November 22, 1985 Docket No.: 50-416 Mr. Jackson B. Richard Senior Vice President, Nuclear Mississippi Power and Light Company P.O. Box 23054 Jackson, Mississippi 39205
Dear Mr. Richard:
Sub,iect: Grand Gulf Nuclear Station (GGNS) Unit 1 - Implementation of Recommendations in TDI Diesel Generator Owners Group Design Review /0uality Revalidation (DR/QR) Report for GGNS TDI Emergency Diesel Generators By letter dated October 1, 1985, Mississippi Power and Light Company sub-mitted its position regarding the implemcntation of recommended quality revalidation inspections, component modifications, and engine maintenance and surveillance procedures presented by the TDI Owners Group in the DR/QR report for the GGN5 TDI emergency diesel generators (EDGs). The licensee concludes that the DR/QR recommendations to disassemble and inspect certain components is not warranted and will not be performed. The licensee further concludes that certain of the TDI Owners Group recommendations for modifications, surveillance or maintenance should be changed or not be implemented.
The NRC staff is discussing with the.TDI Diesel Generator Owners Group (0G) the means by which members of the OG, including MP&L, can make changes to the OG recommendations in plant specific DR/QR Reports.
Until an acceptable means is developed, MP&L is required by the staff to implement the TDI Owners Group recommendations in the GGNS DR/QR Report without change. This includes the total disassembly and inspection of the engine in EDG 12. License Condition 2.C.(25).(b), requires these recomendations to be implemented prior to startup following the first refueling.
Sincerely, 8512050062 851122 PDR ADOCK 05000416 Thomas Novak, Assistant Director S
PDR for Licensing Division of Licensing l
cc: See next page l
g, g.. A n., u. k. "
Cortsgjg4 P. vr l
~
Mr. Jackson B. Richard Mississippi Power & Light Company Grand Gulf Nuclear Staiton cc:
Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.
Wise, Carter, Child, Steen and Caraway Attorney General P.O. Box 651 Department of Justice Jackson, Mississippi 39205 State of Louisiana Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire Bishop, Liberman, Cook, Purcell Mr. Oliver D. Kingsley, Jr.
and Reynolds Vice President, Nuclear Oper ations 1200 17th Street, N.W.
Mississippi Power & Light Company Washington, D. C.
20036 P.O. Box 23054 Jackson, Mississippi 39205 Mr. Ralph T. Lally Manager of Quality Assurance Office of the Governor Middle South Services, Inc.
State of Mississippi P.O. Box 61000 Jackson, Mississippi 39201 New Orleans, Louisiana 70161 Attorney General Mr. Larry F. Dale, Director Gartin Buf1 ding Nuclear Licensing and Safety Jackson, Mississippi 39205 Mississippi Power & Light Company P.O. Box 23054 Mr. Jack McMillan, Director Jackson, Mississippi 39205 Solid Waste Mississippi State Board of Health Mr. R. W. Jackson, Project Engineer 880 Lakeland i
l Bechtel Power Corporation Jackson, Mississippi 39206 15740 Shady Grove Road Gaithersburg, Maryland 20760 Alton B. Cobb, M.D.
State Health Officer Mr. Ross C. Butcher State Board of Health Senior Resident Inspector P.O. Box 1700 l
U.S. Nuclear Regulatory Consnission Jackson, Mississippi 39205 l
Route 2, Box 399 l
Port Gibson, Mississippi 39150 President Claiborne County Board of Supervisors Regional Administrator, Region II Port Gibson, tississippi 39150 U.S. Nuclear Regulatory Comission, l
101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. J. E. Cross, General Manager Grand Gulf Nuclear Station Mississippi Power & Light Company P.O. Box /56 Port Gibson, Mississippi 39150
_. - _.