Requests Full Size Drawings for May 1986 Regulatory Effectiveness Review of Vital Areas.List of Requested Drawings Encl
ML20126J515
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/04/1985
From: Hunter D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 8506100620
Download: ML20126J515 (4)


Text

(

s D

~

Docket: 50-285

.0maha Public Power District ATTN:

R. L. Andrews, Division Manager-Nuclear Production 1623 Harney Street Omaha, Nebraska 68102 Gentlemen:

The Office of-Nuclear Materials Safety and Safeguards (NMSS), Division of Safeguards has selected Fort Calhoun Nuclear Station for a Regulatory Effectiveness Review (RER). This onsite review is scheduled for May 1986.

The.NMSS team requests that they be supplied with the drawings which are listed on the enclosure to this letter. They would like full size drawings sent to:

Robert F. Burnett, Director Division of Safeguards, NMSS U. S. Nuclear Regulatory Commission Washington, D.C.

20555 If you have any questions, please contact James Kelly at 817/860-8130.

Sincerely,

.i'Qtsinal S@ led by:"

D. R. Hunter, Chief Reactor Project Branch 2

Enclosure:

As stated cc w/o enclosure:

-W. G. Gates, Manager Fort Calhoun Station P. O. Box 399 Fort Calhoun, Nebraska 68023 Harry H. Voigt, Esq.

'LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, DC 20036 Kansas Radiation Control Program Director Nebraska Radiation Control Program Director RL IV:PSS AC:NMS&SB D:D C:PSB g' C:RP AI 85-272

'l jg)

Kelly /nh RJEverett RLBp t DMHunfrfcutt DRHun er ef/85 f/3f/85 p$/j{/85 g /3 /85 fo/4/85 h

ANk lM5 F

pg

g, s

' i-Omaha Public Power. District.,

K bc'c'to DMB'(IE31)

Lbcc.distrib..by RIV:

RPB2 Resident Inspector R. D. Martin, RA Section Chief RIV File

.R. Denise, DRSP LR. F. Burnett, NMSS J. Kelly E.- Ten Eyck, NMSS.

R. L. Bangart

- Docket File NMS&SB t

i L

V

~

ECL'S;i FORT CALHOUN DRAWING LIST FOR VITAL AREA ANALYSIS 1.

Equipment Layout Drawings 11405-A-1; General Arrangement Plan-Basement Floor 11405-A-2 General Arrangement Plan-Intermediate Floor 11405-A-3 General Arrangement Plan-Operating Floor-11405-A-5 Primary Plant Basement Floor Plan 11405-A-6 Primary Plant Ground Floor Plan 11405-A-7 Primary Plant Intermediate & Operating Floor Plan 11405-A-8 Primary Plant Operating Floor Plan 11405-A-278 Intake Structure Floor Plan 11405-S-400 Site Plan - General Building 2.

Piping and Instrument Diagrams 11405-M-1 Containment Htg, Cooling, Ventilating Flow Diagram 11405-M-10 Aux. Coolant, Component Cooling 114005-M-40 Aux. Coolant Component Cooling System Flow Diagram 11405-M-100 Raw Water Flow Diagram 11405-M-252 Steam Flow Diagram 11405-M-253 Steam Gen. Feedwater & Blowdown Flow Diagram 11405-M-254 Condensate Flow Diagram E-23866-210-110 (CE)

Reactor Coolant System E-23866-210-120 Sh. 1 (CE)

Chemical & Volume Control E-23866-210-120 Sh. 2 (CE)

Chemical & Volume Control E-23866-210-130 Sh 1 (CE)

Safety Injection & Containment Spray E-23866-210-130 Sh 2 (CE)

Safety Injection & Containment Spray n

_p.

3.

Electrical One Line Diagrams 8.1-1 Simplified One-Line Diagram Plan Electrical System 4.

Miscellaneous Drawings 1140E-Mech. 1 Symbol List 11405-Mech-2 Mechanical Symbols and Notes