Forwards Request for Util Input Re Tdi Part 21 Repts for Deficiencies in Tdi Diesel Generators Used for Onsite Emergency Power.Info Should Be Submitted on Same Date as Info Re Design Review & Quality Revalidation Implementation
ML20126K848
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/23/1985
From: Adensam E
Office of Nuclear Reactor Regulation
To: Richard J
MISSISSIPPI POWER & LIGHT CO.
References
REF-PT21-85 TAC-56456, TAC-59772, NUDOCS 8507300498
Download: ML20126K848 (3)


Text

-

July 23, 1985 Docket No. 50-416 DISTRIBUTION:

! Doi:ket Fileo NRC PDR" Local PDR PRC System Mr. Jackson B. Richard NSIC Senior Vice President, Nuclear LB #4 r/f Mississippi Power and Light Company MDuncan Post Office Box 23054 DHood l Jackson, Mississippi 39205 OELD, Attorney ACRS (16)

SUBJECT:

GRAND GULF NUCLEAR STATION UNIT 1 10 CFR 21 REPORTS JPartlow ISSUED BY TRANSAMERICA DELAVAL, INC. (TDI) REGARDING BGrimes DEFICIENCIES IN TDI DIESEL GENERATORS EJordan

Dear Mr. Richard:

The NRC staff is reviewing TDI diesel generator reliability issues for each nuclear plant using TDI diesel generators for onsite emergency power. The final safety evaluation report (SER) will be based in part on licensee's implementation of recommendations in the Design Review and Quality Revalidation (DR/QR) Report prepared by the TDI Diesel Generator Owners Group for each plant.

The SER will also be based on licensee's implementation of recommended corrective actions for those design deficiencies described in 10 CFR 21 Reports issued by Transamerica Delaval, Inc. subsequent to preparation of the DR/QR Report.

In order to complete our review for Grand Gulf Unit 1, we need the information described in the enclosure regarding 10 CFR 21 Reports issued by TDI. This information should be submitted on the same date that you submit information regarding implementation of the DR/QR Report recommendations, now scheduled for September 30, 1985. Submittal of this information was discussed in our meeting with you on May 31, 1985.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely,

/S/

l Elinor G. Adensam, Chief Licensing Branch No. 4 Division of Licensing

Enclosure:

) As stated 850730049e 850723 PDR ADOCK 05000416 i S PDR cc: See next page

% :LB#4 C:DL:LB#4 /

tA

{

/ . Kintner:cl EAdensam n /p5 ]/p/85

Mr. Jackson B. Richard Mississippi Power & Light Company Grand Gulf Nuclear Staiton cc:

Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.

Wise, Carter, Child, Steen and Caraway Attorney General P.O. Box 651 Department of Justice Jackson, Mississippi 39205 State of Louisiana Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire Bishop, Liberman, Cook, Purcell Mr. Oliver D. Kingsley, Jr.

and Reynolds Vice President, Nuclear Operations 1200 17th Street, N.W. Mississippi Power & Light Company Washington, D. C. 20036 P.O. Box 23054 Jackson, Mississippi 39205 Mr. Ralph T. Lally Manager of Quality Assurance Office of the Governor Middle South Services, Inc. State of Mississippi P.O. Box 61000 Jackson, Mississippi 39201 New Orleans, Louisiana 70161 Attorney General Mr. Larry F. Dale, Director Gartin Building Nuclear Licensing and Safety Jackson, Mississippi 39205 Mississippi Power & Light Company P.O. Box 23054 Mr. Jack McMillan, Director Jackson, Mississippi 39205 Solid Waste Mississippi State Board of Health Mr. R. W. Jackson, Project Engineer 880 Lakeland Bechtel Power Corporation Jackson, Mississippi 39206 15740 Shady Grove Road Gaithersburg, Maryland 20760 Alton B. Cobb, M.D.

State Health Officer Mr. Ross C. Butener State Board of Health Senior Resident Inspector P.O. Box 1700 U.S. Nuclear Regulatory Comission Jackson, Mississippi 39205 Route 2, Box 399 Port Gibson, Mississippi 39150 President Claiborne County Board of Supervisors Regional Administrator, Region II Port Gibson, Mississippi 39150 U.S. Nuclear Regulatory Commission, 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. J. E. Cross, General Manager Grand Gulf Nuclear Station Mississippi Power & Light Company P.O. Box 756 Port Gibson, Mississippi 39150 L

~

o ENCLOSURE REQUEST FOR INFORMATION NUCLEAR UTILITY OWNERS OF .,

TDI DIESEL GENERATORS The NRR staff plans to issue an SER for each plant with TDI EDGs to close out the TDI engine reliability issues. This final SER will be based, in part, upon the Design Review / Quality Revalidat%n (DR/QR) Report issued for each plant. However, during the preparation and subsequent submittal of the DR/QR reports a number of Part 21 notifications have been issued by TDI regarding potentially generic issues, which need to be addressed by each TDI owner utility.

To pennit the staff to complete its review and prepare the final SER for each plant, utilities are requested to identify to NRR recent Part 21 reports issued by TDI (since April 1984) which concern problems potentially applicable to their plant, but which are not addressed in the DR/QR report for their plant. For each such Part 21 report, the utility should describe the actions it has taken to assess whether these potential prqblems exist at their plants, causes of these problems, short and long term corrective actions to be taken, and implementation schedules.

With respect to recently observed problems with Clow Williams-Hagar check valves (Part 21 notifications from TDI dated March 12, March 14, April 4, and April 10, 1985), each utility is requested to address its actions relative to such valves located not just in the air start system, but also any such valves located in other EDG systems (e.g., jacket water and lube oil).

For NT0Ls, the requested information should be provided to the NRR staff prior to issuance of an operating license. For licensed plants with an interim authorization to operate with TDI EDGs until the next refueling outage, the requested information should be provided within 45 days of the date of this letter. If corrective actions have not been implemented, the justification for further delays should be provided.

Pending issuance of the final SER by the staff, the requested information should also be provided on a similar schedule for any future Part 21 notifications from TDI.