OPERATING DATA REPORT DOCKET NO.
50-366 DATE l-10-60 COMPLETED BY J. W. Hoder.
TELEPilONE 912-367-7781 OPERATING STATUS
- 1. Urut Name:
Hatch 2 Notes
- 2. Rep.srting Period:
December 1979
- 3. Liceawd Thennal Power (Mh t): 2436 MWt
- 4. Naraplate Rating (Gross MWe):
817.0 Gross MWe
- 5. Des 51 Electrical Rating (Net MWe):
784.0 Net MWe
- 6. Slaumum Dependable Capacity (Gross MWe): 782.O Gross MWE 7 Stadmum Dependable Capacity (Net MWe):
749.0 Net MWe
- 5. If Cbnges Occur in Capacity Ratings (!! ems Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Lesel To Which Restricted,1f Any (Net MWe):
- 10. Remns For Restrictions. lf Any:
This Month Yr.-to Date Cumulative
- 11. Hoes In Reporting Period 744 2833 2833 1:. Nu: ' er Of Hours Reactor Was Critical 744.0 2663.5 2663.5 a
- 13. Rea: tor Resene Shutdown llours 0.0 0.0 0.0 IJ. Hot 4 Generator On.Line 744.0 2414.6 2414.5
- 15. Unit Ret,erve Shutdown flours 0.0 0.0 0.0
- 16. Grou Thennal Energy Generated (MWil) 1793810 5494062 5494062 M
l~ Grou Electrical Energy Generated (MWil) 612090 1835960 1835960
- 15. Net E:ectrical Energy Generated (MWil) 588617 1757137 175713/
- 19. Unit 5enice Factor 100.0 85.2 85.2
- 20. Unit wailability Factor 100.0 85.2 85.2
- 21. Unit Capacity Factor (Using MDC Net) 105.6 82.8 82.8
- 22. Unit Capacity Factor (Using DER Net) 100.9 79.1 79.1
- 23. Unit Forced Outage Rate 0.0 10.6 10.6
- 24. Shut.iowns Scheduled Oser Nest 6 Months (Type. Dale.and Duration of Eacht:
Vent Header Deflector and Surveillance Outage, March 1 to April 13
- 25. If Sbt Down At End Of Report Puiod. Estimated Date of Startup:
- 20. Unit + in Test Status (Prior to Commercial Operationi:
Forecast Achiesed INITIAL. CRITICA LITY INITI A L ELEC1 RICITY COMMERCI AL OPERAT!ON 90023076 (p
c,y,,
8001150 L,
j AVERAGE DAILY UNIT POWER LEVEL ll i
DOCKET NO. _50-366 UNIT llatch 2 DATE 1-10-80 1
J. W. Roden COMPLETED !!Y TELEPil0NF 912-367-7781
. December 1979 MONTil DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
(MWe. Net) 803 802 37 2
750 ja 803 3
794 802 19 4
804 802 20 3
802 802 23 6
798 770 22 7
798 761 23 741 8
2s 797 9
799 798 25 10 801 26 800 11 796 27 802 795 12 28 801 791 13 29 768 14 793 799 30 15 757 800 3
16 799 INSTRUCTIONS On this fonnat, list the average daily umt power levelin MWe Net for each day in the reportmg month. Compute to 1
the nearest whule megawatt.
(9/771 iil 90023077 ll
~.... - -
CO UNITSl!UTDOWNS AND POWER REDUCTIONS DOCKET NO.
30 366 Q
UNIT NA51E flatch 2 DATE ll-10-F,0 COMPLETED fly o
REPORT hlONTil IToremhor Ch 3
.3 s 5"o Cause & Corrective
,.= =M Licensee g -r,
.=E _r ri=
E No.
Date g
3g g
,g g 5 Event
- 7 El Action to
$3 5
j5j Report #
,# G gu Present Recurrence d
No outages for the month.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G -Instruttions 5: Scheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Shee's for Licensee C Refueling 3-Automatic Scram.
Event Rerart (LER) File (NUREG-D-Regulatory Restriction 4 Other (Explain) 0161)
E-Operator Training & License Exan:ination F-Administratise 5
G-Operational Error (Explain)
Exhibit I - Same Source (9/77) 11-01her (Explain)
9 NARRATIVE REPORT UNIT 2 There was no single release of radioactivity or single radiation exposure which accounts for more than 10% of the allowable annual values during the previous month of 1979 90023079
.~
HATCH 2 SAFETY-RELATED MAINTENANCE REQUESTS TO DE REPORTED FOR OCTOBER 1979
{
NUMBER DATE COMPLETED DESCRIPTION 79-5906 12-15-79 Checked for loose connections on Safe Guard Equipment Cooling fans 79-5875 12-14-79 Repaired RBM Channel "A"
79-5487 12-14-79 Repaired downscale RPM indicator in C'o n t ro l Room j
for RCIC j
79-5700 11-30-79 Replaced HPCI flow transmitter 79-5742 12-11-79 Repaired RWCU backwash inlet valve 79-5296 12-11-79 Repaired air line leak to HPCI steam line pot drain AOV 79-5783 12-11-79 Calibrated torus water level recorder 79-5739 12-4-79 Repaired safety relief valve; reset keylock switch 79-5743 12-6-79 Replaced HPCI steam line dP instrument 79-1759 12-5-79 Relapped safety relief valves 79 4848 12-7-79 Repaired PSW inlet A0V 79-5488 11-21-79 2C diesel generator trips on high crankcase pressure 79-5668 12-4-79 Repaired blown seat on RWCU pump "A"
79-5576 11-29-79 Broken sight glass on RWCU precoat returned 79-5606 12-2-79 Blown gasket on RWCU precoat tank flow glass 90023080
I 4
79-5544 11-29-79 Investigated and repaired B LPCI inverter 79-5238 11-29-79 Investigated and repaired i
operation of the level I
l switch for fuel oil transer pumps t
79-5585 12-14-79 2D PSW not pumping required flow 79-6003 12-26-79 Repaired standby diesel service water pump 79-5440 12-23-79 Repaired oil leak on Unit 2 3B RHR and core spray jockey pump 90023081
. * '. ~.
OPERATING DATA REPORT DOCKET NO.
50-_366 DATE 12-10-79 CO.lPLETED By G. L. Johnson
\\
TELEPilONE 912-367-7781 OPERATING STATUS Hatch 2 g"changesweremade.
- 1. Unit Name:
November 1979 Monthly Gen, on-line #14 was
- 2. Reporting Period:
2436 MWt 607.4.
Shutdown #79-30 dur-
- 3. Licensed Thennal Power (31Wt p 817.0 Gross MWe ation was changed from 48.6
- 4. Nameplate Rating (Gross 51We):
784.0 Net MWe to correct for round-off
- 5. Design Electrical Rating (Net S1We):
782.0 Gross MWe errors,
- 6. Slaximum Dependable Capacity (Gross SIWE):
749.0 Net MWe
- 7. Staximum Dependable Capacity (Net 51Wel:
S. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Gise Reasons:
)
- 9. Power Level To Which Restricted,if Any (Net.\\lWe):
- 10. Reasons For Restrictions,If Any i
This 5f onth Yr..to Date Cumulatis e 720 2089 2089
)
- 11. Hours in Reporting Period 689.1 1919.5 1919.5
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0
- 13. Renetor Reserve Shutdown Hours 607.3 1670.5 1670.5
- 14. Hours Generator On-Line 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours 4'
1385270 3700252 3700252
- 16. Gross Thermal Energy Generated (51WH) 457910 1223870 1223870
- 17. Gross Electrical Energy Generated (SIWH1 438341 1168520 1168520
- 18. Net Electrical Energy Generated (N!WH) 84.4 80.0 80.0
- 19. Unit Service Factor 84.4 80.0 80.0
- 20. Unit Availability Factor 81.3 74.7 74.7
- 21. Unit Capacity Factor (Using SIDC Neil 77.7 71.3 71.3
- 22. Unit Capacity Factor (Using DER Net) 4.5 14.6 14.6
- 23. Unit Forced Outa;;e Rate
- 24. Shutdowns Scheduled Oser Next 6 hionths (T.spe. Date,and Duration of Eachi:
Vent Header Deflector and Surveillance Outage, March 1 to April 15
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial OperationP Forecast Achiesed INITI A L CRITICA LITY INITIAL ELECTitiCITY CON 1\\1ERCI A L OPER ATION 90023082 (0/77 )
50-366 DOCKET NO.
UNITS!!UTDOWNS AND POWER REDUCTIONS UNIT NAME Hatch 2 g
DATE 12-10-/9 g
COMPLETED BY G. L. JQhnson g
REPORT MON fil November mD'110NE 912-367-7 781 g
CM O
O E
E Ch
.5 E "5:
$ 5'E Licensee
.E%
j%
Cause & Corrective No.
Date g
3 Ej s
2s5 Event gi g3 Action to yE 5
3 ;g g Report #
in U O
P. event Recurrence H
o m
u O
79-30 79-11-3 5
48.4 B
1 NA CB HTEXCH Shutdown due to inop HPCI Inboard Isolation Valve 79-31 79-11-9 F
12.7 A
3 NA HJ HTEXCH Rx Scram: due to MSR High Level 79-32 79-11-10 F
13.6 A
3 NA CD VALVEX Rx Sc' ram: MSIV closed due to momen-tary loss of power to the 4160 volt buss 79-33 79-11-14 F
19.2 A
3
_NA EC MOTORX Rx Scram: Loss of DC to EHC when taking'LPCI inverter out of service 79-34 79-11-18 S
18.
B l'
NA CB HTEXCH~
Shutdown to repair inop LPCI inverter
- 1 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions
' S: Scheduled A Fquipment Failure (Explain) 1 -Manual for Preparation of Data B M:mtenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREC-D Regulattiry Restriction 4-Other (Explain) 0161)
E-0;ierator Training & License Examination 5
F-Administ rative Exhibit 1.Same Souree
~.
G-Operational Error (Explain)
(9/77)
Il-Other (Exp;ain)
.