Forwards Summary Rept of Preliminary PRA Evaluation of CCW Sys Following Postulated Reactor Coolant Pump Seal Cooler Failure,Per 921117 Telcon
ML20126K627
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/22/1992
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: Steven Bloom
NRC
References
LIC-92-341, NUDOCS 9301070198
Download: ML20126K627 (10)


Text

. ._ _ _ _ ._ . _ __._. _ _ _ _ _ . . _ _ _ _ . . . . _ _ . _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ .

h s wteo'b n2tel ha d Y

-e .- . -- . , .:=_.

Omaha Public Power District 444 South 16th Street Mall Omaha, Nebraska 68102 2247 402/636-2000 December 22, 1992 LIC 92-341 ,

Mr. S. D. Bloom NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop: OWFN 13-H-3 Washington, DC 20555

Reference:

Docket No. 50-285

Dear Mr. Bloom:

SUBJECT:

Potential

- Preliminary Overpressurization Probabilistic RiskofAssessment Component(PRA Cooling) Water (CCW) System Evaluation Enclosed is a summary report on the preliminary PRA evaluation concerning the potential overpressurization of the Fort Calhoun Station FCS CCW system following a postulated reactor coolant pump seal cooler tube f(ailu)re. During a telephone conference with the NRC on November 17, 1992 to discuss this preliminary PRA finding, Omaha Public Power District agreed to submit the enclosed report and drawings to summarize the discussion.

If you should have any questions, please contact me.

pincerely, l

l W. C./ ones i

Senior Vice President i

v WCJ/sel Enclosure c: LeBoeuf, Lamb, Leiby & MacRae J. L. Milhoan, NRC Regional Administrator, Region IV R. P. Mullikin, NRC Senior Resident inspector i l

l l

l 9301070198 921222 '7 s  !

DR ADOCK 05000205 U h*.) *V. >4 PDR y. I Ea opportsuty  !

L . 4 5130 Ern#cyment

ue Enclosure LIC-92-341 Page 1 E.RA_PR[LIMINARY_fYA1 MUON - PJ)T@LLAt 0VERPRE51tRUAT10N OF CCW SYSTEM in 1991, the final report was issued for Combustion Engineering Owners Group (CEOG) iask 656 which addressed NRC Information Notice (lN) 89-54, " Potential Overpressurization of the Component Cooling Water System." CEOG Task 656 evaluated a postulated reactor coolant pump RCP) seal cooler tube rupture resulting in a LOCA outside of Containment. I(n 1991, OPPD concluded that the postulated event is outside of the design basis for the fort Calhoun Station (FCS) component cooling water (CCW) system but recognized that further analysis (including a poss'.ble PRA evaluation) was necessary. The preliminary results of the PRA evaluation indicate that this event constitutes a potential vulnerability warranting additional investigation.

Ey_eM _Qescription CE0G Task 656 determined that an RCP seal cooler tube rupture event could cause reactor coolant (RC) to enter the CCW system at a rate of approximately 220 gpm.

This could lead to an overpressurization and failure of the CCW system. Reactor coolant could be spilled either into Containment or into the Auxiliary Building depending upon subsequent f ailure mechanisms. Although the CCW system is designed to accommodate and detect small amounts of reactor coolant system (RCS) leakage, a failure of this type is not part of the CCW system's design basis, if either the RCP seal cooler shell or the CCW piping (Schedule 40) located in Containment was to fail due to overpressurization, then the subsequent leakage would occur in Contair. ment. The mitigating strategy would then be similar to other accident scenarios involving a small-break LOCA with a concurrent loss of CCW. Since the RC would collect in the Containment Sump where it would be available for recirculation, the consequences would not be as severe as for a CCW _

overpressurization event where the failure occurs in the Auxiliary Building.

If the RCP seal cooler tube rupture did not cause a subsequent failure of the RCP seal cooler shell or the CCW piping located in Containment, then the RC leakage would pressurize the CCW piping leading to the Auxiliary Building. The CCW containment isolation valve could not close to isolate the leak in Containment due to the high pressure resulting from the RCS pressure boundary breach.

Ultimately, the CCW surge tank could rupture and reactor coolant would spill into the Auxiliary Building where it would be unavailable for recirculation.

Depressurization of the RCS would cause a safety injection actuation signal. The safety injection pumps initially take suction from the safety injection and refueling water tank (SIRWT) and discharge borated water into the RCS. Thermal-hydraulic analysis has determined that the contents of the SIRWT could be emptied into the Auxiliary Building in approximately 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> if no actions were taken to stop the leak and RCS cooldown and inventory control were accomplished in accordance with FCS Emergency Operating Procedures (E0Ps).

e Enclosure LIC-92-341 Page 2 Event Hiti gtign Hitigating actions would require a cooldown and depressurization of the RCS using either E0P-03 ' Loss of Coolant Accident" or E0P 20 " Functional Recovery." By operating all three charg ng pumps, RCS inventory control could be achieved within one hour of beginnin RCS depressurization. Depressurizing the RCS to 380 psia would take approximat y four hours after which a CCW containment isolation valve could be hand jacked closed in Room 13 of the Auxiliary Building.

Depressurizing the RC5 to less than 180 asia would take approximately five hours and allow closure of a CCW containment solation valve from the Control Room.

Following closure of the CCW containment isolation valve and isolation of the leak inside Containment, long term decay heat removal could be accomplished using the steam gcnerators or by initiating shutdown cooling using raw water as the cooling source. Manual operator actions in Corridor 4 of the Auxiliary Building are necessary to provide raw water backup to the shutdown cooling heat exchangers following the loss of CCW. Although RCS inventory requirements can be maintained by the charging pumps, a flooding hazard to '9 safety injection pumps could result if the leak was not isolated before tht: 'P.WT was depleted. However, flooding is not expected to significantly affect equipment performance, if the event is mitigated in a timely manner.

Control Room operating crews have been trained on this scenario using the FCS simulator. The operators are aware of the sequence of events and the general mitigation strategy. An additional access point from Room 19 to Room 18 in the Auxiliary Building has been established to improve access to the CCW isolation valve (located in Room 13).- The additional access point also provides an alternate route to Room 13 should flooding occur in the stairwell. OPPD is also considering other actions to further reduce the arobability of this event such as adding RCP seal cooler header relief valves which would permit closure of the CCW containment isolation valves without the need to cool down and depressuMze the RCS.

Conclusion The probability of occurrence of the postulated event at FCS has been substantially reduced due to the establishment of the additional access point into Room 18, completion of operator training and refinement of the PRA model.

Although several preliminary calculations or analyses associated with this event have been completed, further evaluation of the following items will be performed-within the scope of Generic letter 88-20:

1. The PRA human reliability analysis concerning the ability of the plant operators to diagnose and respond to a RCP seal cooler tube rupture.
2. T1e )robability for failure of the shell side of the RCP seal cooler or tie CCW piping located in Containment.
3. The habitability of the Auxiliarv Building (necessary for hand-jacking the CCW isolation valve closed or initiating raw water backup to the shutdown cooling heat exchanger).
4. The effects of flooding in the Auxiliary Building.

. . - . _ _ _ . - _ _ -_ . __ _. . . . _ _ .-_e._ . _ , __. . _ _ _ _ . ._ . . . . _ _ . .... .,

l

~

Enclosure ,

LIC 92-341 '

Page 3 i

Attachments:

e Figure A-2 OPPD/RCS/CCW Flow Path Schematic ,

e Drawing of Primary Coolant Pump (if-5817)

  • Haterials of Construction for Primary Coolant Pump (Drawing IF 5817) e Simplified drawings of Auxiliary Building 1

i r

l l

L

__ : 1-- _ - _ _ _-

erhem.-.---.%.- r,, ..e,-v.es1---w, 6*v----% --e,3--o+

  • L Attachment '

e Ll'C-92 -3 41 4

e4 LEAKAGE -

T2  :: No. 4 SEAL l C00 TO VCT -

7 NG -

SEAL COOLING <

HEAT EXCHANGER I :/

[j  :: No. 3 SEAL -

SEAL RINGS CCW -

IN

~

bi*

~ :f No. 2 SEAL' CCW OUT P1

[]

-=

No. 1 SEAL

) RECTRC. IMPELLER RECIRC FLOW CCW IN _

COOLING THERMAL BARRIER CCW OUT JACKET .

BEARING

\

---1MPELLER L

i i

i OPPD/RCP/CCW LOW PATH SCHEMATIC FIGURE. A 2

Attan hment uc-M - an t h'*,)h((

= ;n.;; qg,,g.-g- ,,

  • j T.J.*:/.l, '7.J:::: ;; 7;;W.' ;'; ; ;

MATERIALS OF CONSTRUCTION

.o YE u .E, NE*sN..

emo. cN..,.I$..u.d. ,.E".r ~- N

.= == cu== ..m  : ,. n u.zwr., u.

] COMBUSTIO!! ENGI!!EERIfiG OMAHA PUBLIC POWER DISTRICT FORT CALHOUN PLANT REF. DWGS: 1F-5817 and 1E-3432 CONTRACT No. 23866 PURCHASE ORDER NO. 1703370 l . BYRON JACKSON ORDER No. 671-N-0029/32 PART No. I'o. Req. NAME MATERIAL SPECIFICATION i

i 1 Pu=p Case Assembly 1-1 1 Pu=p Case AS E A-351, Gr. CF8M Ann.

l-2 1 Case Wear Ring AS W A-362, Gr. CF8 Ann.

1-3 I*

4 Soc.Ha. Cap Screw - Wear Ring AS m A-276, Type 30h Cond. A (Flash Chrome Plate *Ihread Only) 1-5 5 locating Pin - Cover to Case AS W A-276, Type 30h cond. A.

4 j 7 2 Pu=p Covar Asse=bly 7  % 2-1 1 Pu=p Cover AS m A-351, Gr. CF8M Ann.

!- m 2-1-1 1 Outer Shell - Pu=p Cover AS E A-2ho, Type 30k Cond. A 0,- Cover Sub-Co=ponents lo 2-2 1 Heat Exchanger Assembly 2-2-1 2 Manifold - L.P. Cooling Water ASTM A-2kO, Type 30h Cond. A

! 2-2-2 1 Bottom Ring AS W A-240, Type 30h cond. A i: 2-2-3 8 Bex. Head Cap Screv ASW A-276 Type 30h Cond. A 2-2 h 1 Fitting-Pu=p Cover to Ht. Exch. Coil AS m A-351, Gr. CF8 2-2-5 1 Beat Exchanger Coil i- AS W A-213 Type 30h SMIs Cond. A 2-2-6 1 Inner Shell - Heat Exchanger ASTM A-2h0, Type 304 Cond. A w 2-2-T 1 Outer Shell - Heat Exchanger AS W A-2h0, Type 30h Cond. A

'j 2 2-B 1 Fitting - Reat Exch. - Top ASTH A-351, Gr. CF8

2-2-9 1 Top Ring AS M A-2h0, Type 304 Cond. A 1 2-2-10 1 Flange - Cover Cooling Water Inlet ASTM A-182. Gr. F 30h Cond. A 4

g 2-2-11 2 Union - Et.Ex. Cooling water Inlet and Outlet ASTM A-182 GR. F 30h Cond. A 2-2-12 2 Fitting - Ht.Ex. Cooling Water Inlet and Outlet ASTM A-2h0, Type 30h Cond. A y y"M- 2-2-13 1 Flunge - Cover Cooling Water Outlet ASTM A-182. GR. F30h Cond. A 9 2 m d, . 2-2-lh 1 Temperature Sensor .- Iover Seal Cavity Commercial 1

o- a c-

!' e+ o O

%g j' *O

. A ttachmen t

.LI C 3 41 .

P. gn 1 o f 4 a m m sa. 4.sn o w.s m v..,e, 4 g'I K hj h ooo," c - uu O O $ noir de s. w . n _o ,_.. 4 __ r V

V l/g / - An. sr.= a.p T** =d Mr

.g c.. : $g '~

OD l/ O / 9 T"*

h ou I l'Jy,mo h

  1. s tery h,.n

~

E**P A'"" A Ml 2 Pseuw y, Nu w u a a .

h u,,,

""" bbbb $5 e) q' h

n-~ ~ s -

noi E. h ger ed Pwmp u., un..

Ne w

@ HP U C$

AII'3 f S v N

'~

bbbb O - ^ "" -

~

  • i'k H AuxUlary BuUding Plant Elevation 971' 0" S

3 ~

,,,,,,f g h 4.ni .3

" gl8 E

$ D',*,' L -

am $ awa.: w s-.c A,

$ g 0 N c: ys Auxdiary Building y Plant Elevation 989'.0" w

Attachment

- UC-92-34i .

Shaet 2 of n D.10ll' East Switchgeng Are, 11snery West Swischgear Age,

_g m X w ns D.1013' .= 8 ,s i cc = = Dectnc4j ?

= = QA Vauh ga r.v.-.. Diesel p;,,,; '

G i:) w g, jg7 "

Ptheradon Area kil G*nctetot 3cnersun Roorn Room

A

~J q W Piy l } Peneassion

[cNe k "' @" 4' d Equipmen:

- Halth i Encloswe :

Resena,

' *~ Sampling l

s 2rT<> ,

h A 971 1 U

.........N Concentrate 4 New Fuel l*8d Wute e s Storage Storage *

^^d Evaporator 23 .

Urdoad Room Tard.s Q- G 3

1 , Of,3 a, , e <g, Auxiliary Building Plant Elevation 1007'-0",101l'-0", & 1013'-0" f , ..---_.-__...-.,-,.4 - - - . . . . . u - .- ,, e . _ . . -.y.4- . , _ , . ,

.v A t ta hcmen t LI C 341

- Pago 3 of 4 *

/

Cable Upper 5witchgcar Arca Room h h Uppui5cculca)"}

=J Pencradon Area N dy i M Upper DicJe!

Up;c Diesel.

] Work Arca Generator Generator Room Room 1 Upper Venulation AC2 Enclosure

( }CCWSurge Tank CCW uppu U U U F-p, Equipment AC AC AC Reactor Hatch 3C 3D 3A Enclosure Ven:Ustion Equipment Asca rtood Point E 3' E_

A 971 1 h

'o wy ,, N< > s-4C Hold Up h u s j re

/

a w"""" "ui Preiuy Spen Fuel St rage New Fuel Road W

-4 B Storage load d Water And I ow.43 Fuel

-4 A l Transfer Carul 1

Auxiliary Building Plant Elevation 1025'-0" 1

1

A ttachmen t LIC 92-341 .

. Page 4 of 4

_J -

Control Room AC Il ( RW.1

)( FW 19

)

Mechanical Equipment

$ conaeru.i. scrvic4 water nna And Piping Area Room h 2 -

h Computer , ,

l Room Comdor R

Roof Reactor Upper Part of Ventilation Equipment Arca E

% *J L

.,,,i,,1 - N< >S o,...,,....,i New Fuct II spent fuel siense siente w v .

! 7ppecentiminadon cut L ,

Auxiliary Building Plant Elevation 1036'.0" s

= _ _

i 1

_ _ _ _ _ , , _ _ . . _ . -