ML20115C915
Jump to navigation
Jump to search
| ML20115C915 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 08/31/1992 |
| From: | DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20115C885 | List: |
| References | |
| NUDOCS 9210200131 | |
| Download: ML20115C915 (1) | |
Text
-
9 CATAWBA NUCLEAR STATION MONTilLY OPERATING STATUS REPORT August 1992 1.
Personnel Exposure -
For the month of August, no individual (s) oyceeded 10 percent of their allowable annual radiatico, Jose limit.
2.
The total station liquid release for December has been compared with the Technical Specifications maximum annual dose commitment and was lees than 10 percent of this limit.
The total station gaseous release for December has been compared with the Technical Specifications maximum annual dose commitment end was less than 10' percent of this list.
4 PD ADOC h3 L
R l
-. a.,