Fourth Interim Deficiency Rept,Item 102 Re Grease in friction-type Structural Connections.Initially Reported on 820915.Site Work & Procedures Revised to Require Mating Surface Insp.Final Rept Will Be Issued by 850401
ML20112D308
Person / Time
Site: Harris 
Issue date: 12/28/1984
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-309 102, 309, NUDOCS 8501140195
Download: ML20112D308 (4)


Text

'

k,

4

_ ;a..+ ~.. -. - n ~w.

,,n~..

Carolina Power & l.ight Com b. g g M 10k,. 2 9 & n ~=pany a.....;.-

P w Hill, N.C. 27562 December 18,1984 Mr. James P. O'Reilly NRC-309 United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 2900)

Atlanta, Georgia 30323 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 - 900,000 KW - UNIT 1 GREASE IN FRICTION TYPE STRUCTURAL CONNECTIONS, ITEM 102

Dear Mr. O'Reilly:

Attached is our fourth interim report on the subject item which was deemed reportable per the provisions of 10CFR50.55(e), on April 26,1983. CP&L is pursuing this matter, and it is currently projected that corrective action and submission of the final report will be accomplished by April 1,1985.

Thank you for your consideration in this matter.

Yours very truly, R. M. Parsons Project General Manager

~

Comoletion Assurance Shearon Harris Nuclear Power Plant RMP/das Attachment cc:

Messrs. G. Maxwell /R. Prevatte (NRC-SHNPP)

Mr. R. C. DeYoung (NRC) 8501140195 841228 PDR ADOCK 05000400 OFFICIAL. COP.Y.

S PDR j

f-~6d dast/l g

g

CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. I FOURTH INTERIM REPORT GREASE IN FRICTION TYPE STRUCTURAL CONNECTIONS ITEM 102 December 18,1984 REPORTABLE UNDER 10CFR50.55(e) das!/3

SUBJECT:

Shearon Harris Nuclear Power Plant / Unit No.1,10CFR50.55(e),

reportable deficiency.

Grease in Friction Type Structural Connections.

ITEM:

Bolted structural steel connections in the Unit No.1 Turbine and Containment Building have evidence of grease between mating surfaces.

SUPPLIED BY:

Not a supplier-related deficiency. Structural connections were field assembled.

NATURE OF_

DEFICIENCY:

The Turbine Building is seismically designed per Regulatory Guide 1.29, and the Containment Building is a Seismic Class I structure.

These structural connections were designed as friction type connections, requiring grease-free mating surfaces.

These connections were previously inspected and accepted.

DATE PROBLEM OCCURRED:

August 30, 1982.

DATE PROBLEM REPORTED:

On September 15,1982, CP&L (N. 3. Chiangi) notified the NRC (Mr. C. Hehl) that this item was potentially reportable.

On April 26,1933, CP&L (N. 3. Chiangi) notified the NRC (Mr.

A. Hardin) that the item was reportable per the provisions of 10CFR50.55(e).

SCOPE OF PROBLEM:

A reinspection of the Turbine and Containment Buildings, including connections where engineering evaluation indicated grease in the connection could have safety significance, has been com pleted.

Approximately 873 connections were reinspected in the Turbine Building and 500 in the Containment, with evidence of grease being found in approximately 366 and 67, respectively. Additional connections in the Turbine Building were identified as having evidence of grease since the reinspection addressed by this reportable item was completed.

dast/4

0 0

0 SAFETY IMPLICATION:

These structural connections were designed as friction type connections, with the ability of the connection to resist a shear failure dependent on the friction coefficient of the mating surfaces. The grease on these surfaces, by reducing the slip resistance, could allow the shear load to be transferred to the bolts, for which they were not designed.

REASON DEFICIENCY IS REPORTABLE:

Reportable due to the magnitude of the problem plus the extensive evaluation and/or rework required.

CORRECTIVE ACTION:

Appropriate site work and technical procedures have been revised to specifically require mating surface inspection during fit-up, and to specifically forbid the use of lubricants to fit up bolts. Inspection and craft personnel have received additional training in inspection and erection of structural steel in formal classes and on-the-job training.

Permanent Waivers (PW's) were written, requiring engineering evaluation, for each deficient connection. Each connection has been accepted "as-is" if not significantly deficient, or has been repaired to make it acceptable, based on this engineering evaluation. In addition to the deficiency documented in this report, structural connections in the Turbine and Containment Buildings also exhibited gaps between mating surfaces and in the Turbine Building torch cut bolt holes. These conditions were reported as NRC Reportable items 92 and 112, respectively. Connections in the Containment Building have been accepted or repaired based on engineering evaluations. In the course of the reinspections, the welded parts of the connections were inspected as well, and any deficiencies documented.

Ebasco Services is performing a reanalysis of the Turbine building structure taking into consideration all defects in combination which have been identified.

FINAL REPORT:

A final report will be issued when this reanalysis has been completed and evaluated and further rework, if required, completed. We now expect to issue a final report by April 1, 1935.