MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20209G0721999-07-13013 July 1999 Forwards Monthly Operating Repts for June 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs of SV Occurred During Reporting Period ML20209F0681999-07-0909 July 1999 Informs That Effective 990514,TU Electric Formally Changed Name to Txu Electric.Change All Refs of TU Electric to Txu Electric on Correspondence Distribution Lists ML20209E0421999-07-0909 July 1999 Forwards Response to NRC Request for Addl Info on LAR 98-010.Attachment 1 Is Affidavit for Info Supporting LAR 98-010 ML20209B6021999-06-30030 June 1999 Submits Second Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Readiness Disclosure for Reporting Status of Facility Y2K Readiness Encl ML20195J6981999-06-15015 June 1999 Provides Addl Info Related to Open Issue,Discussed in 990610 Conference Call with D Jaffe Re ISI Program Relief Request L-1 Submitted by Util on 980220 ML20196A4921999-06-15015 June 1999 Forwards Rev 30 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 ML20195J0491999-06-14014 June 1999 Submits Response to RAI Re Implementation of 1.0 Volt Repair Criteria ML20195J0651999-06-14014 June 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves 05000445/LER-1999-001, Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 11999-06-0808 June 1999 Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 1 ML20195F0091999-06-0808 June 1999 Forwards Response to RAI Re Units 1 & 2 ISI Program for Relief Requests E-1 & L-1.Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20207E1921999-05-28028 May 1999 Submits Updated Request for NRC Staff to Review & Approve Certain Changes to CPSES Emergency Plan Submitted in 981015 & s Prior to Changes Being Implemented at CPSES ML20207E1711999-05-28028 May 1999 Supplements 990526 LAR 99-004 as TU Electric Believes Extingency Exists in That Proposed Amend Was Result of NOED Granted to Prevent Shudown of CPSES Unit 1 ML20207D9841999-05-26026 May 1999 Requests That NRC Exercise Enforcement Discretion to Allow Cpses,Unit 1 to Remain in Mode 1,power Operation,Without Having Performed Svc Test,Per SR 4.8.2.1d on Unit 1 Battery BT1ED2 ML20195B6351999-05-25025 May 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves TXX-9912, Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise1999-05-21021 May 1999 Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise ML20206U1981999-05-20020 May 1999 Forwards Form 10K Annual Rept,Per 10CFR50.71(b). Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20196L1931999-05-20020 May 1999 Forwards MOR for Apr 1999 for Cpses,Units 1 & 2.During Reporting Period There Have Been No Failures or Challenges to Power Operated Relief Valves or Safety Valves TXX-9911, Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld1999-05-14014 May 1999 Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld 1999-09-03
[Table view] |
Text
l Log # TXX-96458
, File # 10010.1
- """ 9
~
905.4 (clo)
Ref. # 10CFR50.55a(a)(3)(1) r = 10CFR50.55a(f)(1,11) nlELECTRIC C. Lance Terry ,
or,viu rman September 12, 1996 l :
U. S. Nuclear Regulatory Commission J
, Attn: Document Control Desk -
Washington, DC 20555 i
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) l DOCKET NOS. 50 445 AND 50 446 l TRANSMITTAL OF RISKED BASED INSERVICE TESTING INFORMATION REQUESTED BY NRC REF: 1) TV Electric Letter logged TXX-96439, from C. L. Terry to !
l the NRC, dated August 22, 1996 1
, 2) TU Electric Letter logged TXX-96371, from C. L. Terry to l the NRC, dated June 3, 1996
! 1 l Gentlemen: I l On April 25, 1996, the NRC staff met with representatives from TU Electric to discuss the licensee's November 27, 1995,. risk-informed Inservice Testing (IST) submittal and the NRC staff's March 15, 1996, request for additional information (RAI). During the meeting, TU Electric agreed to i provide the staff with the a list of less safety significant components i
that are not exercised during the course of a normal refueling cycle.
Based on an initial review, a list of valves was identified and transmitted to the NRC by Reference 1. As noted by Reference 1. TV Electric is providing a revised list of valves. Reference 1 stated that a revised list would be provided by September 9,'1996. As a result of l conversations with Tim Polich of the NRC staff on September 9, 1996, the I
transmittal of the revised . list was extended until September 13, 1996.
. A review was conducted of the less safety significant valves which have a
. proposed test schedule of 6 years (as noted by Reference 2). Those valves which are not exercised during the course of a normal refueling cycle have l been identified (See Attachment). The Attachment to TXX 96458 supersedes i the Attachment to TXX 96439.
l l
l
- AC4/? '
c l D D 0500 45: l P_ PDR P.O. Box 1002 Olen Rose, Texas 76043 I'
TXX 96458-Page 2 of 2 If you have any questions, please call Carl Corbin at (817) 897 0121.
Sincerely, I. .
- C. L. Terry By
- MI '
3 Roger'D. Walker Regulatory Affairs Manager i CBC/cbc Attachment l
c- Mr. L. J. Callan, Region IV Mr. J. I. Tapia, Region IV i -Resident Inspectors, CPSES (clo)
, Mr. T. J. Polich, NRR-G. Bynog (TDLR) 1 l
l 3
i
Attichmmt to TXX-96458
' Page 1 of 6 CPSES Less Safety Significant Valves Not Exercised During Course of Normal Refueling Cycle Component Description Auxiliary Feedwater System ;
1 AF-0215 Safety-R31ated Air Accumulator to Non-Safety Air Supply isolation 1 AF-0216 Safety-Related Air Accumulator to Non-Safety Air Supply Isolation 1 AF-0217 Safety-Related Air Accumulator to Non-Safety Air Supply isolation a 1 AF-0218 Safety-Related Air Accumulator to Non-Safety Air Supply isolation l 1 AF-0219 Safety-Related Air Accumulator to Non-Safety Air Supply isolation 1 AF-0220 Safety-Related Air Accumulator to Non-Safety Air Supply isolation i AF-0221 Safety-Related Air Accumulator to Non-Safety Air Supply isolation l AF-0222 Safety-Related Air Accumulator to Non-Safety Air Supply isolation i 1 AF-0223 Safety-Related Air Accumulator to Non-Safety Air Supply isolation 2AF-0224 Safety-Related Air Accumulator to Non-Safety Air Supply isolation t 1 AF-0224 Safety-Related Air Accumulator to Non-Safety Air Supply isolation i
2AF-0223 Safety-Related Air Accumulator to Non-Safety Air Supply isolation j 1 AF-0226 Safety-Related Air Accumulator to Non-Safety Air Supply isolation j 2AF-0227 Safety-Related Air Accumulator to Non-Safety Air Supply isolation i
i 1 AF-0227 Safety-Related Air Accumulator to Non-Safety Air Supply isolation l 2AF-0226 Safety-Related Air Accumulator to Non-Safety Air Supply isolation AF-0228 Safety-Related Air Accumulator to Non-Safety Air Supply isolation !
AF-0229 Safety-Related Air Accumulator to Non-Safety Air Supply isolation
. 1 AF-0230 Safety-Related Air Accumulator to Non-Safety Air Supply isolation 2AF-0231 Safety-Related Air Accumulator to Non-Safety Air Supply isolation 1 AF-0231 Safety-Related Air Accumulator to Non-Safety Air Supply isolation 2AF-0230 Safety-Related Air Accumulator to Non-Safety Air Supply isolation 1
AF-0232 Safety-Related Air Accumulator to Non-Safety Air Supply Isolation AF-0233 Safety-Related Air Accumulator to Non-Safety Air Supply isolation
- AF-0234 Safety-Related Air Accumulator to Non-Safety Air Supply isolation AF-0235 Safety-Related Air Accumulator to Non-Safety Air Supply isolation HV-2480 AFW Pump Emergency Supply Flowpath HV-2481 AFW Pump Emergency Supply Flowpath
. _ _ - - .- - - . . _ . - . _ ~ - . . - . - . .-. ._
Attachm:nt to TXX-96458
' Page 2 of 6 1
CPSES Less Safety Significant Valves Not Exercised During Course of Normal Refueling Cycle 1
Component Description HV-2482 AFW Pump Emergency Supply Flowpath HV 2491 A Containment isolation & AFW to Faulted SG Flow isolation HV-24918 Containment Isolation & AFW to Faulted SG Flow Isolation HV-2492A Containment isolation & AFW to Faulted SG Flow Isolation i
HV-2492B Containment Isolation & AFW to Faulted SG Flow Isolation I HV-2493A Containment Isolation & AFW to Faulted SG Flow Isolation HV-2493B Containment isolation & AFW to Faulted SG Flow Isolation l
i HV-2494A Containment isolation & AFW to Faulted SG Flow Isolation j HV-24948 Containment Isolation & AFW to Faulted SG Flow Isolation
- Component Cooling Water System CC-0004 Surge Tank Demin Makeup Flowpath !
i CC-0629 - Containment Penetration Thermal Relief / Containment Isolation l CC-0831 Containment Penetration Thermal Relief / Containment isolation j
, 1 CC-1079 Safety-Related Air Accumulator to Non-Safety Air Supply isolation 1CC-1080 Safety-Related Air Accumulator to Non-Safety Air Supply isolation
- 1CC-1081 Safety-Related Air Accumulator to Non-Safety Air Supply isolation 1 CC-1082 Safety-Related Air Accumulator to Non-Safety Air Supply Isolation 2CC-1091 Safety-Related Air Accumulator to Non-Safety Air Supply isolation 2CC-1092 Safety-Related Air Accumulator to Non-Safety Air Supply isolation 2CC-1093 Safety-Related Air Accumulator to Non-Safety Air Supply isolation 2CC-1094 Safety-Related Air Accumulator to Non-Safety Air Supply isolation d
Chilled Water (Safety) System i
CH-0301 Surge Tank Demin Makeup Flowpath CH-0302 Surge Tank Makeup Flowpath Bypass CH-0305 Surge Tank Makeup Flowpath Bypass
- HV-6720 Surge Tank RMUW Makeup Flowpath Chemical and Volume Control System CS-8180 Containment Penetration Thermal Relief / Containment Isolation i
}
Attrchm:nt to TXX-96458
CPSES Less Safety Significant Valves Not Exercised During Course of Normal Refueling Cycle Component Description Containment Spray System CT-0020 Chemical Additive Flowpath CT-0031 Chemical Additive Flowpath CT-0072 Chemicat Additive Flowpath CT-0082 Chemical Additive Flowpath CT-0142 Contaiament Spray Flowpath/
Containment Isolation CT-0145 Containment Spray Flowpath/
Containment Isolation CT-0148 Sump Recirculation Flowpath CT-0149 Sump Recirculation Flowpath j HV-4758 Sump Recirculation Flowpath Boundary HV-4759 Sump Recirculation Flowpath Boundary HV-4782 Sump Recirculation Flowpath/
Containment isolation HV-4783 Sump Recirculation Flowpath/
Containment isolation CTVBCA-01 Chemical Additive Tank Ventpath/
System Boundary CTVBCA-02 Chemical Additive Tank Ventpath/
System Boundary Domineralized and Reactor Makeup Cater System 2DD-0008 Non-Safety Makeup Line isolation 2DD-0009 Non-Safety Makeup Line isolation 1 DD-0064 Non-Safety Makeup Line Isolation 1 DD-0066 Non-Safety Makeup Line isolation 1 DD-0020 Non-Safety Flowpath Isolation XDD-0103 Non-Safety Flowpath Isolation Main Steam System 2MS-0663 Safety-Related Air Accumulator to Non-Safety Air Supply isoletion 2MS-0664 Safety-Related Air Accumulator to Non-Safety Air Supply isolation 2MS-0665 Safety-Related Air Accumulator to Non-Safety Air Supply isolation
AttichmInt to TXX-96458 Page 4 of 6 1
! CPSES i Less Safety Significant Valves Not Exercised During Course of Normal Refooling Cycle Component Description l
2MS-0666 Safety-Related Air Accumulator to Non-Safety Air Supply isolation 2MS-0667 Safety-Related Air Accumulator to Non-Safety Air Supply isolation 2MS-0668 Safety-Related Air Accumulator to Non-Safety Air Supply isolation 2MS-0669 Safety-Related Air Accumulator to Non-Safety Air Supply isolation 2MS-0670 Safety-Related Air Accumulator to Non-Safety Air Supply isolation i
1 MS-0680 Safety-Related Air Accumulator to Non-Safety Air Supply isolation 1 MS-0681 Safety-Related Air Accumulator to Non-Safety Air Supply isolation j 1 MS-0682 Safety-Related Air Accumulator to Non-Safety Air Supply isolation j 1 MS-0683 Safety-Related Air Accumulator to Non-Safety Air Suppl /, Isolation 1 MS-0684 Safety-Related Air Accumulator to Non-Safety Air Supply Isolation I MS-0685 Safety-Related Air Accumulator to Non-Safety Air Supply Isolation 1 MS-0686 Safety-Related Air Accumulator to Non-Safety Air Supply isolation 1 MS-0687 Safety-Related Air Accumulator to Non-Safety Air Supply Isolation HV-23338 Steam Line Isolation / Containment isolation j HV-2334B Steam Line isolation / Containment Isolation HV-2335B Steam Line isolation / Containment isolation HV-2336B Steam Line Isolation / Containment Isolation i
Reactor Coolant System
! HV-3607 Post Accident Vent Path / Vent Path Isolation HV-3608 Post Accident Vent Path / Vent Path Isolation '
HV-3609 Post Accident Vent Path / Vent Path Isolation HV-3610 Post Accident Vent Path / Vent Path Isolation Safety injection System
~
8802A ECCS to Hot Legs Flowpath/ECCS to Cold Legs Flowpath & Boration Flowpath / Containment isolation & Passive Pipe Break Isolation 8802B ECCS to Hot Legs Flowpath/ECCS to Cold Legs Flowpath & Boration Flowpath / Containment isolation & Passive Pipe Break Isolation 8807A ECCS Recirculation Flowpath/ Passive Pipe Break Isolation 4
8807B ECCS Recirculation Flowpath/ Passive Pipe Break isolation i
Attichmant to TXX-96458 Page b of 6 i
CPSES j Less Safety Significant Valves Not Exercised During Course of Normal Refueling Cycle Component Description j SI-8900A ECCS to Cold Legs Flowpath & Boration Flowpath/ Reactor Coolant Pressure J
Boundary SI-89008 ECCS to Cold Legs Flowpath & Boration Flowpath/ Reactor Coolant Pressure Boundary '
SI-8900C ECCS to Cold Legs Flowpath & Boration Flowpath/ Reactor Coolant Pressure Boundary SI-8900D ECCS to Cold Legs Flowpath & Boration Flowpath/ Reactor Coolant Pressure Boundary m
i SI-8905A ECCS to Hot Legs Flowpath/ Reactor Coolant Pressure Boundary &
Containment isolation i
St-8905B ECCS to Hot Legs Flowpath/ Reactor Coolant Pressure Boundary &
Containment isolation SI-8905C ECCS to Hot Legs F?owpath/ Reactor Coolant Pressure Boundary & !
?
Containment Isolation SI-8905D ECCS to Hot Legs Flowpath/ Reactor Cociant Pressure Boundary &
Containment isolation 8924 Passive Pipe Break Isolation 8949A ECCS to Hot Legs Flowpath/ Reactor Coolant Pressure Boundary 8949B ECCS to Hot Legs Flowpath/ Reactor Coolant Pressure Boundary
, 8949C ECCS to Hot Legs Flowpath/ Reactor Coolant Pressure Boundary 8949D ECCS to Hot Legs Flowpath/ Reactor Coolant Pressure Boundary 4
8969A ECCS Recirculation Flowpath /ECCS Flowpath Boundary (during Recirculation l with Loss of RHR B) 8969B ECCS Recirculation Flowpath /ECCS Flowpath Boundary (during Recirculation with Loss of RHR A) 1SI-8972 Containment Penetration Thermal Relief / Containment isolation 2SI-8983 Containment Penetration Thermal Relief / Containment isolation Service Water System a
4 HV-4393 Service Water Flowpath HV-4394 Service Water Flowpath HV-4395 AFW Pump Emergency Supply Flowpath 4
HV-4396 AFW Pump Emergency Supply Flowpath 4
1
Attichmrnt to TXX-96458 l Pag ~e D of 6 CPSES Less Safety Significant Valves Not Exercised During Course of Normal Refueling Cycle Component Description i Misc Containment isolation Valves (Instrument Air) 1 '
Cl-OO30 Containment isolation Misc Containment isolation Valves (Containment Hydrogen Purge)
HV-5540 Containment isolation i HV-5541 Containment Isolation a
l HV-5542 Containment isolation HV-5543 Containment Isolation HV-5562 Containment isolation HV-5563 Containment isolation J
Misc Containment isolation Valves (Liquid Waste Processing) 7135 Containment Isolation f
a f
I 1
4
?
i 3
1
]
l d
)
);