Log # TXX-92588
=
2M File # 909.5A
~
10010 c1o E
E Ref. # NUREG 1216
.1UELECTRIC December 18, 1992 William J. Cahill, Jr.
Group ner hesident U. S. ?'uclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N05. 50-445 AND 50-446 STATUS OF THE CPSES DIESEL GENERATOR ACTION ITEMS (DR/0R PHASE II)
REF:
- 1) TU Electric letter TXX-91336 dated December 19, 1991 from Mr. William J. Cahill, Jr. to the U. S..NRC
- 2) TV Electric letter TXX-92299 dated, July 1,1992 f rom Mr. William J. Cahill, Jr. to the U. S. NRC Gentlemen:
TV Electric evaluated the recommendations of the Generic Safety Evaluation Report for Transamerica Delaval, Inc. Diesel Generators, HUREG-1216 and provided the response for the Design Review /0uality Revalidation (DR/OR)
Phase 11 program for CPSES Unit 2 in TXX-91336, dated December 19, 1991 (See Reference 1) and TXX 92299, dated July 1,1992 (See Reference 2).
The NRC staff completed their review of OR/0R Phase 11-for CPSES Units 1 & 2 during their site visits in October and November 1992.
The purpose of this letter is to provide the status of the open action items for the DR/0R Phase'll activities for CPSES. Unit 1 and 2 (See Attachments 1 and 2) at the conclusion of these site visits.
All the open action items for the Phase 11 DR/0R activities as described in Attachments 1 and 2 will be completed before the end of the first refueling outage of CPSES Unit 2.
2300D 4
9212240037 921218~
DR ADOCK 05000445
<o s. ouve streci La. o canas.Teus mot I
.p PDR
~.- -.-.
'TXX 92588 rage'2 of 2'
'l any questions or comments, please call Mr. Manu Patel at If~you hat-'
(214) 812-8298.
Sincerely, William J. Cahill, Jr.
By:
J. S. Marshall Generic Licensing Manager MCP/d, IT Attachments c - Mr. J.
- m. Mllboan, Region IV i
Resident Inspectors, CPSES (2)
Mr. T. A. Bergman, NRR Hr. B. E. Holian, NRR l
l
~
l a,
i-
. to TXX-92588 Page 1 of 2 STATUS OF OPEN ITEMS - UNIT 1 PHASE 11 DR/OR Component Title Action / Comments Train 02-375 Air intake manifold Verify 'J-Bolt nuts on supports Both IM-PSR-10100 and 10101, install if required.
(WO: 1-92-026738-00 TR
'B' and WO: 1-92-027686-00 TR
'A').
02-465A Lube oil line: -
Ensure minimum installatio.: gap Both external - tubing, of.171 between pipe ends on 12 fittings, couplings inch dresser coupling.
(WO: 3-92-307201-01, WO: 3-92-307202 01).
Revise REl-503 to include maintaining t;' proper gap on reassembly.
02-467B Turbocharger lube oil Verify torque on 5/8" bolt fittings - supports attaching tubing support (LO-PSA-T10200) to turbocharger support is 100 ft.-lb.
(WO: 1-92-026735-00 for TR
- B', WO: 1-92-027396-00 for TR
'A').
Revise REl-5C3 to include periodic checking of bolt torque.
02-540C Lube cil sump tank -
Verify proper bolt torque.
Both mounting hardsare.
(WO: 1-92-026735-0 TR
'B',
WO: 1-92-027396-00 for TR 'A*).
02-717F Auxiliary sub-base Torque flange bolt for supports Both and oil and water LO-PSA-10204 and 10205 IAW TDI piping - lube oil -
Appendix IV.
pipe and fittings.
(WO: 1-92-026735-00
'B',
WO: 1-92-027686-00 TR
'A*).
02-450B Fael oil headers -
Install U-bolts on supports fuel oil tubing F0-PSR-10597 and 10598.
supports.
(WO: 1-90-027686-00).
l l
1
' to'TXX-92588-Page 2_of 2 STATUS OF OPEN ITEMS - UNIT 1: PHASE'Il DR/0R Component Title
. Action / Comments; Train 1
02-455C Fuel' oil filter and Verify mounting. hardware is in.
-B strainer - mounting accordance with the issued as-hardware.
built. isometric drowing.
(TE 92-2305).
STATUS: ACTION COMPLETED BY'TUE 02 717M Auxiliary sub-base Verify U-bolt' is installed on
.Both and oil and water support;F0-PSSR-10765.
piping - fuel oil -
-(WO:-1-92-026738-00 for TR 'B' supports.
-WO: 1-92-027686-00 for TR
'A').
02-441C Starting air manifold Provide two-way-lateral support A
- supports, on supports SA-PSR-T10050, T10051. T10086, T10088 and
.T10089. (WO: 1-92-027686 00).
Verify / install spacers son -
Both-supports SA-PSR-T10055, T10052,
.T10053, T10091, and T10092.-(WO:
1-92-026738-00 for TR
- B ',. WO: ' l.
92-027686-00 for. TR
'B').
u
~
l'
'i
,u..
m.
,A__
9
. to TXX-92588 Page 1 of 2 STATUS OF OPEN ITEMS - UNIT 2 PHASE 11 DR/0R Component Title Action / Comments Train 02-436B Intercooler piping -
Complete TE92-1806 to evaluate Both gaskets, bolting.
the type of dresser couplings installed.
STATUS: ACTION COMPLEiED BY TUE 02-355A Idler gear assembly -
Complete WO #1-92-017977-00 and Both crank to pump gear.
1-92-017978-00 to visually inspect crank to pump gear set teeth efter 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> or preoperational testing.
02-355B Idler gear assembly.
Complete W0 #1-92-017977-00 and Both 1-92-017978-00 to visually inspect gear teeth after 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> or preoperational testing.
02-411A Govern drive -
Documentation from the Owners Both governor and Group will be required to justify tachometer drive gear not completely disassembling the and shaft.
drive gear assembly.
Documentation was previously obtained for this for component 02-410B.
02-413A Governor linkage Complete W0 #1-92-017336-00 to A
install pins and reassemble with loctite.
02-415B Governor assembly -
Complete TE 92-1806 to evaluate Both booster servomotor.
booster line size and orientation.
STATUS:
ACTION COMPLETED BY TUE 02-688A Engine and auxiliary Complete TUE 92-6447 to close Both module wiring open hardware items.
material conduit STATUS:
ACTIOW COMPLETED BY TUE and fittings.
02-695B Engine shutdown Revise REl-503 to add other Both equipment - valves, valves in addition to pressure regulator, orafices, regulator.
... ~
j,
.s-a
- n..
. Attachment 2 to TXX-92588 Page 2.of'.2 STATUS-OF-OPEN ITEMS - UNIT:2 PHASE 11 DR/0R-Component-Ti tl e':
- Action / Comments-Train.
00-442A
- Starting air-Complete WO- #1k92-017083-00: to -
- A distributor -
visually inspect the poppets-distributor astembly.
after.100. hours'or preoperational testing.