Monthly Operating Repts for Sept 1992 for Catawba Nuclear Station,Units 1 & 2
ML20115C909
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 09/30/1992
From: Simmons N, Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20115C885 List:
References
NUDOCS 9210200128
Download: ML20115C909 (10)


Text

- . .. . . . .. .- .. . .-. . . ~

4

-3

-OPERAi!NB_ DATA REPORT -l I

1 DOCKET ND 50-413 ._

I DATE 0syber 15.199d 1 flPERATING STAft!S COMPLE1EDBY R.A. Williams 'j TELEPHONE 704-362-5346 -i

1. Unit hase: Catauba 1 j 2. Reporting Pariod: September 1, 1992-Septesber 30,1992: l
3. Licensed iternal Power (MWt): 3411
4. Naseplate Rating (Bross MWe): 1305* Notes #Naseplate Rating
5. Design Electrical Rating (Net MWe)
1145 '(Gross MWe) calculated as

, 6. Maxinus Dependable Capacity (Bross MWel:  !!92 1450.000 M'/A x .90 power l 7. Maxisus Dependable Capacity (Net MWe): 1.29 _

factor-per Page lii,

, 9.-if Chang?s Occur in Capacity Ratings (itens Nusber 3 Through 7) Since Last NUREG-0020.

Report. Give Reasont l- ,

1 4

9. Poner Lacel To Which Restiitted, if Any (Net NWe's j- 10. Reason For Restrictions, If any:

J-i >

This Month Yr.-to-Date Cusulative

} 11. Hours in Reporting Period 720.0 6575.0 63624,0

12. nusber Of Hours Raattor Was Critical ,0.0 4605.0- 46995.3
13. Reacter Reserve Shutdown Hours --0-- - --0-- 4
14. Hours Eenerator On-L;ne 0.0 4604.5 .46000A 3
15. Unit Reserve Shutdown Hours --0-- --0-- --0--
16. Gross Thersal Energy 6ererated.(MWH) 0 15338142 148824447 4 i 17. Gross Electrical Energy Generated (MWM) 0 5433639 52303043 1

IB. Net Electrical Energy Generated-(MWH1 -12793. -5127856 49061550~

19. Unit Service Fattor- 0.0 70.0 72.3-f 20. Ifnit Availability Facter _ ' O.0 70,0 72.3-
21. Unit Capacity Factor (Using MDC Net) 0.0 ~ 69.1 _68.0
22. Unit Capacity Factor (Using DER Net) 0.0 68.1 67.3
23. Unit Forced Dutage Rate 100.0-- .1.8 - 10.6- .
24. Shutdowh Scheduled Ov c Next 6 u nths (Type, Date, and Duration of Eacht:

Current 1v Refueline

). 25. If Shut Down At End Of Report Period. Estimated.Date of Startup October 18. 1992

26. Units In Test Status (Prior to Coseercial Operation): . Forecast Achieved-
~

INiilALCRITICALITY j INITIAL ELECTRICITY

COMMERCIAL OPERAi!0N T

4 p 00128 921015 g ADOCK 05000413 .

PDR

, _ _ _ _ . ~ . _ . _ _ . - _ , _ . _

_ . _ . . _ . _ . . _ ~ . .m.. _. . _. _ . . . ~

i 5

OPERATING Dr.!A REPORT 0

DOCKET NO _. 50-413 i

UNii Catawba 1

. DATE 0ctober 15,1992 COMPLETED BY F.A. Wilhasi s 'iELEPHONE 704-382-5346 i

GONTH Sectesb' @ _

E D AVERASE DA!LY POWER LEVEL - LA1 AVERABE DAILY POWER LEVEL

(MWe-Net)- - (MWe-Net).

4 1 0 17 0

2 0 le 0

! 3 0 19 0

4 0 20 -0 5 0 21 0 i 6 0 22 0 i

1 7 0 23 0 0 0 24 0 9 0 25 0

10 0 26 -0 11 0 27 0

, 12 0 28 0 4

13 0 29 0 _

j- 14 0 30 0 15 0 i 16 0-l r

4 t

, , , . . , , , ,, , . . . , ,, . . . . - - --r, ~,,,e ,- *c. < +c.-- -~---iEw '

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-413 UNIT NAME CATAWBA 1 DATE lu/ id/ h REPORT MONTH September 1992 COMPLETED BY 74. c. s 1MMUIds TELEPHONE ( / u41 -J u z -a z t>J (1) 2) _

(4) (5)

E IlOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DbFATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HO'JRS N R/X NO. CODE CODE PREVENT RECURRENCE 1 92 1 S 441.52 C 1 RC FUELXX END-OF-CYCLE 6 REFUELING OUTAGE.

2 92- 9-19 S 192.00 B 1 CH HTEXCH 8 DAY EXTENSION DUE TO STEAM GENERATOR MAINTENANCE 3 92- 9-27 F 86.48 A 3 CA VESSEL REACTOR COOLANT SYSTEM LEAKAGE AT CONO-SEAL AT REACTOR VESSEL HEAD (1) (2)Reason (3) (4)

F. Forced

  • Method: Exhibit G - Instructions S Scheduled 1-Manual for Preparation of, Data

'A-Equipment FailureB-Maintenance or test (Explain) 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram (LER D-Regulaton-Restriction 4-Other (Explain) Eyent File Report (NUEG-Ol6.) )

E-Operator Training & License Examination F-Administrative (5)

G-Operator Errgr (Explain) Exhibit I - Same Source H-Other'(Explain)

MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: Catawba. Unit 1
2. Scheduled next refueling shutdown: July 1992
3. Scheduled restart following refueling: Sentember 1992 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled- date(s) for submitting propoced licensing action and supporting information.-
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: iqa
8. Present licensed fuel pool capacity: 1418 Size of recuested or planned increase: -
9. Projected date of last refueling _ which can be accommodated by present licensed capacity: Sentember 2009

, DUKE POWER COMPANY DATE: September 15, 1992 i

Name of

Contact:

R. A. Williams Phone: 704-382-5346_

J t

. . _ - . _ -~ _ _. _ .

.i DOCKET NO: 413 i

UNIT: Catawba 1 DATE: 10/15/92 i

NARRATIVE

SUMMARY

MONTH: September 1992 Catawba Unit 1 began the month of September in end-of-cycle 6 refuelis.g outage. The unit was originally scheduled to return to service on 9/91.

The oc ;a was extended by 8 days due to. additional steam generator maintenance, and extended through the end-of the month for reactor coolant system leakage at a conoseal at the reactor vessel head and for reactor coolant pump seal problems. The unit ended the month in the-

, refueling outage.

i i

i 1

4 1

4 i

s b

1- <

, Prepared by: N. C. Simmons )

Telephone: 704-382-5263 l l

\

e

. _ - , = ,

OPERATING DATA REPORT

, i DOCKET NO 50-414 DATE October 15. 1992 OPERATING STATUS COMPLETED BY R.A. Willians TELEPHONE -704-382-5346

1. Unit Name Catawba 2
2. Reporting Period: Septesber 1, 1992-September 30,1992
3. Licensed Thereal Power (MWt): 3411
6. Naseplate Rating (Gross MWe): 1305e Notes *Naseplate Rating
5. Design Electrical Rating (Net MWe):  !!45 (Bross MWe) calculated as
6. Maxinus Dependable C yacity (Gross MWe): 1192 1450.000 MVA .90 power
7. Maxinus Dependable Capacity Met ?!Wel: .!!29 factor per Page iii, S. If Changes Occur in Capacity Ratings (itees 'lueber 3 Through 7) Since Last NUREB-0020.

Report. Give Reasons: _

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason For Restrictions, if any:

This nunth Yr.-to-Date Cueulative

!!. Hours in Reporting Period 720.0 6575.0 53640.0

12. Nusber Of Hours Reactor Was Critical 720.0 6552.4 40950.0
13. Reactor Reserve Shutdown Hours --0-- --0-- --0--
14. Hours Benerator On-Line 720.0 6521.9 40085.1
15. Unit Reserve Shutdown Hours --0-- --0-- --0--
16. Bross Thereal Energy Generated (MWH) 2398226 21763391 -126889568
17. Gross Electrical Energy Generated (MWH) 047526 7718694 - 44994509~
10. Net Electrical Energy Benerated (MWH) 804225 7323138 42177007 i -19. Unit Service Factor

' 100.0 09.2 74.7

20. Unit Availability Factor 100,0 99.2 74.7
21. Unit Capacity Factor (Using MDC Net) 99.9 98.7 69.4.
22. Unit Capacity Fatter (Using DER Net) 97.6 97.3 60.7 -
23. Unit Forced Outage Rate 0.0 0.6 11.3
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Re ftm l i ne - .i n n ti n r v 23. 1993 - 6 5 d n v c:

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Coseercial Operation): Forecast Achievedt INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OFERATION

f -' OPERAi!NS DATA REPORT DOCKET N0 50-414~-

liNIT ' Catauba 2
i. DATE iktober 15. 1992 l' COMPLETED Bf R.A. Willlass j TELEPHONE 704-382-5346 RONTH Septeober 1992 i

4 DAY AVERAGE DAILY POWER LEVEL E D AVERA6E DAILY POWER LEVEL j (MWe-Net) (MWe-Net)

)-

l-.

1 1117 17 1114

$ 2  !!b la' 1111 l

l 3 _

1117 19 1093 I

4 1115 20 1112 i

i 5 1115 21 1113 i

! 6 1115 22 1110 i

. */ 1114 23 1118 -

4 ,

8 till 24 il29' 9  !!09 25 1129 l _

j 10 till 26 -!!27 i

4 11 1114 27 1120 l

12 1121 28 1117 l..

i L F 13 1122 29 1124

!!22 f 14 30 1132 15 1122 i

16 1120 s

j- 4 4 . .

i=

i 4- .;.  :.-.-,,.z,.,-..,---.,---.-,.....

_.~m . . - . .. ._. . . . ._.m . . _

UNIT SHUTDOWNS AND POWER REDUCTIOi4S DOCKET NO. 50-414 -

UNIT NAME CATAwuA 2 -

DATE 10/13/92 -

REPORT MONTH September 1992 COMPLETED BY H. C. SIMnUNS TELEPHONE (/us)-JUZ-32bJ (1)

{2) fg_ (4) (5)

E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION G (1gForced (2geason* (3 (4gxhibitG-Instructions ethod:

S Scheduled A-Equipment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of., Data 2-Manual Scram EntW Sheets For Licensee C-Refueling 3-Automatic Scram (LER D-Regulato n Restriction , ,

4-Other (Explain) Event File Report (NUREG-Ol61))-

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error (Explain) Exhibit I - Same Source H-Other (Explain)

MONTHLY REFUELING INFORMATION REOUEST

1. Facility names _ catawba. Unit 2
2. Sseduled next refuelint, shutdowns February 1991

+

3. Scheduled restart following refueling: Anril 1993 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling _ or resumption of operatien thereaf ter require a technical specification change or other license amendment?

If yes, what will these be?

4 If no, has reload design and core configuration been reviewed by safety Review-Committee regarding unreviewed s1fety_ questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting infr.rmation.
6. Important licensing considerations (now or different design or supplier, unreviewed design or performance analysis methods, s;gnificant changes in design or tre operating procedures).
7. Nuter of Fuel assemblies (a) in the core: 122 (b) in the spent fuel pool: 2.DQ
8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -
9. Projected date of last refueling which can be accommodated by present licensed capecity: Sectember 2011 DUKE POWER COMPANY DATE: SeDtember 15. 1992 N'eae cf

Contact:

R. A. Williams Phone: 204-382-5345_.

/

& _ __ _ _ _ _ . _ _ - - - - _ - _ _ - - _ - - - 1

..___ ____ __.__ _ _.__.._.._ _.. ..... ~.-__ _ _ -.__ _ -... _ _._ _

I 1

i i

DOCKET No: 50 414 l UNIT: Catawba 2 i

q DATE: 10/15/92 4

NARRATIVE

SUMMARY

I j .

MONTH: September 1992 i

Catawba Unit 2 began the month of September operating at 100% f 11' power. The. unit operated at or near 100% full power for the antire month-

, and ended the month at 100% full power, 1

i 4

1-'

r i

a l

I.

4 i

i 8 1

e 4

i i

l 4

6 k

I  :

Prepared by: N.-C. Simmons i Telepht.ne : 704 382-5263 4

1 i

. . . , - . - . , . - - . . , . - . - - - . . . . . . , . . . - + , . , . - , . . . . - . , - . . - . . - , , , . , .