Category:CORRESPONDENCE-LETTERS
MONTHYEARML20212J7481999-09-29029 September 1999 Forwards Insp Rept 50-133/99-02 on 990915.No Violations Noted.Areas Examined During Insp Included Portions of Physical Security Program HBL-99-011, Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 980101-981231, for Humboldt Bay Power Plant,Unit 31999-08-27027 August 1999 Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 980101-981231, for Humboldt Bay Power Plant,Unit 3 HBL-99-014, Forwards Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates,1999-07-23023 July 1999 Forwards Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates, ML20209D9981999-07-0808 July 1999 Ack Receipt of Which Transmitted Rev 9 to Physical Security Plan for Humboldt Bay Power Plant,Under Provisions of 10CFR50.54(p).Changes Do Not Decrease Plan Effectiveness,So NRC Approval Is Not Required HBL-99-012, Forwards Rept of Rev 29 to Hbpp Emergency Plan,Effective 990610.Changes in Rev Do Not Decrease Effectiveness of Plan, Per 10CFR50.54(q).Plan Has Been Distributed to Region IV & Is Not Included as Part of Submittal1999-07-0707 July 1999 Forwards Rept of Rev 29 to Hbpp Emergency Plan,Effective 990610.Changes in Rev Do Not Decrease Effectiveness of Plan, Per 10CFR50.54(q).Plan Has Been Distributed to Region IV & Is Not Included as Part of Submittal ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address ML20207E7301999-05-27027 May 1999 Discusses Reorganization of Nrr,Effective 990328 & Forwards Organizational Chart HBL-99-008, Forwards Annual Rept of Occupational Radiation Exposure for 1998. Radiation Exposure Rept Provided on Encl Diskette in Electronic Format of Reg Guide 8.7.Without Encl1999-04-30030 April 1999 Forwards Annual Rept of Occupational Radiation Exposure for 1998. Radiation Exposure Rept Provided on Encl Diskette in Electronic Format of Reg Guide 8.7.Without Encl ML20205L9951999-04-0808 April 1999 Forwards Insp Rept 50-133/99-01 on 990222-25 & 0308.No Violations Identified HBL-99-006, Forwards Annual Radioactive Effluent Release Rept, Covering Period Jan-Dec 1998.Encl 2 Contains Revs 1 & 2 to Safstor ODCM as Required by Specification Section 4.2 of Safstor Offsite Dose Calculation Manual1999-03-31031 March 1999 Forwards Annual Radioactive Effluent Release Rept, Covering Period Jan-Dec 1998.Encl 2 Contains Revs 1 & 2 to Safstor ODCM as Required by Specification Section 4.2 of Safstor Offsite Dose Calculation Manual DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) HBL-99-003, Forwards Annual Facility Status & Survey Rept, for Jan-Dec 19981999-03-31031 March 1999 Forwards Annual Facility Status & Survey Rept, for Jan-Dec 1998 ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot HBL-98-021, Forwards Rept Change (Rev 28) to Hbpp Emergency Plan, Effective 981126.Updated Emergency Plan,Not Included as Part of Submittal1998-12-18018 December 1998 Forwards Rept Change (Rev 28) to Hbpp Emergency Plan, Effective 981126.Updated Emergency Plan,Not Included as Part of Submittal ML20195H7631998-11-20020 November 1998 Forwards Insp Rept 50-133/98-04 on 980901-03,1012-17 & 20-22.No Violations Noted.Insp Focused on Activities Associated with Removal of 250 Feet Ventilation Stack HBL-98-013, Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for Jan-Dec 1997. Encl Annual Rept Provides Brief Description of 10CFR50.59 Facility Design Changes, Including Summary of Each SE1998-11-10010 November 1998 Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for Jan-Dec 1997. Encl Annual Rept Provides Brief Description of 10CFR50.59 Facility Design Changes, Including Summary of Each SE ML20154G4441998-10-0101 October 1998 Ack Receipt of Which Transmitted Rev 8 to Physical Security Plan for Humboldt Bay Power Plant,Under Provisions 10CFR50.54.Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required DCL-98-123, Submits Listed Address Changes for NRC Service Lists for Listed Individuals1998-09-0909 September 1998 Submits Listed Address Changes for NRC Service Lists for Listed Individuals HBL-98-015, Forwards Rev 2 to DSAR for Humboldt Bay Power Plant,Unit 3, to Comply W/Decommissioning Rule.Dsar Was Formerly Known as Safstor Decommissioning Plan.Encl 1 Identifies & Describes Rept Changes1998-08-28028 August 1998 Forwards Rev 2 to DSAR for Humboldt Bay Power Plant,Unit 3, to Comply W/Decommissioning Rule.Dsar Was Formerly Known as Safstor Decommissioning Plan.Encl 1 Identifies & Describes Rept Changes DCL-98-108, Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year..1998-08-0707 August 1998 Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year.. HBL-98-009, Submits Info Describing site-specifc Decommissioning Cost Estimates1998-08-0505 August 1998 Submits Info Describing site-specifc Decommissioning Cost Estimates ML20236G0691998-06-19019 June 1998 Forwards Endorsement 123 to Neila Policy NF-228,Endorsement 145 to Neila Policy NF-113,Endorsement 124 to Neila Policy NF-228 & Endorsement 89 to Maelu Policy MF-103 L-98-027, Forwards Rev 8 to Physical Security Plan.Encl 1 Identifies & Describes Plan Changes,Which Indicated W/Rev Bars in Left Margin of Physical Security Plan.Rev Withheld,Per 10CFR2.790(d)1998-06-11011 June 1998 Forwards Rev 8 to Physical Security Plan.Encl 1 Identifies & Describes Plan Changes,Which Indicated W/Rev Bars in Left Margin of Physical Security Plan.Rev Withheld,Per 10CFR2.790(d) HBL-98-011, Forwards Rept of Rev 27 to Hbpp Emergency Plan,Effective 980507,per 10CFR50.4 & 10CFR50.54(q).Updated Plan Has Already Been Distributed to NRC Region IV IAW Hbpp Procedures.W/O Rept1998-06-0404 June 1998 Forwards Rept of Rev 27 to Hbpp Emergency Plan,Effective 980507,per 10CFR50.4 & 10CFR50.54(q).Updated Plan Has Already Been Distributed to NRC Region IV IAW Hbpp Procedures.W/O Rept ML20247R9091998-05-26026 May 1998 Forwards Copy of Transcript of Public Meeting Held by NRC W/Participation by PG&E on 980429 in Eureka,California Re Decommissioning of Humboldt Bay Power Plant ML20236E7681998-05-22022 May 1998 Forwards Insp Rept 50-133/98-03 on 980427-30.No Violations Noted.Insp Included Plans for Future Decommissioning of Facility,Including Removal of Unit 3 Stack & Eventual Dry Cask Storage of Unit 3 Spent Fuel ML20247L3571998-05-18018 May 1998 Clarifies Remark Re Discharge Through Existing Ventilation Stack to Avoid Confusion.Remark Was in Response to Question Re Purpose of Dismantlement & Replacement of Existing Ventilation Stack ML20247F9241998-05-14014 May 1998 Forwards Insp Rept 50-133/98-02 on 980414-15.No Violations Noted.Areas Examined During Insp Included Portions of Physical Security Program.Determined That Physical Security Program Was Properly Implemented ML20216B7291998-05-12012 May 1998 Expresses Appreciation for Support Provided for Recent Public Meeting Held at Eureka Inn on Decommissioning of Humboldt Bay Power Plant ML20216B6801998-05-11011 May 1998 Expresses Appreciation for Outstanding Support Staff Provided for Recent Public Meeting Held at Eureka Inn on Decommissioning of Humboldt Bay Power Plant ML20217H1161998-04-21021 April 1998 Forwards Annual Rept of Occupational Radiation Exposure, for Employees & Visitors Monitored at Humboldt Bay Power Plant During CY97.Rept on Diskette.W/O Encl ML20216C8681998-04-0808 April 1998 Forwards Amend 32 to License DPR-7 & Safety Evaluation. Amend Revises TS to Implement GL 89-01 & to Incorporate Requirements of Revised 10CFR20 & App I to 10CFR50 HBL-98-008, Forwards Annual Radioactive Effluent Release Rept for 970101-1231. Rept Contains Comparison of Max Calculated Dose to Individual Members of Public W/Numerical Guidelines of 10CFR50 App I1998-03-31031 March 1998 Forwards Annual Radioactive Effluent Release Rept for 970101-1231. Rept Contains Comparison of Max Calculated Dose to Individual Members of Public W/Numerical Guidelines of 10CFR50 App I HBL-98-006, Forwards Annual Facility Status & Survey Rept for 1997. Section a Addresses Facility Status & Section B Presents Results of Monitoring Performed for Radiological Environ Monitoring Program1998-03-31031 March 1998 Forwards Annual Facility Status & Survey Rept for 1997. Section a Addresses Facility Status & Section B Presents Results of Monitoring Performed for Radiological Environ Monitoring Program HBL-98-003, Forwards Corrected TSs Re LAR 96-02,in Entirety W/ Affected Pages Retyped1998-03-13013 March 1998 Forwards Corrected TSs Re LAR 96-02,in Entirety W/ Affected Pages Retyped HBL-98-002, Submits Updated Post-Shutdown Decommissioning Activities Rept for Humboldt Bay Power Plant,Unit 3. Safstor Decommissioning Plan Will Be Considered FSAR for Hbpp1998-02-27027 February 1998 Submits Updated Post-Shutdown Decommissioning Activities Rept for Humboldt Bay Power Plant,Unit 3. Safstor Decommissioning Plan Will Be Considered FSAR for Hbpp ML20203K9691998-02-27027 February 1998 Forwards Insp Rept 50-133/98-01 on 980126-29.No Violations Noted.Major Areas Reviewed as Part of Insp Included Compliance W/Selected TS of License,Review of 1997 Annual Exercise & Evaluation of Facility Re Decommissioning Plan HBL-98-001, Informs That Existing Hbpp PM Program Adequately Meets Requirements of Maint Rule.Summary of Program & Basis for Determining Maint Rule Compliance at Plant,Encl1998-01-26026 January 1998 Informs That Existing Hbpp PM Program Adequately Meets Requirements of Maint Rule.Summary of Program & Basis for Determining Maint Rule Compliance at Plant,Encl ML20198J4791998-01-0707 January 1998 Informs That LL Wheeler Assumed Project Mgt Responsibilities for Humboldt Bay on 971229.LL Wheeler Can Be Contacted at Listed E-mail Address ML20199B3851997-11-13013 November 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-133/97-02 on 971001 HBL-97-016, Responds to NRC Re Violations Noted in Insp Rept 50-133/97-02.Corrective Actions:Correctly Reset Process Water Monitor Warning High & Low Alarms & re-educated All Operators on Proper Method to Set Process Water Monitor1997-10-27027 October 1997 Responds to NRC Re Violations Noted in Insp Rept 50-133/97-02.Corrective Actions:Correctly Reset Process Water Monitor Warning High & Low Alarms & re-educated All Operators on Proper Method to Set Process Water Monitor HBL-97-015, Submits Inventory Changes at Unit 3 from 970401-0930 for Matls Re Enriched U Fuel,Plutonium in Fuel,Fission Counters & Incore Flux Detectors.Encl 2 Provides Data Required by Form DOE/NRC-741.W/o Encl1997-10-0909 October 1997 Submits Inventory Changes at Unit 3 from 970401-0930 for Matls Re Enriched U Fuel,Plutonium in Fuel,Fission Counters & Incore Flux Detectors.Encl 2 Provides Data Required by Form DOE/NRC-741.W/o Encl ML20217D6191997-10-0101 October 1997 Forwards Insp Rept 50-133/97-02 on 970513-0828 & Nov.Nrc Will Use Licensee Response to NOV to Determine Whether Further Enforcement Action Necessary HBL-97-012, Forwards Rept of Rev 26 to Plant Emergency Plan,Effective 970801.Changes Do Not Decrease Effectiveness of Plan1997-08-28028 August 1997 Forwards Rept of Rev 26 to Plant Emergency Plan,Effective 970801.Changes Do Not Decrease Effectiveness of Plan ML20210H4671997-08-0202 August 1997 Requests That NRC Suspend Investigation & Review of Issues Raised by Modesto Irrigation District & Transmission Agency of Northern CA Re Contention That PG&E Had Violated Nuclear License Conditions Known as Stanislaus Commitments ML20149K8321997-07-25025 July 1997 Ack Receipt of Transmitting Rev 7 to Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p). Changes Do Not Decrease Effectiveness of Plan & No NRC Approval Is Required HBL-97-009, Provides Addl Justification to Support TS Change Request Contained in LAR 96-02 ,re Establishment of Radiological Effluents Control Program & in Response to 970416 Telcon1997-06-12012 June 1997 Provides Addl Justification to Support TS Change Request Contained in LAR 96-02 ,re Establishment of Radiological Effluents Control Program & in Response to 970416 Telcon L-97-035, Forwards Info Re Changes to Humboldt Bay Power Plant,Unit 3 Physical Security Plan.Changes Do Not Decrease Safeguards Effectiveness of Plan & Are Submitted Per 10CFR50.54(p). Encls Withheld Per 10CFR2.790(d)1997-04-0909 April 1997 Forwards Info Re Changes to Humboldt Bay Power Plant,Unit 3 Physical Security Plan.Changes Do Not Decrease Safeguards Effectiveness of Plan & Are Submitted Per 10CFR50.54(p). Encls Withheld Per 10CFR2.790(d) L-97-033, Confirms Final Disposition of Specific Hazardous Wastes Shipped to IT Corp Panoche & Vine Hill Facilities from Plant in Jul 19861997-04-0202 April 1997 Confirms Final Disposition of Specific Hazardous Wastes Shipped to IT Corp Panoche & Vine Hill Facilities from Plant in Jul 1986 HBL-97-003, Documents Utils Understanding of Results in Discussions from Meeting W/Nrc Personnel to Discuss Application of New Decommissioning Rule to Hbpp1997-02-20020 February 1997 Documents Utils Understanding of Results in Discussions from Meeting W/Nrc Personnel to Discuss Application of New Decommissioning Rule to Hbpp 1999-09-29
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARHBL-99-011, Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 980101-981231, for Humboldt Bay Power Plant,Unit 31999-08-27027 August 1999 Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 980101-981231, for Humboldt Bay Power Plant,Unit 3 HBL-99-014, Forwards Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates,1999-07-23023 July 1999 Forwards Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates, HBL-99-012, Forwards Rept of Rev 29 to Hbpp Emergency Plan,Effective 990610.Changes in Rev Do Not Decrease Effectiveness of Plan, Per 10CFR50.54(q).Plan Has Been Distributed to Region IV & Is Not Included as Part of Submittal1999-07-0707 July 1999 Forwards Rept of Rev 29 to Hbpp Emergency Plan,Effective 990610.Changes in Rev Do Not Decrease Effectiveness of Plan, Per 10CFR50.54(q).Plan Has Been Distributed to Region IV & Is Not Included as Part of Submittal ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address HBL-99-008, Forwards Annual Rept of Occupational Radiation Exposure for 1998. Radiation Exposure Rept Provided on Encl Diskette in Electronic Format of Reg Guide 8.7.Without Encl1999-04-30030 April 1999 Forwards Annual Rept of Occupational Radiation Exposure for 1998. Radiation Exposure Rept Provided on Encl Diskette in Electronic Format of Reg Guide 8.7.Without Encl HBL-99-003, Forwards Annual Facility Status & Survey Rept, for Jan-Dec 19981999-03-31031 March 1999 Forwards Annual Facility Status & Survey Rept, for Jan-Dec 1998 HBL-99-006, Forwards Annual Radioactive Effluent Release Rept, Covering Period Jan-Dec 1998.Encl 2 Contains Revs 1 & 2 to Safstor ODCM as Required by Specification Section 4.2 of Safstor Offsite Dose Calculation Manual1999-03-31031 March 1999 Forwards Annual Radioactive Effluent Release Rept, Covering Period Jan-Dec 1998.Encl 2 Contains Revs 1 & 2 to Safstor ODCM as Required by Specification Section 4.2 of Safstor Offsite Dose Calculation Manual DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot HBL-98-021, Forwards Rept Change (Rev 28) to Hbpp Emergency Plan, Effective 981126.Updated Emergency Plan,Not Included as Part of Submittal1998-12-18018 December 1998 Forwards Rept Change (Rev 28) to Hbpp Emergency Plan, Effective 981126.Updated Emergency Plan,Not Included as Part of Submittal HBL-98-013, Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for Jan-Dec 1997. Encl Annual Rept Provides Brief Description of 10CFR50.59 Facility Design Changes, Including Summary of Each SE1998-11-10010 November 1998 Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for Jan-Dec 1997. Encl Annual Rept Provides Brief Description of 10CFR50.59 Facility Design Changes, Including Summary of Each SE DCL-98-123, Submits Listed Address Changes for NRC Service Lists for Listed Individuals1998-09-0909 September 1998 Submits Listed Address Changes for NRC Service Lists for Listed Individuals HBL-98-015, Forwards Rev 2 to DSAR for Humboldt Bay Power Plant,Unit 3, to Comply W/Decommissioning Rule.Dsar Was Formerly Known as Safstor Decommissioning Plan.Encl 1 Identifies & Describes Rept Changes1998-08-28028 August 1998 Forwards Rev 2 to DSAR for Humboldt Bay Power Plant,Unit 3, to Comply W/Decommissioning Rule.Dsar Was Formerly Known as Safstor Decommissioning Plan.Encl 1 Identifies & Describes Rept Changes DCL-98-108, Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year..1998-08-0707 August 1998 Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year.. HBL-98-009, Submits Info Describing site-specifc Decommissioning Cost Estimates1998-08-0505 August 1998 Submits Info Describing site-specifc Decommissioning Cost Estimates ML20236G0691998-06-19019 June 1998 Forwards Endorsement 123 to Neila Policy NF-228,Endorsement 145 to Neila Policy NF-113,Endorsement 124 to Neila Policy NF-228 & Endorsement 89 to Maelu Policy MF-103 L-98-027, Forwards Rev 8 to Physical Security Plan.Encl 1 Identifies & Describes Plan Changes,Which Indicated W/Rev Bars in Left Margin of Physical Security Plan.Rev Withheld,Per 10CFR2.790(d)1998-06-11011 June 1998 Forwards Rev 8 to Physical Security Plan.Encl 1 Identifies & Describes Plan Changes,Which Indicated W/Rev Bars in Left Margin of Physical Security Plan.Rev Withheld,Per 10CFR2.790(d) HBL-98-011, Forwards Rept of Rev 27 to Hbpp Emergency Plan,Effective 980507,per 10CFR50.4 & 10CFR50.54(q).Updated Plan Has Already Been Distributed to NRC Region IV IAW Hbpp Procedures.W/O Rept1998-06-0404 June 1998 Forwards Rept of Rev 27 to Hbpp Emergency Plan,Effective 980507,per 10CFR50.4 & 10CFR50.54(q).Updated Plan Has Already Been Distributed to NRC Region IV IAW Hbpp Procedures.W/O Rept ML20247L3571998-05-18018 May 1998 Clarifies Remark Re Discharge Through Existing Ventilation Stack to Avoid Confusion.Remark Was in Response to Question Re Purpose of Dismantlement & Replacement of Existing Ventilation Stack ML20217H1161998-04-21021 April 1998 Forwards Annual Rept of Occupational Radiation Exposure, for Employees & Visitors Monitored at Humboldt Bay Power Plant During CY97.Rept on Diskette.W/O Encl HBL-98-006, Forwards Annual Facility Status & Survey Rept for 1997. Section a Addresses Facility Status & Section B Presents Results of Monitoring Performed for Radiological Environ Monitoring Program1998-03-31031 March 1998 Forwards Annual Facility Status & Survey Rept for 1997. Section a Addresses Facility Status & Section B Presents Results of Monitoring Performed for Radiological Environ Monitoring Program HBL-98-008, Forwards Annual Radioactive Effluent Release Rept for 970101-1231. Rept Contains Comparison of Max Calculated Dose to Individual Members of Public W/Numerical Guidelines of 10CFR50 App I1998-03-31031 March 1998 Forwards Annual Radioactive Effluent Release Rept for 970101-1231. Rept Contains Comparison of Max Calculated Dose to Individual Members of Public W/Numerical Guidelines of 10CFR50 App I HBL-98-003, Forwards Corrected TSs Re LAR 96-02,in Entirety W/ Affected Pages Retyped1998-03-13013 March 1998 Forwards Corrected TSs Re LAR 96-02,in Entirety W/ Affected Pages Retyped HBL-98-002, Submits Updated Post-Shutdown Decommissioning Activities Rept for Humboldt Bay Power Plant,Unit 3. Safstor Decommissioning Plan Will Be Considered FSAR for Hbpp1998-02-27027 February 1998 Submits Updated Post-Shutdown Decommissioning Activities Rept for Humboldt Bay Power Plant,Unit 3. Safstor Decommissioning Plan Will Be Considered FSAR for Hbpp HBL-98-001, Informs That Existing Hbpp PM Program Adequately Meets Requirements of Maint Rule.Summary of Program & Basis for Determining Maint Rule Compliance at Plant,Encl1998-01-26026 January 1998 Informs That Existing Hbpp PM Program Adequately Meets Requirements of Maint Rule.Summary of Program & Basis for Determining Maint Rule Compliance at Plant,Encl HBL-97-016, Responds to NRC Re Violations Noted in Insp Rept 50-133/97-02.Corrective Actions:Correctly Reset Process Water Monitor Warning High & Low Alarms & re-educated All Operators on Proper Method to Set Process Water Monitor1997-10-27027 October 1997 Responds to NRC Re Violations Noted in Insp Rept 50-133/97-02.Corrective Actions:Correctly Reset Process Water Monitor Warning High & Low Alarms & re-educated All Operators on Proper Method to Set Process Water Monitor HBL-97-012, Forwards Rept of Rev 26 to Plant Emergency Plan,Effective 970801.Changes Do Not Decrease Effectiveness of Plan1997-08-28028 August 1997 Forwards Rept of Rev 26 to Plant Emergency Plan,Effective 970801.Changes Do Not Decrease Effectiveness of Plan ML20210H4671997-08-0202 August 1997 Requests That NRC Suspend Investigation & Review of Issues Raised by Modesto Irrigation District & Transmission Agency of Northern CA Re Contention That PG&E Had Violated Nuclear License Conditions Known as Stanislaus Commitments HBL-97-009, Provides Addl Justification to Support TS Change Request Contained in LAR 96-02 ,re Establishment of Radiological Effluents Control Program & in Response to 970416 Telcon1997-06-12012 June 1997 Provides Addl Justification to Support TS Change Request Contained in LAR 96-02 ,re Establishment of Radiological Effluents Control Program & in Response to 970416 Telcon L-97-035, Forwards Info Re Changes to Humboldt Bay Power Plant,Unit 3 Physical Security Plan.Changes Do Not Decrease Safeguards Effectiveness of Plan & Are Submitted Per 10CFR50.54(p). Encls Withheld Per 10CFR2.790(d)1997-04-0909 April 1997 Forwards Info Re Changes to Humboldt Bay Power Plant,Unit 3 Physical Security Plan.Changes Do Not Decrease Safeguards Effectiveness of Plan & Are Submitted Per 10CFR50.54(p). Encls Withheld Per 10CFR2.790(d) L-97-033, Confirms Final Disposition of Specific Hazardous Wastes Shipped to IT Corp Panoche & Vine Hill Facilities from Plant in Jul 19861997-04-0202 April 1997 Confirms Final Disposition of Specific Hazardous Wastes Shipped to IT Corp Panoche & Vine Hill Facilities from Plant in Jul 1986 HBL-97-003, Documents Utils Understanding of Results in Discussions from Meeting W/Nrc Personnel to Discuss Application of New Decommissioning Rule to Hbpp1997-02-20020 February 1997 Documents Utils Understanding of Results in Discussions from Meeting W/Nrc Personnel to Discuss Application of New Decommissioning Rule to Hbpp HBL-97-001, Submits Annual Rept of Changes,Tests & Experiments for Humboldt Bay Power Plant,Unit 3 for Reporting Interval Jan-Dec 19951997-01-28028 January 1997 Submits Annual Rept of Changes,Tests & Experiments for Humboldt Bay Power Plant,Unit 3 for Reporting Interval Jan-Dec 1995 ML20133F8961997-01-0909 January 1997 Responds to NRC Ltr of 961206 Received on 961210 Which Requested Further Info Re Utils Violations of Conditions of Its Nuclear Licenses Designated to Promote & Protect Competition in Bulk Power Market in Northern & Central CA ML20133F8721997-01-0909 January 1997 Acks & Responds to NRC Ltr of 961206 Received by Undersigned on 961210 Requesting Further Info to Document Tancs Assertion,Per Filing on 960429 That Util Has Violated Terms & Conditions of Nuclear Power Project Licenses HBL-96-027, Forwards Application for Amend to License DPR-7 to Relocate Controls & Limitations on RETS & Radiological Environmental Monitoring to ODCM & PCP1996-12-0909 December 1996 Forwards Application for Amend to License DPR-7 to Relocate Controls & Limitations on RETS & Radiological Environmental Monitoring to ODCM & PCP HBL-93-060, Forwards Rev 6 to Pacific Gas & Electric Co Humboldt Bay Plant Unit 3 - Safstor QA Plan1993-10-14014 October 1993 Forwards Rev 6 to Pacific Gas & Electric Co Humboldt Bay Plant Unit 3 - Safstor QA Plan ML20057F7271993-10-0808 October 1993 Forwards LAR 93-02,revising TS Section II, Site, Section V, Monitoring Sys & Section VII, Administrative Controls ML20059C4221993-09-0808 September 1993 Forwards Humboldt Bay Power Plant Updated Newsletter Sent to People Living within Ten Miles of Power Plant During Sept 1993 HBL-93-050, Forwards Rev 3 to Emergency Plan to Include Local Ltrs of Agreements W/Local Hosps,Humboldt County Fire Depts & Local Ambulance Svcs.Informs That Because Plan Incorporated Into Hbpp Plant Manuals,Vol 3,Rev 21 Appears at Top of Each Page1993-08-17017 August 1993 Forwards Rev 3 to Emergency Plan to Include Local Ltrs of Agreements W/Local Hosps,Humboldt County Fire Depts & Local Ambulance Svcs.Informs That Because Plan Incorporated Into Hbpp Plant Manuals,Vol 3,Rev 21 Appears at Top of Each Page HBL-93-005, Forwards Public Version of Rev 2 to Emergency Plan.Vol 3,Rev 20 Appears at Top of Each Page of Rev to Reflect Incorporation of Emergency Plan Into Hbpp Plant Manuals & Current Sys for Maint of Manuals.W/930202 Release Memo1993-01-19019 January 1993 Forwards Public Version of Rev 2 to Emergency Plan.Vol 3,Rev 20 Appears at Top of Each Page of Rev to Reflect Incorporation of Emergency Plan Into Hbpp Plant Manuals & Current Sys for Maint of Manuals.W/930202 Release Memo HBL-90-038, Forwards Decommissioning Financial Assurance Certification Rept,Per 10CFR50.751990-07-24024 July 1990 Forwards Decommissioning Financial Assurance Certification Rept,Per 10CFR50.75 HBL-90-036, Forwards Replacement Page 13-1,further Revising Section 13.2 of 880826 Rev 2 to Physical Security Plan.Rev Adds Specific Source Ref to Commitment Document & Retention of security- Related Documents.Encl Withheld (Ref 10CFR73.21)1990-07-17017 July 1990 Forwards Replacement Page 13-1,further Revising Section 13.2 of 880826 Rev 2 to Physical Security Plan.Rev Adds Specific Source Ref to Commitment Document & Retention of security- Related Documents.Encl Withheld (Ref 10CFR73.21) HBL-89-041, Responds to NRC Re Violations Noted in Insp Rept 50-133/89-02.Corrective Action:High Level Vault Containing Drums of Waste Immediately Posted as High Radiation Area1989-09-11011 September 1989 Responds to NRC Re Violations Noted in Insp Rept 50-133/89-02.Corrective Action:High Level Vault Containing Drums of Waste Immediately Posted as High Radiation Area ML20246E6061989-08-16016 August 1989 Forwards Endorsements 10 & 11 to Nelia Certificate N-74 & Maelu Certificate M-74 & Endorsements 7 & 8 to Nelia Certificate N-76 & Maelu Certificate M-76,respectively DCL-89-201, Discusses Notification to NRC Re Employees Potential Safety Issues,Per NRC .Licensee Sent Clarifying Ltrs to Employees Stating That Employees Free to Contact NRC of Any Safety Concerns W/O Fear of Retribution in Any Form1989-07-28028 July 1989 Discusses Notification to NRC Re Employees Potential Safety Issues,Per NRC .Licensee Sent Clarifying Ltrs to Employees Stating That Employees Free to Contact NRC of Any Safety Concerns W/O Fear of Retribution in Any Form ML20244B9261989-06-14014 June 1989 Submits Certificate of Insurance for Plant,Certifying That Insurance Has Been Effected W/Nuclear Mutual Ltd.Policy Term Is 890401-900401 ML20246J7051989-06-0909 June 1989 Forwards Application for Exemption from Requirements of 10CFR50.54(W) Filed Per 10CFR50.12(a).Application Relates to Utils Request for Reduction in on-site Property Damage Insurance from Current $100,000 to $63,160,000 DCL-89-149, Requests Renewal of Approval of QA Programs for Radioactive Matl Packages1989-05-30030 May 1989 Requests Renewal of Approval of QA Programs for Radioactive Matl Packages ML20244B4881989-04-0707 April 1989 Forwards Endorsement 35 to Maelu Policy MF-103 & Endorsements 65 & 116 to Nelia Policies NF-228 & NF-113, Respectively 1999-08-27
[Table view] Category:UTILITY TO NRC
MONTHYEARHBL-90-038, Forwards Decommissioning Financial Assurance Certification Rept,Per 10CFR50.751990-07-24024 July 1990 Forwards Decommissioning Financial Assurance Certification Rept,Per 10CFR50.75 HBL-90-036, Forwards Replacement Page 13-1,further Revising Section 13.2 of 880826 Rev 2 to Physical Security Plan.Rev Adds Specific Source Ref to Commitment Document & Retention of security- Related Documents.Encl Withheld (Ref 10CFR73.21)1990-07-17017 July 1990 Forwards Replacement Page 13-1,further Revising Section 13.2 of 880826 Rev 2 to Physical Security Plan.Rev Adds Specific Source Ref to Commitment Document & Retention of security- Related Documents.Encl Withheld (Ref 10CFR73.21) HBL-89-041, Responds to NRC Re Violations Noted in Insp Rept 50-133/89-02.Corrective Action:High Level Vault Containing Drums of Waste Immediately Posted as High Radiation Area1989-09-11011 September 1989 Responds to NRC Re Violations Noted in Insp Rept 50-133/89-02.Corrective Action:High Level Vault Containing Drums of Waste Immediately Posted as High Radiation Area ML20246E6061989-08-16016 August 1989 Forwards Endorsements 10 & 11 to Nelia Certificate N-74 & Maelu Certificate M-74 & Endorsements 7 & 8 to Nelia Certificate N-76 & Maelu Certificate M-76,respectively DCL-89-201, Discusses Notification to NRC Re Employees Potential Safety Issues,Per NRC .Licensee Sent Clarifying Ltrs to Employees Stating That Employees Free to Contact NRC of Any Safety Concerns W/O Fear of Retribution in Any Form1989-07-28028 July 1989 Discusses Notification to NRC Re Employees Potential Safety Issues,Per NRC .Licensee Sent Clarifying Ltrs to Employees Stating That Employees Free to Contact NRC of Any Safety Concerns W/O Fear of Retribution in Any Form ML20246J7051989-06-0909 June 1989 Forwards Application for Exemption from Requirements of 10CFR50.54(W) Filed Per 10CFR50.12(a).Application Relates to Utils Request for Reduction in on-site Property Damage Insurance from Current $100,000 to $63,160,000 DCL-89-149, Requests Renewal of Approval of QA Programs for Radioactive Matl Packages1989-05-30030 May 1989 Requests Renewal of Approval of QA Programs for Radioactive Matl Packages ML20244B4881989-04-0707 April 1989 Forwards Endorsement 35 to Maelu Policy MF-103 & Endorsements 65 & 116 to Nelia Policies NF-228 & NF-113, Respectively ML20235J2191989-02-17017 February 1989 Forwards Endorsements,Including Endorsement 3 to Nelia Certificate NW-132,Endorsement 3 to Maelu Certificate MW-73, Endorsement 4 to Nelia Certificate NW-51 & Endorsement 4 to Maelu Certificate MW-135 HBL-88-077, Requests Exemption from Provisions of 10CFR70.51(d) Re Annual Physical Inventory of Spent Fuel.Conducting Physical Inventory Not Necessary to Achieve Underlying Purpose of Rule.Performance of Annual Inventory Satisfies Requirement1988-09-13013 September 1988 Requests Exemption from Provisions of 10CFR70.51(d) Re Annual Physical Inventory of Spent Fuel.Conducting Physical Inventory Not Necessary to Achieve Underlying Purpose of Rule.Performance of Annual Inventory Satisfies Requirement HBL-88-074, Forwards Changes to Rev 2 to Physical Security Plan.Info Withheld (Ref 10CFR73.21)1988-08-26026 August 1988 Forwards Changes to Rev 2 to Physical Security Plan.Info Withheld (Ref 10CFR73.21) HBL-88-066, Forwards Addl Info Re Use of Security Seals on Spent Fuel Storage Pool,Per1988-07-19019 July 1988 Forwards Addl Info Re Use of Security Seals on Spent Fuel Storage Pool,Per HBL-88-055, Requests NRC Concurrence to Utilize Security Seals on Spent Fuel Storage Pool at Plant.Use of Seals Will Simplify Annual Physical Inventory of Spent Fuel Stored in Pool & Minimize Radiation Exposures to Workers & Contamination1988-06-0606 June 1988 Requests NRC Concurrence to Utilize Security Seals on Spent Fuel Storage Pool at Plant.Use of Seals Will Simplify Annual Physical Inventory of Spent Fuel Stored in Pool & Minimize Radiation Exposures to Workers & Contamination ML20154L3411988-05-23023 May 1988 Forwards Replacement Pages for Proposed Safstor Tech Specs, Rev 0,per 880505 Discussions W/Nrc DCL-88-100, Forwards Rev 4 to Humboldt Bay Power Plant Unit 3 Safstor QA Plan. Revs Listed1988-04-21021 April 1988 Forwards Rev 4 to Humboldt Bay Power Plant Unit 3 Safstor QA Plan. Revs Listed HBL-88-026, Forwards Edited Rev 3 to Proposed Safstor Tech Specs, Initially Transmitted on 871116,for NRC Approval & Issuance as Rev 0.Ack of Receipt Requested1988-03-16016 March 1988 Forwards Edited Rev 3 to Proposed Safstor Tech Specs, Initially Transmitted on 871116,for NRC Approval & Issuance as Rev 0.Ack of Receipt Requested HBL-87-066, Forwards Rev 3 to Proposed Tech Specs for Safstor.Revs Reflect Util 870821 Response to NRC Request for Addl Info1987-11-16016 November 1987 Forwards Rev 3 to Proposed Tech Specs for Safstor.Revs Reflect Util 870821 Response to NRC Request for Addl Info ML20236H9691987-10-26026 October 1987 Forwards Endorsement 25 to Maelu Policy MF-103 & Endorsement 55 to Nelia Policy NF-228 HBL-87-054, Forwards Repts Entitled Radioactive Effluent Releases & Waste Disposal from Humboldt Bay Power Plant Unit 3 for Jan-June 1987 & Environ Radiation Study in Vicinity of Humboldt Bay Power Plant,Annual Rept 19861987-08-28028 August 1987 Forwards Repts Entitled Radioactive Effluent Releases & Waste Disposal from Humboldt Bay Power Plant Unit 3 for Jan-June 1987 & Environ Radiation Study in Vicinity of Humboldt Bay Power Plant,Annual Rept 1986 HBL-87-052, Forwards Responses to NRC 870723 Request for Addl Info Re Safstor Tech Specs.Revised Set of Tech Specs Will Be Submitted After NRC Review of Responses1987-08-21021 August 1987 Forwards Responses to NRC 870723 Request for Addl Info Re Safstor Tech Specs.Revised Set of Tech Specs Will Be Submitted After NRC Review of Responses HBL-87-051, Forwards Rev 2 to Physical Security Plan & Changes.Changes Do Not Decrease Effectiveness of Plan & Submitted Per 10CFR50.54(p).Plan & Changes Withheld (Ref 10CFR73.21)1987-08-18018 August 1987 Forwards Rev 2 to Physical Security Plan & Changes.Changes Do Not Decrease Effectiveness of Plan & Submitted Per 10CFR50.54(p).Plan & Changes Withheld (Ref 10CFR73.21) HBL-87-047, Forwards Rev 3 to Custodial Safstor Facility QA Plan.Changes Include Clarification of Sections Re Packaging & Transportation,Fire Rating of Storage Containers,Audit Frequency & Ref to Reg Guide1987-07-30030 July 1987 Forwards Rev 3 to Custodial Safstor Facility QA Plan.Changes Include Clarification of Sections Re Packaging & Transportation,Fire Rating of Storage Containers,Audit Frequency & Ref to Reg Guide HBL-87-020, Forwards Change Pages for Rev 1 to Facility Physical Security Plan to More Accurately Describe Certain Provisions of Plan.Encl Withheld (Ref 10CFR73.21)1987-04-30030 April 1987 Forwards Change Pages for Rev 1 to Facility Physical Security Plan to More Accurately Describe Certain Provisions of Plan.Encl Withheld (Ref 10CFR73.21) HBL-87-015, Forwards Proposed Rev 2 to Safstor Tech Specs.Rev Includes Changes to Chemistry Limits on Spent Fuel Storage Pool & Requirements for Surveillance Program for Boral Matl of Spent Fuel Assembly Containers1987-03-20020 March 1987 Forwards Proposed Rev 2 to Safstor Tech Specs.Rev Includes Changes to Chemistry Limits on Spent Fuel Storage Pool & Requirements for Surveillance Program for Boral Matl of Spent Fuel Assembly Containers ML20207R4571987-03-13013 March 1987 Forwards Endorsements 52 & 110 to Nelia Policies NF-228 & NF-113,respectively HBL-87-006, Forwards Public Version of Rev 7 to Corporate Emergency Response Plan Implementing Procedure 3.2, Corporate Communications Dept & County of Humboldt Contingency Plan, Nuclear Reactor,Humboldt Bay. W/870310 Release Memo1987-02-26026 February 1987 Forwards Public Version of Rev 7 to Corporate Emergency Response Plan Implementing Procedure 3.2, Corporate Communications Dept & County of Humboldt Contingency Plan, Nuclear Reactor,Humboldt Bay. W/870310 Release Memo HBL-87-002, Forwards Response to 861230 Request for Addl Info on Emergency Plan Supporting Util Proposed Safstor Decommissioning Plan1987-01-20020 January 1987 Forwards Response to 861230 Request for Addl Info on Emergency Plan Supporting Util Proposed Safstor Decommissioning Plan DCL-87-006, Requests That Technical Correspondence Be Addressed to Author at Listed Address,Per Encl .Encl NRC Re Results of Peebles Electrical Machines Insp Mistakenly Addressed to Jo Schuyler1987-01-12012 January 1987 Requests That Technical Correspondence Be Addressed to Author at Listed Address,Per Encl .Encl NRC Re Results of Peebles Electrical Machines Insp Mistakenly Addressed to Jo Schuyler HBL-86-039, Forwards Rev 1 to Proposed Physical Security Plan,Based on Discussions W/Nrc & Description of Changes.Encls Withheld (Ref 10CFR73.21)1986-11-17017 November 1986 Forwards Rev 1 to Proposed Physical Security Plan,Based on Discussions W/Nrc & Description of Changes.Encls Withheld (Ref 10CFR73.21) HBL-86-035, Forwards Alternatives & Issues for Extended Storage of Spent Nuclear Fuel from Humboldt Bay Power Plant,Unit 3 & Extended Fuel Storage in Existing Onsite Humboldt Bay Unit 3 Storage Pool. Ack of Receipt Requested1986-10-29029 October 1986 Forwards Alternatives & Issues for Extended Storage of Spent Nuclear Fuel from Humboldt Bay Power Plant,Unit 3 & Extended Fuel Storage in Existing Onsite Humboldt Bay Unit 3 Storage Pool. Ack of Receipt Requested HBL-86-032, Forwards PG&E Responses to Public Comments on Des for Decommissioning Humboldt Bay Unit 3. Ack Receipt of Matl on Encl Ltr Requested1986-10-20020 October 1986 Forwards PG&E Responses to Public Comments on Des for Decommissioning Humboldt Bay Unit 3. Ack Receipt of Matl on Encl Ltr Requested HBL-86-029, Notifies That No Operator Licensing Exams Planned for Facility,As Util in Process of Decommissioning & Placing Unit in Safstor Mode for long-term Storage,Per Generic Ltr 86-14.Related Correspondence1986-09-24024 September 1986 Notifies That No Operator Licensing Exams Planned for Facility,As Util in Process of Decommissioning & Placing Unit in Safstor Mode for long-term Storage,Per Generic Ltr 86-14.Related Correspondence HBL-86-027, Forwards Radioactive Effluent Releases & Waste Disposal, Jan-June 1986 & Environ Radiation Study in Vicinity of Humboldt Bay Power Plant,Eureka,Ca,Annual Rept 19851986-08-28028 August 1986 Forwards Radioactive Effluent Releases & Waste Disposal, Jan-June 1986 & Environ Radiation Study in Vicinity of Humboldt Bay Power Plant,Eureka,Ca,Annual Rept 1985 HBL-86-026, Forwards Comments on Des for Decommissioning of Humboldt Bay Power Plant,Unit 3.Fission Chamber Strings Cut Up to Separate Chambers & Minimize Stored Waste Vol1986-08-14014 August 1986 Forwards Comments on Des for Decommissioning of Humboldt Bay Power Plant,Unit 3.Fission Chamber Strings Cut Up to Separate Chambers & Minimize Stored Waste Vol DCL-86-186, Informs of Reorganization & Reinstatement of Util Onsite Project Engineering Group.Changes Listed1986-06-30030 June 1986 Informs of Reorganization & Reinstatement of Util Onsite Project Engineering Group.Changes Listed HBL-86-023, Requests Approval for Offsite Disposal of Listed Very Low Radwastes as Produced,W/O Individual Authorization.Util Will Sample Wastes & Monitor Radioactivity Per NRC Approved 831027 & 840407 Transmittals.Fee Paid1986-06-17017 June 1986 Requests Approval for Offsite Disposal of Listed Very Low Radwastes as Produced,W/O Individual Authorization.Util Will Sample Wastes & Monitor Radioactivity Per NRC Approved 831027 & 840407 Transmittals.Fee Paid ML20211B9971986-06-0202 June 1986 Forwards Endorsement 108 to Nelia Policy NF-113 HBL-86-019, Forwards Rev 2 to Safstor QA Plan. Section 2.0 Revised to Reflect Applicable Organization Changes,Section 3.1.3, Insps Added to Describe Applicable Insp Requirements & Section 3.1.4, Nonconformance Control Revised1986-05-23023 May 1986 Forwards Rev 2 to Safstor QA Plan. Section 2.0 Revised to Reflect Applicable Organization Changes,Section 3.1.3, Insps Added to Describe Applicable Insp Requirements & Section 3.1.4, Nonconformance Control Revised HBL-86-020, Forwards Errata to 860313 Rev 1 to Proposed Safstor Tech Specs,Including Revised Figure VII-1, Offsite Organization Chart & Page VII-101986-05-23023 May 1986 Forwards Errata to 860313 Rev 1 to Proposed Safstor Tech Specs,Including Revised Figure VII-1, Offsite Organization Chart & Page VII-10 ML20198B9061986-05-16016 May 1986 Forwards Application to Amend License DPR-7,consisting of License Amend Request 86-02,upgrading Stack Gas Monitoring Sys & Reducing Number of Condensate Demineralizer Beds.Fee Paid HBL-86-018, Suppls 840730 Decommissioning Amend Request for License DPR-7 to Perform Mods Re Upgrading Spent Fuel Storage Pool, Pool Cover & Redundant Level Monitors & Replacing Stack Monitor to Reflect possession-only Status1986-05-16016 May 1986 Suppls 840730 Decommissioning Amend Request for License DPR-7 to Perform Mods Re Upgrading Spent Fuel Storage Pool, Pool Cover & Redundant Level Monitors & Replacing Stack Monitor to Reflect possession-only Status ML20205P0711986-05-14014 May 1986 Forwards License Amend Request 86-01 to License DPR-7, Modifying Security Plan to Reflect possession-only Status of Plant.Security Plan Supporting Decommissioning & Safstor Withdrawn.Fee Paid ML20210L3051986-04-15015 April 1986 Forwards Endorsements 48 & 107 to Nelia Policies NF-228 & NF-113,respectively & Endorsement 19 to Maelu Policy MF-103 HBL-86-006, Forwards Rev 1 to Safstor QA Program & Description of Rev1986-03-14014 March 1986 Forwards Rev 1 to Safstor QA Program & Description of Rev HBL-86-005, Forwards Rev 1 to Tech Specs for Decommissioning of Humboldt Bay Power Plant Unit 3. Rev Incorporates Util Commitments in Response to Questions During NRC Review of Decommissioning Plan1986-03-13013 March 1986 Forwards Rev 1 to Tech Specs for Decommissioning of Humboldt Bay Power Plant Unit 3. Rev Incorporates Util Commitments in Response to Questions During NRC Review of Decommissioning Plan HBL-86-004, Forwards No Significant Hazards Determination,Per Generic Ltr 86-03,supporting 831216 License Amend Request LAR 83-01, Amending License DPR-7 to Delete Requirements of Item E.2e of 760521 Order for Mod of License Re Seismic Network1986-03-0707 March 1986 Forwards No Significant Hazards Determination,Per Generic Ltr 86-03,supporting 831216 License Amend Request LAR 83-01, Amending License DPR-7 to Delete Requirements of Item E.2e of 760521 Order for Mod of License Re Seismic Network ML20140E7281986-01-23023 January 1986 Forwards Endorsement 106 to Nelia Policy NF-113 HBL-85-061, Submits Rept Re Investigation of Radwaste Shipments for Which Notification of Receipt Not Received within 20 Days After Transfer.Formal Notification of Receipt of 851118 & 19 Shipments Received on 851211 & 10,respectively1985-12-20020 December 1985 Submits Rept Re Investigation of Radwaste Shipments for Which Notification of Receipt Not Received within 20 Days After Transfer.Formal Notification of Receipt of 851118 & 19 Shipments Received on 851211 & 10,respectively HBL-85-059, Forwards Rev 1 to Humboldt Bay Power Plant Unit 3 - Safstor QA Plan, Replacing Attachment 4 of 840731 Decommissioning Plan.Basis for & Description of Approach Included1985-12-13013 December 1985 Forwards Rev 1 to Humboldt Bay Power Plant Unit 3 - Safstor QA Plan, Replacing Attachment 4 of 840731 Decommissioning Plan.Basis for & Description of Approach Included HBL-85-058, Cancels 851203 & 10 Advance Notifications of Nuclear Waste Shipment.Advance Notification Not Needed Since Quantity of Radioactive Matl Contained in Shipment Does Not Exceed Quantities Listed in 10CFR71.97(b)(3)1985-12-12012 December 1985 Cancels 851203 & 10 Advance Notifications of Nuclear Waste Shipment.Advance Notification Not Needed Since Quantity of Radioactive Matl Contained in Shipment Does Not Exceed Quantities Listed in 10CFR71.97(b)(3) 1990-07-24
[Table view] |
Text
g ..'
^' ' ** e
~
- s. C@PV PACIFIC GAS AND ELECTR,IC C O M PANY
, 77 OE ALE STREET. SAN FR ANCISCO. C ALIFORNI A 94106 TELEPHONE (415) 7814211 IFGwIE I P. O. 80x 7442. S AN FR ANCISCO. C ALIFORNI A 94120 TELECOPIER (415) 543 7813 nomany ontmacM v.st P.Esloser a.e state 46 ano..tv enaaLaev.v4= oevsaw 21*.0."'*kil.. U:.!*""'llIU". *..
- '* " s*II.7 ""*" :Z*ll*.!UU..
pni6iea.cnaas.sn. IO*.ldl*l'Il UTC **I.'!!==.d.. $?1" *= *.*0A*=. U".* ' *l7."*
naw=ys.6.ptaavs U*'"A '?'"Il"/" I"ER."E'**= = Wl* I EllI*I.**
d,,,g,,,,,,,,,
- . N ?l;;.!!O
- .Z'!?lt??'*"*** I * *.*a*:".
1.*,"?. ." *"I. . :l.*.".*J1.1*.**?..
C f.; ..
" Y..n.'
. u.'"""*" I.'..:.*a.t.u.,.T i.n.,.,.; ".It*...
4avnua L. niLLuaw.sn. ..O.,,.r'/1.;*gg."*i.,.,"
- g. ,fg , , , , ,. g;g,,2. , , . .,.,.,.
enaa6sa w.YnioeaLL ........... ..g.... ......... g,. .,.,. .... g, oaweaL s. eieeon ....c..... ,,,,,,,,,,
sae n P. Pa LLIN. a n.
someens.nsLLv aes.se e eses.es e .st July 1, 1982 6
'h
,s
-s -
, . .; 1
- Vb Judge Robert M. Lazo, Esq., Chairman Atomic Safety and Licensing Board
(*
.p 2 V3" U. S. Nuclear Regulatory Commission G Washington, D. C. 20555 ,
Judge David R. Schink 4 Atomic Safety and Licensing Board Department of Oceanography Texas A&M University College Station, TX 77840 Judge Gustave A. Linenberger ~
Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission Washington,.D. C. 20555 Re: Docket No. 50-133, OL DPR-7 Humboldt Bay Power Plant, Unit No. 3 Gentlemen In its Memorandum and Order (" Order") dated February 16, 1982, the Board directed PGandE to file a detailed status report with the Board starting April 1, 1982, and each three months thereafter, until final resolution of the future operation of Humboldt Bay Power Plant, Unit No. 3.
Enclosed is Pacific Gas and Electric Company's second qparterly status report, dated July 1, 1982. This report summarizes 1
the current plant status and status of PGandE's activities.
8506120185 850214 PDR FOIA SHAPLEN05--OO7 PDR w w. t-
. e
$aI
1
(:
()h)[
Judge Robert M. Lazo, et al. " July 1, 1982 In accordance with I.em 1 of the Order, PGandE will complete studies to support a decision regarding the future dis-position of the Humboldt Bay Power Plant, Unit No. 3, within six months of .the issuance by the NRC of a final reactor safety policy statement and its associated goals and guidelines.
Respectfully submitted, ROBERT OHLBACH PHILIP A. CRANE, JR.
RICHARD F. LOCKE Attorneys for Pacific Gas and Electric Company By:
Richard F. Locke cca Service List Enclosure bec: (w/ enc.)
H boldt Distribution Mr. Mr. R. H. Engelken Regional Administrator Mr. Vern Rooney Project Manager Mr. Dominic Vassallo Chief Operating Reactor Branch No. 2 4
e a ..n. . . . . .
I ,a*
l 5, *
COPY .
PACIFIC OAS AND E I.,E C T R,I C C O M PANY 77 8E ALE STREET, S AN FR ANCISCO. CALIFOR NI A 94106 TELEPHONE (415) 7814211 IPGwIE --f-- P. O. 80X 7442. S AN FR ANCISCO. C ALIFORNI A 94120 TELECOPIER (415) 543 7813 e
MOsamTCMLeaCM vitt P.Stsstat ano st.t.at apea.tv
=
EI bI?'. ! *E SI.. N
- N.IO s...IN'* 10 I.*8 cnaaLeav.vawoauaaN 101.* 'l#Ilf O N* "* 'Ea ... .- M*.1G's*lO#..- U ".* ' ?.*.'"I* l
,n 6i, a ea a= a. en.
- .'!:I. ."*t.*.*f/ * * ;* M 7.".*.*J.*... .t07* * !.*.'?JJ-.
",,,,,,,,,,,,,,, :*;1*.*a*:".
- .~.." *r! . :::.;*: *.nT*1.
- : L.p'L'..?*::'."..'.'.'.*.
eonavm.eiaeoN .~;?.?.y~g;n",
. ,. .g g,.,....** .,.,,,... ;.gg ,.3 ..,., g.7., j.,. ,,,,,,
aavnuaL.ni6L.aam.Jm. gg..,..,.,.,,, ............ ...,.....,g,...,, ;.,.,,,.,,,..,.
enaaLaa w.vnieaa66
- ..,.f,
. . . . . . . . . . . gg. .g,.g...... g .,..,.g;g;,
omuia6 s. eisaou JaCM P. Pabbim. J R.
aosanae.na6Lv July 1, 1982 c,')
m L.c.
g s,
, .- <.y Judge Robert M. Lazo, Esq., Chairman 5*
,h -j Atomic Safety and Licensing Board , ,
U. S. Nuclear Regulatory Commission
~
9 Washington, D. C. 20555 ,
c o
~#
Judge David R. Schink Atomic Safety and Licensing Board
( Department of Oceanography Texas A&M University College Station, TX 77840 Dudge Gustave A. Linenberger Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Re: Docket No. 50-133, OL DPR-7 Humboldt Bay Power Plant, Unit No. 3 Gentlemen:
In its Memorandum and Order (" Order") dated February 16, 1982, the Board directed PGandE to file a detailed status report with the Board starting April 1, 1982, and each three months thereafter, until final resolution of the future operation of Humboldt Bay Power Plant, Unit No. 3.
Enclosed is Pacific Gas and Electric Company's second .
quarterly status report, dated July 1, 1982. This report summarizes the current plant status and status of PGandE's activities.
g l
6 ft 6..
_ . = . _ _ _ . . . . . . . . . .. . . . .
.* 7
.Q . . .
COPY
'~
Judge Robert M. Lazo, et al. ' July 1, 1982 In accordance.with Item 1 of the Order, PGandE will complete studies to support a decision regarding the future dis-position of the Humboldt Bay Power Plant, Unit No. 3, within six months of.the issuance by the NRC of a final reactor safety policy statement and its associated goals and guidelines.
Respectfully submitted, ROBERT OHLBACH PHILIP A. CPANE, JR.
RICHARD F. LOCKE Attorneys for Pacific Gas and Electric Company By:
Richard F. Locke cc: Service List Enclosure
[
\
bec:
H (w/ enc.)
boldt Distribution Mr. Mr. R. H. Engelken Regional Administrator Mr. Vern Rooney Project Manager Mr. Dominic Vassallo Chidf Operating Reactor Branch No. 2 t
(
.- '- ~ - . . . .. . . . . . ... .. . . . . . . . . . .
.. 1 COPY s .
PACIFIC GAS AND ELECTRIC COMPANY l
HUMBOLDT BAY POWER PLANT, UNIT NO. 3 1
)
Quarterly Status Report 1
. July 1, 1982 .
Since PGandE's last status report dated March 31, 1982, activities on Humboldt Bay, Unit 3, can be broken down into five items. The activities on each of these items are discussed below:
- 1. Plant Operational Status Humboldt Bay Unit 3 continues to be maintained in a cold shutdown condition. The reactor coolant system is filled with reactor coolant but depressurized.
The reactor vessel head and shield plug are in place. The reactor core is loaded with 184 fuel assemblies, 44 of which are new fuel assemblies.
In the spent fuel pool, 250 spent fuel assemblies continue to be stored. There are 236 empty spaces, remaining in the spent fuel pool.
Reactor control rods are fully inserted. The
(.'
control rod drive system is de-energized and cannot be re-energized without the knowledge and consent of the shift foreman. In addition, the control rod hydraulic system is depressurized.
This system would need to be filled and vented before control rods could be withdrawn. The emergency boration system, reactor clean up system, liquid radwaste processing system, refueling building ventilation system, nuclear instrumenta-tion, and radiation monitoring systems are all maintained operational.
Surveillance testing is performed as required by the Technical Specifications. Fire protection, radiation protection, material accountability, radioactive waste management, training and quality assurance programs are being implemented and are audited by NRC's Region V inspectors.
PGandE has continued to comply with the shift manning requirements for the shutdown mode in -
- . accordance with the Humboldt Bay Technical Speci-t fications. The current numbers of licensed operating personnel available to cover four shif ts-( are the following- ,
e
-._WS# e SS D sp+ + 6 , e e & _
C*..' * *-
- a. 5 Senior Operator Licensees, SOL (4 i Shift Foremen, 1 Relief Shift Supervisor).
f b. 9 Operator Licensees, OL (4 Control Operators, 4 Senior Control Operators, Operators, 4 Senior Control Operators, 1 Senior ~ Control Operator in Training for a SOL).
- c. 4 management personnel at the plant who hold a current SOL to supplement the operating staff if needed.
PGandE has continued to fully comply with the latest (Revision 2) Humboldt Bay Pcwer Plant i Security Plan dated November 16, 1976. This security plan has been approved by the NRC Staff '
as being adequate. Any further changes in the Plant Security Plan will be submitted to the NRC Staff in accordance with current regulations.
Reports regarding Unit 3 are routinely submitted to the NRC as required by the license and other regulations. These include: Monthly Operating
~( Status Reports; Radioactive Effluent Release and Waste Disposal Reports, and Licensee Event Reports, if required.
Scheduled and unscheduled inspections of the plant have been conducted by the NRC's Inspection and Enforcement Region V Inspectors. Any violations and/or deviations have been resolved to the satis-faction of the NRC Staff.
No revisions or modifications in the Humboldt Bay Unit 3 design or operation have been made that would bear upon the bases on which the NRC Staff concluded that the plant, in its present shutdown condition, poses no risk to the health and safety of the public.
- 2. Plant Improvements PGandE has commenced activities that will result in the construction of a new low level radwaste storage building on the Humboldt Bay Power Plant .
~
site. When complete, the new building will provide !
'a weather protected radioactive waste storage and handling area. The building has been designed to meet all applicable NRC requirements. The building 4 -
design has been completed and a local building permit obtained. Construction was started in early June 1982.
L . "- . . . . . _ . . .. . . ._
u, .
- 7. . . . copy
- 3. Monitoring of the NRC's Safety Goal Rulemaking As noted in the Order, the NRC has published for comment a, proposed policy statement on safety goals for nuclear power plants. A report dis- =
. cussing the development of the proposed policy ['
statement has been published separately as NUREG- r 0880, Safety Goals for Nuclear Power Plants: A -
I!iscushion Paper. FuB11e comments were due by May 18, 1982. PGandE assumes that the NRC will evaluate the public comments received and issue F final policy recommendations later this year. h i
- 4. Review of New NRC Requirements for Operating Nuclear Plants F l
PGandE is continuing to review NRC promulgated information such as I&E Circulars, Bulletins, Information Notices, NUREGs, and the Federal Register notices for regulations and guidance ,
applicable to the Humboldt Bay plant in its current E cold shutdown status. PGandE's review also considers =
the potential for significant safety problems associated with the plant for all other operational
{
, modes and considers those actions which are necessary 4 to comply with the intent of NRC requirements.
Those applicable requirements which are not immediately acted upon are placed on a list of work items that must be satisfactorily resolved prior to restart
- of Unit 3.
5.
=
Evaluation of Steam Plant Conversion Alternatives PGandE is continuing its evaluation of various fossil fired steam system conversion alternatives.
(r The conversion alternatives presume the decommissioning i of the r.. clear portion of Unit 3 while retaining E the powe'r generation portion of the plant available ,
for continued use with a new steam supply source. !
=
The alternative steam supply systems being evaluated E c
in'lude: a coal fired boiler; an oil / natural gas i fired boiler; a biomass (wood chip) fired boiler; g and a combined cycle waste heat boiler. The =-
evaluations focus on engineering feasibility and ["
trade-offs, fuel supply and transportation, pollution y
. control requirements, cycle efficiencies, waste n
( management, permit requirements, PGandE generation 1 and transmission requirements, equipment capital g
( ,
costs, and operation and maintenance costs.
{
=
/
k
=
- ' - W-
. . . . . . ..m... .
R
0 l i..+- .
e .
g UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION I \
l In the Matter of I
)
)
PACIFIC GAS AND ELECTRIC COMPANY ) Docket No.,50-133
) License No. DPR-7 (Humboldt Bay Power Plant, Unit No. 3) )
)
CERTIFICATE OF SERVICE The foregoing document of Pacific Gas and Electric Company has been served today on the following by deposit in the United States mail, properly stamped and addressed:
Linda J. Brown, Esq. Robert M. Lazo, Esq., Chairman 100 Van Ness Avenue, 19th Floor Atomic Safety and Licensing San Francisco, CA 94102 Board Panel U.S. Nuclear Regulatory Commission Mitzi Young, Esq. Washington, D.C. 20555 Office of Executive Legal
. Director Mr. Gustave A. Linenberger, Member BETH 042 Atomic Safety and Licensing
. k.
I U.S. Nuclear Regulatory Board Panel Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Washington, D.C. 20555 Secretary Dr. David R. Schink U.S. Nuclear Regulatory Department of Oceanography Commission Texas A & M University Washington, D.C. 20555 College Station, TX 77840 l Attn: Docketing and Service Section- Michael R. Sherwood, Esq.
Sierra Club Legal Defense Fund, Inc Gretchen Dumas, Esq. 2044 Fillmore Street California Public Utilities San Francisco, CA 94115 Commission 350 McAllister, Room 5243 San Francisco, CA 94102 Dated: July 1, 1982 l-
. I *
( RICHARD F. LOCKE Attorney Pacific Gas and Electric Company
( ,
__. ~- . . _ _ -
- -- -- ~ ~ - - ~
y . . .
C@F/
4 PACIFIC GAS AND ELECTidC COMPANY HUMBOLDT BAY POWER PLANT, UNIT NO. 3 Quarterly Status Report
- July 1, 1982 1 1
Since PGandE's last status report dated March 31, 1982, activities on Humboldt Bay, Unit 3, can be broken down into five items. The activities on each of these items are discussed below: I l '. Plant Operational Status
. l Humboldt Bay Unit 3 continues to be maintained in a cold shutdown condition. The reactor coolant system is filled with reactor coolant but depressurized.
The reactor vessel. head and shjeld plug are in place. The reactor core is loaded with 184 fuel assemblies, 44 of which are new fuel assemblies.
In the spent fuel pool, 250 spent fuel assemblies continue to be stored. There are 236 empty spaces remaining in the spent fuel pool.
Reactor control rods are fully inserted. The control rod drive system is de-energized and cannot be re-energized without the knowledge and consent of the shift foreman. In addition, the control rod hydraulic system is depressurized.
This system would need to be filled and vented before control rods could be withdrawn. The emergency boration system, reactor clean up system, liquid radwaste processing system, refueling building ventilation system, nuclear instrumenta-tion, and radiation monitoring systems are all maintained operational.
Surveillance testing is performed as required by the Technical Specifications. Fire protection, radiation protection, material accountability, radioactive waste management, training and quality assurance programs are being implemented and are audited by NRC's Region V inspectors.
! PGandE has' continued to comply with the shift '
~
manning requirements for the shutdown mode in g
accordance with the Humboldt Bay Technical Speci-fications. The current numbers of licensed )
operating personnel available to cover four shifts i are the following:
l,
y
, -x . .
~
4 ;
i
- a. 5 Senior _ Operator Licensees, SOL (4 Shift Foremen, 1 Relief Shift Supervisor).
6
-b. 9 Operator Licensees, OL (4 Control i Operators, 4 Senior Control Operators,
' Operators, 4 Senior Control Operators, 1 Senior Control Operator in Training for a SOL).
4 c. 4 management personnel at the plant who hold a current SOL to supplement the operating staff if needed.
I' PGandE has continued to fully comply with the latest (Revision 2) Humboldt Bay Power Plant
- Security Plan dated November 16, 1976. This security plan has been approved by the NRC Staff as being adequate. Any further changes in the Plant Security Plan will be submitted to the NRC Staff in accordance with current regulations.
Reports regarding Unit 3 are routinely submitted to the NRC as required by the license and other -
regulations. These include: Monthly Operating ,
Status Reports; Radioactive Effluent Release and Waste Disposal Reports, and Licensee Event Reports, if required.
Scheduled and unscheduled inspections of the plant have been conducted by the NRC's Inspection and Enforcement Region V Inspectors. Any violations and/or. deviations have been resolved to the satis- .
faction of the NRC Staff.
No revisions or modifications in the Humboldt Bay Un'it 3 design or operation have been made that i, would bear upon the bases on'which the NRC Staff
- concluded that the plant, in its present shutdown
- condition, poses no risk to the health and safety of the public.
- 2. Plant Improvements
, PGandE has commenced activities that will result l'
in the construction of a new low level radwaste
- storage building on the Humboldt Bay Power Plant site. When complete, the new building will provide
( 'a weather protected radioactive waste storage and 2
handling area. The building has been designed to ;
meet all applicable NRC requirements. The building design has been completed and a local building ,
- permit obtained. Construction was started in early June 1982. i l
m c :'_gr . a
- - - . .~._ -
V #\ a ,
f .
, . 1
- 3. Monitoring of the NRC's Safety Goal Rulemaking As noted in the Order, the NRC has published for
- comment a, proposed policy statement on safety goals for nuclear power plants. A report dis-
- cussing the development of the proposed policy ,
statement has been published separately as NUREG- '
0880, Safety Goals for Nuclear Power Plants: A Discussion Paper. FuS11c comments were due by-May 18, 1982. PGandE assumes that the NRC will i evaluate the public comments received and issue final policy recommendations later this year.
- ~4. Review of New NRC Requirements for Operating Nuclear Plants .
PGandE is continuing to review NRC promulgated information such as I&E Circulars, Bulletins,
~
Information Notices, NUREGs, and the Federal
- Register notices for regulations and guidance ;
applicable to the Humboldt Bay plant in its current cold shutdown status. PGandE's review also considers the potential _for significant safety problems associated with the plant for all other operational modes and considers those actions which are necessary to comply with the intent of NRC requirements.
Those applicable requirements which are not immediately acted upon are placed on a list of work items that must be satisfactorily resolved prior to restart of Unit 3.
- 5. Evaluation of Steam Plant Conversion Alternatives PGandE is continuing its evaluation of various fossil fired steam' system conversion alternatives.
The' conversion alternatives presume the decommissioning of the nuclear portion of Unit 3 while retaining the power generation' portion of the plant available i for-continued use with a new steam supply source.
The alternative steam supply systems being evaluated i
include: a coal fired boiler; an oil / natural gas fired boiler; a biomass (wood chip) fired boiler; and a combined cycle waste heat boiler. The evaluations focus on engineering feasibility and ,
trade-offs, fuel supply and transportation, pollution
. control requirements, cycle efficiencies, waste j s ' management, permit requirements, PGandE generation ;
and transmission requirements, equipment capital ;
costs, and operation and maintenance costs. i
, ..~ .J . .{!,i.. .. -~ . . . . . . ,,. 4 . . ., ... .-
o . . ..
I, ! )
~
C@py, UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )
)
PACIFIC GAS AND ELECTRIC COMPANY ) Docket No. 50-133 License No. DPR-7
~ '
)
(Humboldt Bay Power Plant, Unit No. 3) )
- )
CERTIFICATE OF SERVICE The foregoing document of Pacific Gas and Electric Company has been served today on the following by deposit in the United States mail, properly stamped and addressed:
Linda J. Brown, Esq. Robert M. Lazo, Esq., Chairman 100 Van Ness Avenue, 19th Floor Atomic Safety and Licensing San Francisco, CA 94102 Board Panel U.S. Nuclear Regulatory Commission Mitzi Young, Esq. Washington, D.C. 20555 office of Executive Legal Director Mr. Gustave A. Linenberger, Member BETH 042 Atomic Safety and Licensing U.S. Nuclear Regulatory Board Panel Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Washington, D.C. 20555 Secretary Dr. David R. Schink U.S. Nuclear Regulatory Department of Oceanography Commission Texas A & M University Washington, D.C. 20555 College Station, TX 77840 Attn: Docketing and Service Section Michael R. Sherwood, Esq.
Sierra Club Legal Defense Fund, Inc.
Gretchen Dumas, Esq. 2044 Fillmore Street California Public Utilities San Francisco, CA 94115 Commission 350 McAllister, Room 5243 San Francisco, CA 94102 Dated: July 1, 1982
- ~
t RICHARD F. LOCKE Attorney Pacific Gas and Electric Company 1
- es - . . . .
,-_- . . . , . . _ . , , . - . - . . . . . .. _ _ . _ - . . . - _ , . _ ,,- - . .-