ML20125D723
Jump to navigation
Jump to search
| ML20125D723 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 01/10/1980 |
| From: | Manry M GEORGIA POWER CO. |
| To: | Cintula T NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML20125D726 | List: |
| References | |
| PM-80-12, NUDOCS 8001150487 | |
| Download: ML20125D723 (1) | |
Text
,
Georgia Power Company Post Office Box 442 Baxley, Georgia 31513 Telephone 912 367 7781
)
912 537 9444 1
m Georgia Power Edwin i. Hatch Nuclear Plant the soutt> vin emmtrc sprem January 10, 1980 PM-80-12 PLANT E. I. HATCH NRC Monthly Report Docket No. 50-366 Ted Cintula 12105 M.'4.B.B.
U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sirs:
Pursuant to Section 6.9.1.6 of the Hatch Unit 2 Technical Specifications, please find attached the NRC Monthly Operating Report.
-],',,;. C ' i-- ' '
M. Manry Plant Manager MM/pebo xo:
R. e. Rogers C. T. Moore T. V. Greene 90023075 rue Od Wimus s di eq i
g 8001150 O
,