CATAWBA NUCLEAR STATION MONTHLY OPERATING STATUS REPORT October 1992 1.
Personnel Exposure -
For the month of October, no individual (s) exceeded 10 percent of their allowable annual radiation dose-limit.
2.
The total station liquid release for December has been compared with the Technical Specifications maximum annual-dose commitment and was less than 10 percent of this limit.
The total station gaseous release for December has been compared with the Technical Specifications maximum annual.
dose commitment and was ?oss than 10 percent of this list.
l 1.
l l
3'-
DO O
R
d 0FEFAllNG LATA FEFDP1
- REVISION 1 00CIEI NO
$0-413 LATE Nneeter 13_jl9L pff g M STATUS C0rPLETEDliY R. A. W 111!1L.
.1 TELEFHONE 7M-3B?-5346
!. Urit Naeet Catente 1
- 2. Fepor tit.g Feriod: Otttter 1, 1992-Octoter 31,1992
- 3. Licensed thereal forer (Nt):
3411
- 4. Nastplate Fating (Gross Ne):
1305*
W tes
- N ueplate Fating
- 5. hsign Electrical Fating (het he):
1145 (Gross We) calculated as
- 6. Marisas bretidable Capacity (Gross Ne):
119?
1450.000 tilA x.90 peer
- 7. Marious Dependable Capacity (Net Ne):
1129 f atter per Fage iin B. If Changes Ottur in Capatity Fatings (Ittes Nester 3 itlreugh 7) Sitte Last HUFE6-0020.
Fe;or t. Bise Feasm:
- 9. Foner Level le WMth Festricted, if Any (Net Ne):
- 10. Femn Ftr Festrictior:s, if any:
Ibis P,onth it.-to-late Caulative
- 11. Hours In Feperting Feritd 745.0 73?0.0 64369.0
- 12. Naber Of Heurs f ractor Was Critical 327.3 493?.4 473?2.6
- 13. Reatter Reserve Shutdown H art
--0--
-+-
--0"
- 14. Hours Benerator On-tire 270.4 4G74.9 46270.0
- 15. Unit Reserse Stutdann Hurs
--0--
- 16. Gross Iber eal Energy Generated (MW) 771636 16109778 149596093
- 17. Gress Electrical Erergy Bererated (Me )
264076 5697715
!?$67119
- 19. Net Electrical Er.ergy Eenerated (M) 23530B
$363164 49h6S5B
- 19. Untt Ser<tce fatter 36.3 66.6
?!.9
- 20. Unit Availability fatter 36.3 66.6 71.9
- 21. Unit Capacity f atter (Usirq PDC het t 22.0 14.9 67.5
- 22. Unit b patity fatter (Usteg DER Net) 27.6 64.0 65.9
- 23. Unit forced Outage Fate 63.6 10.3
!!.4 M. Shutdtun Scheduled Over keit 6 M:nths (ine, late, and bratitn of Each):
- 25. If Shut hun At End Of Fercit Perica. Estiaated Date of Startup
- 26. Units In Test Status (Frier to C m ercial Operationit forecnt Achieved INiil AL 0FITICALITV INITIAL ELECTRICITY COVERCI AL CFEF ATION I
1
K UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-413 Revision 1 UNIT NAME CA1AwdA 1 DATE 11/1d/ v2 REPORT MONTH October 1992 COMPLETED BY N.
C.
51MMUN5 Page lof 2 TELEPHONE
(/v4)-Juz-dzda (1) 2)
(4)
(5)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 3
92 1 F
105.52 A
1 CA XXXXXX REACTOR COOLANT SYSTEM LEAKAGE AT CONO SEAL AT REACTOR VESSEL HFAD 4 10- 5 F
365.98 A
1 CH HTEXCH 15 DAY EXTENSION DUE TO STEAM GENERATOR TUBE LEAK 4-P 92-10-20 S
B HA TURBIN HOLD FOR TURBINE OVERSPEED TRIP j
TEST 5
92-10-21 S
3.10 B
1 HA TURBIN TURBINE OVERSPEED TRIP TEST F
5-P 92-10-21 F
A CH
.HTEXCH STEAM GENERATOR
'1C' LEAKAGE STABILITY PER CHEMISTRY 6-P 92-10-21 S
B ZZ XXXXXX FLUX MAPPING 4
f (1)
(2)
(3)
(4)
F Forced Reason
- Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee C-Refueling-3-Automatic Scram Event Report (LER 4-Other (Explain)
File (NUREG-Ol61))
D-Regulatory Restriction E-Operator Training & License Examination i
i F-Administrative (5)
G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain) 4
,n, a,,.