ML20125D660
| ML20125D660 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 02/01/1985 |
| From: | Felton J NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Devine T GOVERNMENT ACCOUNTABILITY PROJECT |
| Shared Package | |
| ML20125D664 | List: |
| References | |
| FOIA-84-740 NUDOCS 8506120432 | |
| Download: ML20125D660 (6) | |
Text
pa #Q
+I (0,,
UNITED STATES g
E p,
NUCLEAR REGULATORY COMMISSION L\\
_b
- E WASHINGTON, D. C. 20555 s.....J Docket No. 50-275/323 FE8 1 506 Mr. Thomas Devine Government Accountability Project Institute for Policy Studies 1555 Connecticut Avenue, NW, Suite 202 IN RESPONSE REFER Washington, DC 20036 TO F01A-84-740
Dear Mr. Devine:
This is a further response to your letter dated September 13, 1984, in which you requested, pursuant to the Freedom of Information Act, all documents connected with the June 12, 1984, Congressional Briefing on the Diablo Canyon Nuclear Power Plant.
The documents listed on the enclosed appendix are being placed in the NRC Public Document Room (PDR). They will be filed in PDR folder F0IA-84-740 under your name.
The NRC has not completed its review of the remaining documents subject to your request. We will respond as soon as the review is completed.
Sin rely, J. M. Felton, Director Division of Rules and Records Office of Administration
Enclosure:
As stated 8506120432 850201 PDR FOIA DEVINE84-740 PDR
Re:
F01A-84-740 APPENDIX 1.
06/14/84 Chairman's Briefing Book.
(225pages) 2.
06/01/84 Memo to W. J. Dircks from N. Palladino; Diablo Canyon Hearing.
(1 page) 3.
06/13/84 Memo to Commissioners from J. E. Zerbe; Diablo Canyon Status.
(10 pages)
- 4. '06/14/84 Letter to Honorable M. Udall from V. Gilinsky.
(6 pages) 5.
6/14/84 Testimony of H. R. Denton before the Subcomittee on Energy and the Environment, Comittee on Interior and Insular Affairs, re: Diablo Canyon Licensing Concerns.
(7pages) 6.
06/14/84 List of NRC Staff attendess at the M. Udall Hearing of 06/14/84.
(1 page) 7.
06/14/84 Testimony of N. J. Palladino before Congressman Udall's Subcommittee on Energy and the Environment - (Version 1).
(4pages) 8.
06/14/84 Testimony of N. J. Palladino before Congressman Udall's Subcomittee on Energy and the Environment - (Version 2).
(7pages) 9.06/14/84 Testimony of Mr. I. T. Yin before Congressman Udall's Subcomittee on Energy and the Environment.
(7pages)
- 10. 06/13/84 Letter to Congressman Udall from N. Palladino responding to a 02/22/84 request for answers to ten (10) questions re: Diablo Canyon.
(87 pages)
- 11. 06/11/84 Memo to Comissioners and Comission Level Office Directors from N. J. Palladino; Warmup for Diablo Canyon Hearing with Udall Comittee.
(3 pages)
- 12. 6/14/84 Annotated copy of Chairman Palladino's statement before the Udall Subcomittee - see item 7.
(3 pages)
- 13. 05/31/84 Letter to N. J. Palladino from S. Naymark, Quadrex Corp.
(5 pages)
- 14. 04/09/84 Memo to S. J. Chilk from N. J. Palladino; Licensed Reactor Operator Examinations.
(4 pages)
Re: F0!A-84-740 APPENDIX
- 15. 04/09/84 Memo to S. J. Chilk from V. Gilinsky.
(3 pages)
- 16. 04/19/84 Memo to J. Ebersole from N. J. Palladino; Reactor Operator Experience.
(1page)
- 17. 04/13/84 Copy of Memorandum and Order (CLI-84-5) including separate view statements by Chairman Palladino, Comissioner Gilinsky, and Comissioner Bernthal.
(35 pages)
- 18. 06/13/84 Memo to the Comissioners from J. E. Zerbe; Diablo Canyon Status.
(10pages)
- 19. 06/11/84 Memo to the Commissioners from J. K. Asselstine; Diablo Canyon.
(1 page)
- 20. 03/1984 NUREG-0675 Supplement No. 22, Safety Evaluation Report related to the operation of Diablo Canyon Nuclear Power Plant Units 1 and 2.
(21 pages) 21.
Excerpt from SSER #21.
(3 pages)
- 22. 04/03/84 Copy of Order (CLI-84-4); issue of the consideration of complicating effects of earthquakes on emergency planning in the Diablo Canyon licensing proceedings.
(18 pages)
- 23. Undated Letter to Honorable M. Udall from N. J. Palladino; written responses to list of coments and questions resulting from Dr. H. Myer's review of NRC Inspection Report No. 50-275/83-37 and its draft.
(26 pages)
- 24. 06/12/84 Memo to C. Kamerer to W. J. Dircks; June 14, 1984 Udall Hearings on Diablo Canyon.
(10 pages)
Diablo Canyon.
Briefing) paper, 10 CFR 2.206 Petitions re:
- 25. Undated (2pages
- 26. 6/11/84 Note to N. Haller from J. Roe re: Udall Hearing.
(1 page)
- 27. 05/23/84 Letter to N. J. Palladino from M. K. Udall.
(1 page)
- 28. 06/08/84 Letter to N. J. Palladino from G. A. Maneatis, PG&E, re: Request that the Comission grant PG&E authority to operate Diablo Canyon Unit I above five percent power on or about 06/19/84.
(3 pages)
- 29. 06/11/84 Memo to Comissioners from C. Kamerer; Draft Testimony -
Diablo Canyon.
(5 pages)
7 k
I f
I i
t.
i s
i e
O d
e n
t 1-s-
~.
0 i
'r-(
l
~-
i l
4
{
f -
t b
eg A
4 0
e I
e as W
k---
a"']
- ge-L
[
4
.4 l
-1 s-
_., _J 4 -A I
1 6-p
' h
',k
= = eus.**we
,p.
a.
==
m.w+.
W
/
(M wt L 1 -6 r lk UDALL HEARINGS
- 1r)
CHAIRMAN'S BRIEFING BOOK
~
June 14, 1984 Ca P ladino 1.
Prepared Testimony 2.
Diablo Canyon Unit 1 - Status Sumary June 8, 19'84 g 3.
Diablo Canyon Unit 2 - Status Sumary June 8, 1984 4.
Udall Letter May 23, 1984 4a. Memo frcrn CbM=n to Dircks June 1 1984 5.
Commission Order CLI 84-5
. April 13,;1984
.g 6.
License Amer.dment No. 8 April 13, 1984 Component Cooling Water 7.
License Amendment No. 9 April 18, 1984 i
Jet Impingement Loads Seismic Design Program 8.
NRR Order Modifying License April 18, 1984 7 License Conditions For Piping s s 4.v 9.
Piping Report, Divislon of Engineering April 12,1984 10.,ACRS Piping Letter April 9, 1984 Isa Yin Testimony (Udall Hearing)
June 14, 1984
- 12. Isa Yin Statements Commission Meeting 3/26 March 26, 1984 April;11, 1984..
Comission Meeting 4/13
- 13. H. Meyers Memo on NSC Audit
. April 10, 1984 (BoardNotification84-079)
- 14. Palladino Testimony at Udall Hearing 5 January 24',. 1984,.,
- 15. Udall Letter February 22, 1984
- 16. Response to Udall (Draft)
' February;8, 1984
- 17. Panetta Letter
- 18. Response to Pane'.~co (Draft)
- 19. SER Supplement 22 (Abbreviated)
March 1984.
c T
- 20. ALAB-763 on. Design QA March 20, 1984 g
- 21. Proposed Fine-550,000 May 17, 1,984
/
J
(
.(
UDALL HEARINGS CHAIRMAN'S BRIEFING BOOK June 14, 1984 Chainnan Palladino 1.
Prepared Testimony Harold Denton 2.
Diablo Canyon Unit 1,- Status Sumary June 8, 1984 3.
Diablo Canyon Unit 2 - Status Sun. nary June 8, 1984 4.
Udall Letter May 23, 1984 SI Nis EEL 8k-hl 13 $h84 n
6.
License Amenoment No'. 8 April 13, 1984 Component Cooling Water 7.
License Amendment No. 9 April 18, 1984 Jet Impingement Loads Seismic Design Program 8.
NRR Order Modifying License April 18, 1984 7 License Conditions For Piping f.
\\
9.
Piping Report, Divislon of Engineering April 12, 1984
- 10. ACRS Piping Letter April 9, 1984
- 11. Isa Yin Testimony (Udall Hearing)
June 14, 1984
- 12. Isa Yin Statements Comission Neeting 3/26 March 26, 1984 Comission Meeting 4/13 April 11, 1984
- 13. H. Meyers Memo on NSC Audit April:10, 1984 (BoardNotification84-079)
- 14. Palladino Testimony at Udall Hearing January 24', 1984
~
' february 22, 1984
- 15. Udafl Letter
'16. Response to Udall (Draft)
- 17. Panetta Letter February 8, 1984 18.ResponsetoPanetta(Draft)
- 19. SER Supplement 22 (Abbreviated)
March 1984
- 20. ALAB-763 on Design QA March 20, 1984
- 21. Proposed Fine-$50,000 May 17, 1984 J
-