Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6551998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20195E5611998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6661998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for Catawba Nuclear Station,Unit 2 ML20153B2921998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Catawba Nuclear Station,Units 1 & 2 ML20153B3071998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8071998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2551998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236F0321998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8091998-05-31031 May 1998 Revised MOR for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247K4451998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for Catawba Nuclear Station ML20247M0251998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247M0361998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20217B2271998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216E2371998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station ML20217B2341998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station,Units 1 & 2 ML20202G8641998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F4301998-01-31031 January 1998 Revised Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station ML20198P3261997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20202G8911997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20198P3431997-11-30030 November 1997 Revised MOR for Nov 1997 for Catawba Nuclear Station,Unit 1 ML20203H5721997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Catawba Nuclear Station,Units 1 & 2 ML20199C7271997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Catawba Nuclear Station ML20203H5801997-10-31031 October 1997 Revised Monthly Operating Repts for Catawba Nuclear Station, Units 1 & 2,for Oct 1997 ML20211P9771997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Catawba Nuclear Station ML20216K1511997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CNS ML20210L0411997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CNS ML20216K1611997-07-31031 July 1997 Revised MORs for July 1997 for CNS ML20141H2221997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Catawba Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20203A2581999-02-0505 February 1999 Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199K8711999-01-13013 January 1999 Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20205E9441998-12-31031 December 1998 1998 10CFR50.59 Rept for Catawba Nuclear Station,Units 1 & 2, Containing Brief Description of Changes,Tests & Experiments,Including Summary of Ses.With ML20206P2081998-12-31031 December 1998 Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor ML20203A4101998-12-22022 December 1998 Rev 16 to CNEI-0400-25, Catawba Unit 2 Cycle 10 Colr ML20203A4041998-12-22022 December 1998 Rev 14 to CNEI-0400-24, Catawba Unit 1 Cycle 11 Colr ML20198B1341998-12-14014 December 1998 Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected Areas ML20196J8351998-12-0808 December 1998 Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20196C0251998-11-27027 November 1998 SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station ML20196A6881998-11-25025 November 1998 Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three Welds ML20196D4041998-11-19019 November 1998 Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154M7661998-10-12012 October 1998 LER 98-S01-00:on 980913,terminated Vendor Employee Entered Protected Area.Caused by Computer Interface Malfunction. Security Retained Vendor Employee Badge to Prevent Further Access & Computer Malfunction Was Repaired.With 1999-09-07
[Table view] |
Text
_ _ _ - - - - - _ _ - - _ _ - _ . - _ _ _ _ _ - .___ _ -- . _ _ _
i
(
OMFAi!NS DATA REFORT i
DOCLET ND 50-413 SAIE Derester !$.1992 OPEFATINGSTATUS C0F,PLETED kV R.A. Willi n s TELEPHCHE 704 3B2-5346 _,
- 1. Unit N#ses Catawba !
- 2. Peporting Feriod Non ster 1, 1992-November 30,1992
- 3. Licensed thereal Power (MWt): 3411
- 4. Eneplate Ratirg (Gross Ne): 1305* Notes INastplate Rating
- 5. Design Electrital Fating (Net MWe): 1845 (6 toss MWe) calculated as ,
- 6. Manleva Dependable Capacity (Gross MWe): 1192 1450.000 MVA .90 pt,er
- 7. Maxisaa Dependable Capacity (Net MWe): 1129 factor per Page lit,
- 9. If Changes Occur in Capacity Ratings (itees Number 3 Through 7) Since last NUREB-0020.
Report. Give Peascos .;
- 9. Foner Le rt to Which Restricted, If Any (Net MWe):
- 10. Peason foi 'rstrictions, if any:
This Month Yr.to-Date Cuaulative it. Hours In Reporting Feriod 720.0 B040.0 65089.0
- 12. Nusber Of Hours Reactar Was Critical 720.0 5652.4 49042.6
- 13. Keactor Reserve Shutdown Hours --0-- -_ -
- 14. Hours Generator On Lioe 720.0 5594.9 46990.8
- 15. Unit Feserve Shutdown Hours --0-+ - --0--
16.SrcssThern!EnergyGenerated('iH) 2425694- 19535472 !$2021777 ;
- 17. Gross Electrical Energy Generate: (MWH1 857347 6555062 53424466
- 19. ket Electrical Energy Benerated ( liH) 812674 6175039 50109532 l 19. Unit Serytte factor 100.0 69.6 72.2 20.. Unit Availability Factor 100.0 69.6- 72.2 -
- 21. Unit C#,aacity facter (Using MDC h t) 100.0 68.0 67.9
- 22. Unit Capacity Factor (Using DER : t) 98.6 67.1- 67.2 23.UnitforcedOutageRate 0.0 9.1 11.2 ;
- 24. Shutdown Scheduled Over Next 6 Anths (Type, Date, and Duration of Each):
.Rone ll 25. If Shut Denn At End Of Repet t Period. Estimated Date of Startup:
26, Units in Test Status (Frior to Commercial Operation): Forecast Achieved.
INITIAL CRITICAllif
( INiilALELECTRICliY COMERCIAL OPERAll0N L 9212210065 921215 PDR ADOCK 05000413
.R .PDR
__ _ __ . . - _ _ . _ , . _ _ _ . . _ _ _ _ . _ ~ . - . _ . , _ _ .- - - -
. . _.__m . ~. _.. _ . _ . _ _ . . _ . ~ . . - - . _ _ _ . - . _ _ . . . _ . - ~ _ . _ . - . . ~ . _ _ . . _ . . .
d OPERAi!NG LATA FEPORT ,
DOCLET N0 50-413 Ukli Catsuta 1 DATE Peteeter 15. 1992.
COMPLETED BY R.A. Williset TELEPHONE 704 392-5346 i i
S MONTH __Nove#ber.1992 QA1 AVERABE DAILY POWER LEVil M AVERAGE DAILY POWER LEVEL (MWe NetI (MWe-Net) 1 1091 17 1154 2 1006 10 1154 3 10?2 19 1152 4 Lee 9 20 1153 5 1089 21 1127 6 1090 22 1143 r i 7 1099 23 1150 8 109'l 24 1146 9 __,
1099 25 'lj46 -
7 5
10 !!00 26 1144 11 : 1117 27 _
1148 12 - !!!5 PS 1149
_13 - 1155 29' !!47
- 14 1159 30 1152_
15 '!!57 +
- w.
16 1156 I
3
-* w uap- w--.w*wv7 _w-=O-w=ew wv omwu=w wt's- er -
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-413 UNIT NAME CArAwuA 1 .
DATE 12/1>/ 9 2 REPORT MONTH November 1992- COMPLETED BY n. c. sinndNs TELEPHONE (iv41-JUZ-bibJ (1) 2) g_ (4) (5) .
E HOD T A OF LICENSE M. Y ,
S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S a
i s
1 j
f h
i (1)- (2) . (3) (4)
F Forced Reason- Method: Exhibit G - Instructions S Scheduled. A-Equipment Failure (Explain) 1-Manual for Preparation of, Data l B-Maintenance or test 2-Manual Scram Ent U Sneets For Licensee i C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restriction ,
E-Operator Training & License Examination
, 4-Other (Explain) File (NUREG-0161)) ,
F-Administrative (5)
.G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain) i
-.. ~ . . . , - . . 3...
._ . . . _ . - . - - . . ... .~ . .~..-. - .~... . . - . . ~ - . .... ~ - . . . . - . - - . . . . - .
4 4 e
i DOCKET NO: 50 413 UNIT: Catawba 1 DATE: 12/15/92 ;
NARRATIVE
SUMMARY
MONTil: November 1992 Catawba Unit 1 began the month of November operating at 100% full power.
The unit operated at or near 100% for the entire month, 6
L 1
Prepared by: N. C. Simmons i Tolophone: 704-382-5263
, . L e.: - -
, - . , , . . n :- . . ,~a,,
,,, . - , s , . , , . . . , + - ,
, - - , , - .,n,,.,, , , , , .
l ILOILTilLY REFUELIliG INFORMATION REQUEST
- 1. Facility name: Catawba. Unit 1
- 2. Scheduled next refueling shutdown: October 1993
- 3. Scheduled restart following refueling: January 1994 Tile PROJECT MAllAGER 11AS BEEN ADVISED BY SEPARATE COMMU!i1 CATION OF ANY T.S. CilANGE OR LICEllSE AMENDMENT. TilEREFORE , QUESTIONS 4 TilROUGil 6 WILL NO LONGER BE MAINTAINED IN TilIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? -
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information. ,
6 Important licensing considerations (now or ditferent design or supplier, unroviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in'the core: 121 (b) in the spent fuel pool: 103,
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase -
- 9. Projected date of last -refueling which can be accommodated by-present licensed capacity: September 2009 DUKE POWER COMPANY DATE: December 15, 1992 Name of
Contact:
R. A. Williams Phone: 704-382-5346
I 0FEFAlik5 DATA LEF001 00D EI N3 50-614 I ATE I,.nteter 15. 1992 nr[FA11N;Staig COnPLETED 1Y P. A. WQpL TELEPHONE 704-3B2-5346
- 1. Unit Naae: Cataata 2
- 2. Reperting f erttd: Noitster 1,1972-Wcreater 30, 1972
- 3. Cicensed ibereal Ptver int): 3411
- 4. Naseplate Fating (Orcss Ne): 13058 N0tes 4Wateplate Fating
- 5. Design Elettrical Rating (het feeli 1145 (6 toss NWel calculated as ~
- 6. Marious Dependable Captity (6*tss FWe): 1192 1450.000 MVA .90 p eer
- 7. Mariave pepertable Captity (Net Nel: 1129 factor p r Fage lii, B. If Changes 0 tur in Capacity Fatings (!!eas NusDer 3 Thrtugn 7) Since last NUFE6-0020.
Fevert. Give Feascns: _
- 9. Fener Level 10 Which Festricted, if Any (het Ne): _
- 10. Feascn for Festrictitns, if anyt this Month Yr.-to-Date Cusalative
- 11. Hcurs in Feprting Ferted 720.0 8040.0 55105.0
- 12. Natt'er Of Hours Feactor Was Critical 392.9 7690.3 41987.9
- 13. Rea:ter Feserve Shutdenn Hours --0-- --0-- --0--
- 14. Hears Generater On-Line 367.6 7634.5 41197.7 _
- 15. Unit Feserve Shutdann Hours --0-- --0-- --0--
- 16. Gross Thereal Energy 49erated (FWK) 1214966 254630S1 130589258
- 17. Gross Electrical Energy hnerated (N4) 433310 9038513 4621441B
- 18. Net Electrical Energy Generated (NH) 403704 E569217 43423096
- 19. Unit Service fatter 51.1 95.0 74.0
- 20. Unit Availability factor 51.1 95.0 74.8
- 21. Unit Captity Fatter (Using MLC Net) 49.7 94.4 69.6
- 22. Unit Captity Fatter (Using DER Wet) 49.0 93.1 68.B
- 23. Unit forced Detage Rate 0.0 0.5 11.0
- 24. Shutdenn Scheduled Over Next 6 Months liype, Date, and Duration of Each):
Refueling - January 30, 1993 - 68 days E5. If Shut Occ At End Of Feprt Feriod. Estiested Date of Startup:
- 26. Units in Test Status (Frict to Ceasercial Operationh Forecast Achieved ih!TIAL CF111CAlliY lhlilAL ELECIFIC11Y CP'1TCI AL OPERATION
CiEEAllk5 IATA REFORT DDDET N3 50-414 UNIT Catente 2.
DATE [.tt ester 15. 1992 COVLETED PV_f. A. Wilh.tti TELEFHONE 704-3E25346 M] NTH An e st er , 1972 _
(Q AVELEE DAILY FCiER LEVEL [A1 AVEFEE DAILY F0WER LEVEL (PWe-het) (MWe-Net) 1 !!34 17 0 2 1131 18 0
'3 1137 19 0 4 1134 20 0 5 1134 21 0 6 1146 22 0 7 1147 23 0 B 1147 24 0 9 1146 25 0 10 1146 26 0 11 1143 27 0 12 1132 28 0 13 1145 29 0 14 1145 30 0 15 1119 16 40 I
I
9 DOCKET NO. 50-414 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME CATAw6A 2 DATE 12/13/92 COMPLETED BY N. c. direiuns REPORT MONTH November 1992 TELEPHONE (/v4)-;6z-did; (1)I 2) (4) (5)
E HOD T A OF LICENSE CAUSE AND CORRECTIVE Y S SHUT EVENT SYS- ACTION TO N DOWN REPORT TEM COMPONENT O P DURATION O CODE CODE PREVENT RECURRENCE
. DATE E HOURS N R/X NO.
352.38 A 1 CB PUMPXX REACTOR COOLANT PUMP SEAL LEAK 4 92-11-16 S REPAIR B -- IA INSTRU NUCLEAR INSTRUMENTATION CALIBRATION 15-P 92-11-30 S --
(3) (4)
(1)F Forced (2)
Reason- Method: Exhibit G - Instructions for Preparation of, Data A-Equihment Failure (Explain) 1-Manual Ent y Sheets For Licensee S Scheduled 2-Manual Scram B-Maintenance or test 3-Automatic Scram Event Report (LER C-Refueling 4-Other (Explain) File (NUREG-0161))
D-Regulatorv Restriction l
' E-Operator Training & License Examination (51cxhibit I - Samo Source F-Administrative G-Operator Error (Explain)
H-Other (Explain)
e DOCKET NO: 50 414 UNIT: Catawba 2 ;
DATE: 12/15/92 1
NARRA1 EVE
SUMMARY
MONTil: November 1992 Catawba Unit 2 began the month of November operating at 100% full power.
The unit started a power decreasu on 11/15 at 2000 to take the unit off-line. The unit was off line from 11/16 at 0459 to 11/30-at 2122 for reactor coolant pump scal-leak repairs. . . The unit held during power esenlation approximately 20% power at 2150 for nuclear instrumentation calibrations. The unit ended the month in the hold, i
i I
t
's i
l l
l t
Prepared by: N. C.-Simmons
_ Telephone: 704-382-5263
% f W W V " W e rf-'vdT^? k 4 -WNb T*"W W Y P uswet
- w e' -w *i--e+- -e-++r M*C*-WPh N * * *wrf r
- c-es-- -* **-u-'=ry -*- e
liollIllLY_lif FUELULG_U!LOELMTIO!J REOU1;U
- 1. Facility name: CatawbL Unit 2
- 2. Scheduled next refueling shutdown: January 1993
- 3. Scheduled restart following refueling:-April 1922 Tif E PROJECT mat 1AGER !!AS DEE!! ADVISED BY SEPARATE COMMUl1ICATIO!1 OF Ally T.S. CHAf1CE OR LICE!1SE AME!1DME!1T. Ti!EREFORE, QUESTIO!!S 4 TilROUGli 6 WILL 110 LO!1GER DE MAI!1TAINED IN TilIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, han reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. 11 umber of Fuel assemblies (a) in the core: 122 (b) in the spent fuel pool: 18J2
- 8. Present licensed fuel pool capacity: L4_13 Size of requested or planned increase: -
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: S.ep_tember 20 u l
DUKE POWER COMPAtJY DATE: December 15. 1992
!!isme of
Contact:
IL,_A.. Wi l l iflaq Phone: 704-382-5346 l
4 1