y C:mm:nw:Ilth Edistn Braidwood Nuclear Power Station F l1 ; Route #1, Box 84 L'
Braceville, lilinois 60407
\\
Telephone 815/458-2801 1
December 10, 1992 BW/92-0618 s
f Directo, Office of Resource Management 9
Uniteu 43tes Nuclear Regulatory Commission
[
Washington, D.C.
20555 i
R*
ATTN Document Control Desk Gentlement Enclosed for your information is the Monthly Performance Report covering Braidwood Nuclear Power Station for the period November 1 through November 30, 1992.
e 3-
)
%A
^
(
v<
K. L. Kofro b Station Manager 0
(
Braidwood Station v
KLP JL/('
(69 iB5G)
Atthchmar,ts cc:
A. B. Davis, NRC, Region III NRC Resident Inspector Braidwood Ill. Dept. of Nucl'ar Safety M. J. '4allace E.
D. Eunigenburg T. J. Kovach Nuclear Fuel Services, FWR Plant Support INPO Records Center Performsnce Monitoring Group, Tech Staff Braidwood Station Nuclear Group, Tech Staff Braidwood Station R. Elliott - USNRC T. W. Simpkin D. R. Eggett - Nucleur Engineering Department 160020
'jfg 9212170038 921130 PDft ADOCK 05000456
('I)
R PDR s,
m_.._
t 4
i i
I
.i BRAIDWOOD NUCLEAR POWER STATION UhIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT COMMONWEALTH EDISON COMPANY NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 4
4
n,,.-,,.
l 1
I '.
Monthly Report for Braidwood Unit 1 i
A.
SMM Ary of OpR nting Exp1rience Braidwood Unit 1 entered the month of November, 1992 shutdown in its third refueling outage.
The Unit returned to service on November 3.
On November 20, the Unit was shutdown to perform balancing of the main turbine and for testing and inspection of the main generator cooling system.
The unit returned to service on November 25 and proceeded with post-refueling outage testing through ths end of the month, i
i i
1 4
9 1
t s
t 1
1 4
4 4
1 (691ZD850)3
4 B'.
OPERAT1HH_ DATA _REEDRT DOCKET NO.:
50-456 UNIT:
Braidwood 1 DATE:
12/10/92 COMPILED BY:
P. Stanczak TELEPHONE:
(815)458-2801 ext. 2486 OPERATING STA'IUS
- 1. Reporting Periods November, 1992 Gross Hours 720
- 2. Currently Authorized Power Level (MWt):
3411 Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (MWe-net):
1120 Max Dependable Capacity (MWe-gross):
1175 Max Dependable Capacity (MWe-net):
1120
- 3. Power level to which restricted (If Any): None
- 4. Reasons for restriction (If Any): None IBIS _MONIH YR TO DATE CUMULATIVE
- 5. Report Period Hours:
720.0 8040.0 38049.0
- 6. Hours Reactor Critical 604.3 6493.0 28773.2 7 RX Reserve Shutdown Hours:
OJ 0.0 0.0
- 8. Hours Generator on Line 531.2 6399 l 28231.7 t
- 9. Unit Reserve Shutdown Hours:
0.0 0.0' O.0
- 10. Gross Thermal Energy (MWHt) 1017061.Q 19521889.0 _,141Qg10L D
- 11. Gross Elec. Energy (MWH) 341087.0 6626467.0
__l R9_iB L % Q
- 12. Net Elec. Energy (MWH):
317674.0 6338608.0 27640532.Q
- 13. Reactor Service Factor:
83.9 80_.1 75.1
- 14. Reactor Aval10bility Factor 83.9 80.8 75.6
- 15. Unit Service Factor 73.8 79.6 74x2
- 16. Unit Availability Fnctort 73.8 79.6 74.2
- 17. Unit Capacity Factor (MDC NET):
39.4 70.4 64.9
- 18. Unit Capacity Factor (DER NET):
39.4 70.4 64.9
- 19. Unit Forced Outage Fate:
0.0 1.3 10.3
- 20. Unit Forced Outage Hours:
0.0 84.5 3236.3
- 21. Shutdown Scheduled Over Next 6 Months:
N/A
- 22. If Shutdown at End of Report Period Estimated Date of Sta'.tupt-N/A' (691ZD85G)4 l
l i
--_-___-__--__A
1
?
l i
[
C.
AVERAGE _ DAILY UNIT NET POWER LEVEL LOG DOCKET NO.
50-456 UNIT:
Braidwood 1 j
DATE:
12/10/92 COMPILED BY:
P. Stanczak TELEPHONE: -(815)458-2801 ext. 2486 i
i j.
MONTH: November, 1992
{
1.-
- 15 16, 655 i
l 2.
- 15 17.
653 3,
95 18.
610' 4,
254 19.
582 i
l 5.
247 20.
40 5.
286 21.
- 15 7.
326 22.
- 15 I
8.
523 23.
- 15 i
9.
533 24.
- 15 t
10.
529 2 5. -
157-1 i
j 11.
632 26.
717
)
l 12.
738 27, 849 l'
13.
746 28.
852 l
14, 728 29.
018' t
l 15.
641 30, 1005 t
i INSTRUCTIONS 1
4 j
On this form list the average daily unit : power - level in MWe-Net.for each l
day in the reporting month.
Compute to the - nearest whole megawatt.
These figures -_ will be used to' plot
- a. graph ' for _ each reporting month.
I Note-that when maximum dependable capacity is used for the net electrical i
rating of the unit there _ may be occasions when - the daily average power
. level exceeds the. 100% line (or the. restricted power ~ level line)..
In i.
such_ cases the average daily. unit power output-sheet should'bo footnoted to explain the apparent anomaly.
4 b
i i, -
f.i' l
4 j.
_ _691ZD85G)5.
(
a
~._,_a_...._._....
- -. ~ _ -. - --
D.
UNIT SHUTDOWNS /REDCCTIONS DOCKET NO.: 50-456 UNIT: Braidwood 1 DATE: 12/10/92 COMPILED BY: P.
Stanczak TELEPHONE: (815)458-2801 REPORT PERIOD: November, 1992 ext. 2486
_.Ns_
DATE TYPE HOURS REASON METHOD LE.R NfJMBER SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE 7
921120 S 115 B
1 N/A TJ TG Unit was shutdown to perform balancing of the main turbine and for inspection and testing of the main generator stator water cooling system due to high temperature.
Turbine balancing was completed and the stator water system was back-flushed prior to Unit restart.
emee************
SUMMARY
eeee*************
TYPE REASON METHOD SYSTEM & COMPONENT F-Forcsd A-Equipment Failure Maint or Test 1 - Manual Exhibit F & H S-Scheduled B-Maint or Test 2 - Manual Scram Instructions for Preparation of C-Refueling 3 - Auto Scram Data Entry Sheet D-Regulatory Restriction 4 - Continued Licensee Event Report E-Operator Training & License Examination 5 - Reduced Load (LER) File (NUREG-0161)
F-Administration 9 - Other G-Oper Error H-Other (6912D85G)11
E.
UNIOUE REPORTING REQUIREMENTS - UNIT 1 1.
Safet-/ Relief valve operations.
VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVENT None 2.
Licensee generated changes to ODCM.
Jone V
(609ZD85G)12
(.--
.... _... -... -.. -..... _.. - ~.
i i
1 1
F.
LICENSEE EVENT REPORTS - UNIT l-5 The following is a tabular summary of all Licensee Event Reports j
submitted during the reporting period, November 1 through November 30, 5
1992.
This information la provided pursuant to the reportable 1
occurrence reporting requirements as set forth in 10 CFR 50.73.
l-4-
Licensee Event Report-Report Number Data Title of Occurrence i
92-011 11/06/92 Inadequate Testing Frequency for f
Auxiliary Feedwater Pump. Start on Reactor Coolant Pump Bus Under--
voltage.
i l
l 92-012 11/17/92
'1A Auxiliary ' Feedwater Pump Start Due to Low-2 Steam Generator Level j
as-a Result of Leakage Past 1FWO79A.
i j
92-013 11/19/92 Spurious Safety Injection ' Signal i
Due to Unknown Causes.
l i
hl' 1
3 e
e (691ZD85G)6
II.
Monthly Report for Braidwood Unit 2 i
A.
Sutnmary_of ope r ating_ Experience Braidwood Unit 2
entered the month of
- November, 1992 at approximately 100% capable.
The Unit operated routinely until November 14 when the Unit tripped due to a potential transformer secondary fuse failure.
The fuse was replaced and the Unit was i
restarted on November 15.
The Unit operated routinely through the i
end of the month.
i 4
}
}
1 i
T a
i i
i k
(691ZD85G)7
1 1
4 j
B.
OPERATING DATA REPORT DOCKET NO.
50-457 l
UNIT:
Braidwood 2 4
DATE: '12/10/92 COMPILED BY P. Stanczak j
TELEPHONE:
(815)458-2801 l
ext. 2486 OPERATING STATUS l
- 1. Reporting Period: November, 1992 Gross Hours:
720
- 2. Currently Authorized Power Level (MWt):
3411 Design Electrical Rating (HWe-gross):
1175 j
Design Electrical Rating (MWe-net):
1120 j
Max Dependable Capacity (MWe-gross):
1175 j
Max Dependable Capacity (MWe-net):
1120 j
- 3. Power level to which restricted (If Any): None
- 4. Reasons for restriction (If Any): None THISJiQiTH YR TO DATE CUMQLATIE j
- 5. Report Period Hours:
720.0 8040.0 36131.0 1
- 6. Hours Reactor Critical 693.0 765112 30418.5
- 7. RX Reserve Shutdown Hours:
0.0 0.0 0.0
- 8. Hours Generator on Line 687.0 7603.8 30143.8__
l
- 9. Unit Reserve Shutdown Hours:
0.0 0.Q 0.0 i
- 10. Gross Thermal Energy (MWHt) 2191093.0 21217853.0 89573404.S_
{
- 11. Gross Elec. Energy (MWH) 744292.0 8270903aD 10128343.0
{
- 12. Net Elec. Energy (MWH):
712533.0 7953432.0 20316327.0
- 13. Reactor Service Factor 96_11 95.2 84.2-i
- 14. Reactor Availability Factor 96.3 95.2 84.2 l
- 15. Unit Service Factor:
95.(
94 h 83 3_
t j
- 16. Unit Availability Factor:
95 4 94.6 83.4 l
- 17. Unit Capacity Factot (MDC NET):
88.4 88.3 72.4 l
- 18. Unit Capacity Factor (DER NET):
88.4 88.3 72.4
- 19. Unit Forced Outage Rate:
4.6 32 3.8 i
- 20. Un!.t Forced Outage Hours:
33.0 249.5 1197.3
- 21. Shutdown Schedule Over Next 6 Months:
3rd Refuel Outage, March, 1993
- 22. If Shutdown at End of Report Period, Estimated Date of Startup N/A (691ZD85G)B
d.
AYERAGE_. DAILY UNIT NET POWER LEVEL LOG DOCKET NO.
50-457 UNIT:
Braidwood 2 DATE:
12/10/92 COMPILED BY:
P.
Stanczak TELEPHONE:
(815)458-2801 ext. 2486 MONTH: November, 1992 1.
1QU 16.
205 1042 17, 463 s.
1114 18.
1053 4.
1120 19.
1068 5.
1098 20.
1002 6.
- 1121 21.
1Q0 7.
1120 22.
1079 8.
1Q38 23.
1081 9,
1117 24.
1084 10.
1116 25 1094 11.
1077 26.
1100
- 12. ___
1113 27.
1079 13.
111C 28, 1104 14, 879 29.
1084 15.
- 15 3 0. ___
1014 INSTRUCTIONS On this foc-21st the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month.
Note that whet maximum dependable capacity is ussd for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line).
In such cases the >verage daily unit power output sheet should be footnoted to explain the apparent anomaly.
- Due to condenser efficiency.
(091ZD85G)9
~
~
D.
UMIT SHUTDOWNS /RFJsUCTIONS DOCKET NO.: 50-457-UNIT: Braidwood 2 DATE: 12/10/92 COMPILED BY: P. Stanczak TELEPHONE: (P15)458-2801 ext. 2486 l
REPORT PERIOD: November, 1992
[
No DATE TYPE HOURS' REASON METHOD LER NUMBER SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE f
17 921114 F-3 3..
A 3
92-007 TB FU A potential transformer secondary fuse mechanically failed which caused the generator neutral ground backup relay to actuate resulting in a turbine trip and a reactor trip. The fuse was replaced with a more durable fuse prior to Unit restart.
i r
I t
t
\\
i
- eme*************
- S U M M A'R Y
- t emee*************
i i
__ ME REASON METHOD SYSTEM & COMPONENT F-Forced A-Equipment Failure Maint or Test 1 - Manual Exhibit F & H f
S-Scheduled B-Maint or Test 2 - Manual Scram Instructions for Preparation of C-Refueling 3 - Auto Scram Data Entry Sheet D-Regulatory Restriction 4 - Continued Licensee Event Report E+ Operator Training & License Examination 5 - Reduced Load (LER) File (NUREG-0161)
F-Administration 9 - Other G-Oper Error H-Other (691ZD85G)13 e
~
e
..n
_.s._.-
8 E.-
EUGUE REPORTYNG REOUYREMENTS - UNIT 1 1.
Safety / Relief valve operations.
VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED AC UATION CQNDITION OF EVENT None 2.
Licensee generated changes to ODCM.
None i
k i
i 1
)
i i
(6912D85G)l4
F.
LICENSEE. EVENT REPORTS _.. UNIT 2 The following is a tabular summary of all Licensee Event Reports submitted during the reporting period, November 1 through November 30, 1992.
This infor nation is provided pursuant to the reportable occurrence reporting requirements ar set forth in 10 CFR 50.73.
l i
l Licensee Event Report j
EmpnIl_Ilmnhttr__
Date Title of Occurrence I
j None 1
l i
f l
4 i
I i
i
)
4
}
1 d
)
(6912D85G)10