-

. December 29, 19921 Page 2 of 2

~ That we would monitor and analyze'the quality (to demonstrate adequacy) of' the. electrical supply to the _ load sequencer programmable logic. controllers :

on Unit I during- the above mentioned Integrated- Safeguards Test and during at-power conditions following the current outage. Note that this power line analysis has already been completed for Unit 2.

Please contact Jack Leveille (612-388-1121, Ext. 4662) if you have any questions related to this letter, M'

omas M Parker-Director Nuclear Licensing c: Regional Administrator - Region III, NRC Senior Resident Inspector, NRC NRR Project Manager, NRC J E SL1 berg i