Letter Sequence Other |
---|
|
|
MONTHYEARNOC-AE-19003684, Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Essential Cooling Water (Ecw) System Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1)2019-09-26026 September 2019 Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Essential Cooling Water (Ecw) System Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1) Project stage: Request NOC-AE-19003677, License Amendment Request to Revise Technical Specifications to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec.2019-09-26026 September 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. Project stage: Request ML19309F1412019-11-0404 November 2019 Supplemental Information Request - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L 2019-LLR-0096) (Draft) Project stage: Draft Other ML19312A0962019-11-13013 November 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action Proposed Alternative to ASME Requirements for Repair of Essential Cooling Water Class 3 Buried Piping Project stage: Acceptance Review NOC-AE-19003696, Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096)2019-11-26026 November 2019 Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096) Project stage: Supplement ML19344A0092019-12-0909 December 2019 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping Project stage: Acceptance Review ML20036F5862020-02-0404 February 2020 Request for Additional Information - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L-2019-LLR-0096)Redacted Project stage: RAI NOC-AE-20003716, Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping2020-03-0909 March 2020 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping Project stage: Request ML20069L4992020-03-0909 March 2020 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping Project stage: Request NL-20-039, (04/29/2020) E-mail from R. Gaston to R. Guzman, Exemption Request from Requirements of 10 CFR Part 73, Appendix B, Section VI, Subsection C.3.(l)(1)2020-04-29029 April 2020 (04/29/2020) E-mail from R. Gaston to R. Guzman, Exemption Request from Requirements of 10 CFR Part 73, Appendix B, Section VI, Subsection C.3.(l)(1) Project stage: Other ML20128J8432020-05-15015 May 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML20142A5202020-05-21021 May 2020 Exemption Request Due to COVID-19 Pandemic Project stage: Other NL-20-0620, SNC Requests a Temporary Exemption from the Quarterly Fire Brigade Drills and Annual Live Fire Fighting Training Requirements of the Regulation2020-05-22022 May 2020 SNC Requests a Temporary Exemption from the Quarterly Fire Brigade Drills and Annual Live Fire Fighting Training Requirements of the Regulation Project stage: Other NL-20-0640, Response to Request for Additional Information for Exemption Request2020-05-27027 May 2020 Response to Request for Additional Information for Exemption Request Project stage: Response to RAI ULNRC-06587, Supplement to Security Training Exemption Request Due to COVID-192020-06-17017 June 2020 Supplement to Security Training Exemption Request Due to COVID-19 Project stage: Supplement NOC-AE-20003749, Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24)2020-07-15015 July 2020 Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Response to RAI ML20197A2612020-07-15015 July 2020 Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Response to RAI ML20177A6452020-07-15015 July 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for June 2020 Project stage: Approval ML20212L5682020-07-30030 July 2020 Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Supplement NOC-AE-20003755, Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24)2020-07-30030 July 2020 Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Supplement ML20232D1442020-08-26026 August 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML20227A3852020-09-0303 September 2020 Nonproprietary - Proposed Alternative RR-ENG-3-24 to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping Project stage: Other 2020-05-15
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24036A0162024-02-0101 February 2024 NRC Email - Acknowledge and Accept the Indian Point Energy Center Request to Be Removed from NRC Headquarters Operation Officer (Hoo) Morning Authentication Code Calls ML23341A2002023-12-0707 December 2023 Email - Indian Point Energy Center Generating Units 1, 2, and 3 – Implementation Notice of Amendment No. 67, 300 and 276 to Independent Spent Fuel Storage Installation Only Emergency Plan (Ioep) ML23332A0802023-11-0808 November 2023 Email from State of New York on the Revised License Amendment for Indian Point Energy Center ISFSI Only Emergency Plan ML23331A9542023-11-0808 November 2023 Email - State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23325A1632023-11-0808 November 2023 State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23144A3382023-05-25025 May 2023 Dawn Giambalvo of Jersey City, New Jersey Email Against Treated Water Release from Indian Point Site ML23144A3422023-05-25025 May 2023 Peter Duda of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3452023-05-25025 May 2023 Adam Kahn of Monsey, New York Email Against Treated Water Release from Indian Point Site ML23144A3502023-05-25025 May 2023 Dan Kwilecki of Montebello, New York Email Against Treated Water Release from Indian Point Site ML23144A3392023-05-25025 May 2023 David Morris of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3442023-05-25025 May 2023 Peggy Kurtz of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23136B1622023-05-15015 May 2023 Town of North Salem, County of Westchester, New York Board Resolution Letter Regarding Treated Water Release from Indian Point Site ML23109A0632023-04-17017 April 2023 Email Acceptance Review for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML23055A1112023-02-23023 February 2023 Alyse Peterson Email- NYSERDA No Comments on Indian Point Unit 2 - Regarding Holtec License Amendment Request to Revise Permanently Defueled Technical Specifications and Staffing Requirements with Spent Fuel Transfer to ISFSI (Dockets 50-24 ML23049A0032023-02-14014 February 2023 NRC Acceptance Email to Holtec for License Amendment Request for Approval of New ISFSI-Only Emergency Plan and Associated EAL Scheme ML22313A1682022-11-0909 November 2022 NRC Response to Updates to the Proposed Amended IP2 Master Trust ML22308A0912022-11-0303 November 2022 Email Acknowledgement for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML22276A1642022-09-29029 September 2022 New York State Revised Draft EA Response E-Mail ML22271A8492022-09-28028 September 2022 E-Mail Transmitting Revised Indian Point Exemption Draft EA ML22269A3452022-09-22022 September 2022 Email Objection to Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2, EPID L-2022-LLA-0072 ML22259A1992022-09-0202 September 2022 Acceptance for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22265A0142022-08-31031 August 2022 Email Acknowledgement for Amended and Restated Holtec IP3 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 3 ML22242A2592022-08-19019 August 2022 E-mail from K. Sturzebecher, NRC, to B. Noval, HDI, Acknowledgement for Amended and Restated Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2 ML22228A1332022-08-0909 August 2022 Acknowledgement for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22215A0432022-08-0101 August 2022 E-Mail Transmitting NYS NSA Exemption Comments & Draft EA Review Completion ML22208A0292022-07-19019 July 2022 E-Mail Transmitting Indian Point Exemption Draft EA ML22168A0072022-06-16016 June 2022 Acceptance Review for License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22112A0102022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 50.54(w)(1) Concerning Indian Point Energy Center Onsite Property Damage Insurance ML22112A0122022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance for Indian Point Energy Center ML22103A2432022-04-13013 April 2022 E-mail - Request for Additional Information - License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme for Permanently Defueled Condition for Indian Point Energy Center ML22104A0342022-04-13013 April 2022 E-mail from Z. Cruz, NRC to J. Fleming, Holtec - Request for Additional Information Related to Request for Exemption from Portions of 10 CFR 50.47 and Part 50 Appendix E for Indian Point Energy Center ML22038A2572022-02-0707 February 2022 E-mail from Z. Cruz, NRC, to J. Fleming, HDI - Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition for Indian Point Energy Center ML22035A1862022-02-0404 February 2022 E-mail to J. Fleming, Holtec, from Z. Cruz Perez, NRC - Acceptance Review: Exemption Requests from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E, Section IV for Indian Point Energy Center ML22028A1032022-01-28028 January 2022 E-mail Dated 1/28/2022, Transmittal of Draft Safety Evaluation for Proposed License Amendment Revision to Licensing Basis to Incorporate the Installation and Use of of New Auxiliary Lifting Device ML22038A1592022-01-24024 January 2022 NRR E-mail Capture - (External_Sender) 2021 IPEC Annual Sturgeon Impingement Report ML22006A0442022-01-0505 January 2022 Email from Z Cruz to J Fleming Request for Additional Information - HDI Indian Point Post-Shutdown Decommissioning Activities Report ML21337A2952021-12-0303 December 2021 Subsequent Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device (E-mail Dated 12/3/2021) ML21335A3692021-12-0101 December 2021 Acceptance Review: Indian Point Energy Center - Exemption Request from 10 CFR Part 20 App G Section Iii.E ML21266A2972021-08-18018 August 2021 8/18/2021 E-mail from H. Specter to R. Guzman Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting on July 29, 2021 ML21225A5012021-08-0909 August 2021 Email from NRC to the Shinnecock Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21224A3032021-08-0909 August 2021 Email from NRC to the Mashantucket Pequot Tribe of Connecticut Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A6142021-08-0909 August 2021 Email from NRC to the Tuscarora Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5682021-08-0909 August 2021 Email from NRC to the Stockbridge-Munsee Community Band of Mohican Indians Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4252021-08-0909 August 2021 Email from NRC to the Oneida Nation of Wisconsin Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A3142021-08-0606 August 2021 Email from NRC to the Oneida Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4402021-08-0606 August 2021 Email from NRC to the Onondaga Nation of Wisconsin Announcing the IPEC PSDAR Meeting on August 18, 2021 ML21225A5352021-08-0606 August 2021 Email from NRC to the Tonawanda Band of Seneca Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5462021-08-0606 August 2021 Email from NRC to the St. Regis Mohawk Tribe Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21266A2942021-07-25025 July 2021 E-mail from Paul Blanch to NRC (N. Sheehan, D. Screnci) Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting, July 29, 2021 ML21197A2002021-07-16016 July 2021 (E-mail 7/16/2021) NRC Staff Assessment and RAI Closeout HDI Fleet Decommissioning Quality Assurance Program and Indian Point Energy Center Quality Assurance Program Manual 2024-02-01
[Table view] |
Text
From: Gaston, Ronald William To: rich.guzman@nrc.gov Cc: DocProcessing Center; Haagensen, Brian
Subject:
Entergy - Indian Point - Exemption from Annual force-on-force (FoF) Exercise Date: Wednesday, April 29, 2020 4:00:41 PM NL-20-039 Indian Point Nuclear Generating Unit Nos. 2 and 3 NRC Docket Nos. 50-247 and 50-286 Renewed Facility Operating License Nos. DPR-26 and DPR-64 NRR Project Manager - Indian Point Mr. Richard Guzman
Reference:
NRC Letter from Mr. Ho Nieh and Mr. John Lubinski to Mr. Chris Bakken, "U.S.
Nuclear Regulatory Commission Planned Actions Related to the Requirements for Part 73, Appendix B,Section VI During the Coronavirus Disease 2019 Public Health Emergency," (ML20105A483), dated April 20, 2020
Dear Mr. Guzman,
In accordance with the Referenced letter, Entergy Nuclear Operations, Inc. on behalf of Indian Point Nuclear Generating Units Nos. 2 and 3 (Indian Point), requests an exemption from the requirement to conduct an annual force-on-force (FoF) exercise specified in 10 CFR 73, Appendix B, Section VI, subsection C.3.(l)(1). No exemption is requested for the quarterly tactical response drill required by this same subsection.
In support of this request Entergy provides the following information:
Indian Point expects that it will no longer be able to comply with the requirements of subsection C.3.(l)(1) of 10 CFR Part 73, Appendix B, Section VI in regard to the annual force-on-force (FOF) exercise on June 30, 2020; Indian Point implemented its site-specific COVID-19 public health emergency (PHE) controls for managing personnel performing Security Program duties on March 15, 2020.
Indian Points site-specific COVID-19 PHE controls are consistent with the conditions outlined in Enclosure C to the referenced letter; Enclosure C Additional Information Entergy will maintain a list of the names of the individuals who will not meet the requirements of 10 CFR Part 73, Appendix B, Section VI, subsection C.3.(l)(1) for the annual FoF exercise. The list will include the dates of the last quarterly drill and annual FoF exercise in which the individual participated.
Entergy is taking measures to ensure contingency response readiness despite security personnel not participating in an annual FoF exercise. These measures include the continuing conduct of quarterly tactical response drills, which include one of the following:
a table top exercise a communication-based exercise a lessons-learned review of past exercise a walkdown of previous exercise route of travel Entergy will conduct any missed annual licensee-conducted FoF exercises after the PHE ends. The missed exercises will be completed by December 31, 2020.
Duration of Exemption Entergy requests that the exemption be in effect until 90 days after the PHE is ended or until December 31, 2020, whichever occurs first. Near the end of the exemption period, if more time is needed, an additional email supplement request may be submitted to extend the exemption period.
Entergy requests approval of this request by June 15, 2020.
Sincerely, Ron Gaston Director, Nuclear Licensing cc: NRC Region I Regional Administrator - David Lew NRC Senior Resident Inspector - Brian Haagensen NRC Document Control Desk Ron Gaston Director - Nuclear Licensing Entergy Nuclear - Echelon Office (601) 368-5138(W) / (630) 251-7433 (C) rgasto1@entergy.com