OPERATING DATA REPORT DOCKET NO.
50-302 DATE 2/1/R5 i
COMPLETED BY D. Graham TELEPHONE (904) 795-3802 OPERATING STATUS
- 1. Unit Name:
Crystal River Unit 3 Notes
- 2. Reporting Period:
1/1/85 - 1/31/85
- 3. Licensed Thermal Power (MWt):
2544 890
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
825
- 6. Maximum Dependable Capacity (Gross MWe):
860 821
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
NA
- 9. Power Level To which Restricted,If Any (N ANet MWe):
NA
- 10. Reasons For Restrictions,If Any:
This Month Yr..to-Date Cumulative
- 11. Hours in Reporting Period 744 744 69168
- 12. Number Of Hours Reactor Was Critical 744 744 46659.7
- 13. Reactor Reserve Shutdown Hours 0
0 1280.3
- 14. Hours Generator On-Line 744 744 45661.8
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1571111 1571111 103232996
- 17. Gross Electrical Energy Generated (MWH) 550098 _,,,
550098 35277315
- 18. Net Electrical Energy Generated (MWH) 521380 521380 33517391
- 19. Unit Service Factor 100%
100 %
66.0%
- 20. Unit Availability Factor 100 %
100%
66.0 %
- 21. Unit Capacity Factor (Using MDC Net) 85.4 %
85.4 %
61.0 %
- 22. Unit Capacity Factor (Using DER Net) 84.9 %
84.9 %
58.7 %
- 23. Unit Forced Outage Rate 0%
0%
19.9%
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date,and Duration of Each t:
Refueling Outage scheduled to begin 3/9/85 and last 20 weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
NA
- 26. Units in Test Status (Prior to Commercial Operationi:
Forecast Achiesed INITIAL CRITICALITY 1/14/77 INITIA L ELECTRICITY 1/30/77 COMMERCIAL OPERATION 3/13/77 8503180250 850208 I9973 PDR ADOCK 05000302 R
PDR L
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-302 UNIT F LCR P-3 DATE 2/1/85 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONm January 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe. Net) 1 767 37 728 765 737 2
g3 3
747 698 39 728 4
20 722 687 5
23 680 6
730 22 693 715 681 7
33 8
720 678 24 9
25 665 662 10 26 706 11 27 649 12 726
- s 641 13 716 632 29 14 730 30 625 724 633 15 31 16 720 INSTRUCTIONS On this format.hst the aserage daily unit p..wer leselin N1We. Net l'or each day in the reporting m.inth. Compute to the nearest whole megawatt.
191771
DOCKET NO.
50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNI T NAME F LC R P-3 DATE 2/4/85 COMPLETED BY R A Rtowni t REPORT MONTil 1/85 TELEPHONE (904)795-3802
~
i E
3E
'b
_.? E ~4 I scensee
,E t,
$*?
Cause & Corrective No.
D.it e c-
- 2 4
iE5 I: vent s?
o-Action to S
j(
E
~ d =$
Repost u cE G
$0 Present Recurrence v
c 85-01 850118 S
0.0 F
5 NA RC FUELXX End of fuel life. Power coastdown began.
I 2
3 4
I:: Forced Reason :
Method:
Exlubit G -Instructions S. Stheduled A-1 quipment Failure ( Explain) 1 -Manual for Picparation of Data n-Maintenance of Test 2 Manual Scrarn.
Entr> Sheets for 1.icensee C Refueling 3 Autornatic Scram.
1: vent Repose ll.l:R)I ile tNtIRI G.
D-Regulatory Restriction 4-Ot her ( Explain) 0161)
I Operator Training & Licenw I'xamination F-Administrative 5
G-Operational E:ror (lisplam)
I sinbit 1 Same Source 19/77)
Il-Ot her (INplain)
MONTHLY OPERATIONAL
SUMMARY
STATEMEhT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 2/4/85 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 MONTH January 1985
SUMMARY
STATEMENT:
Crystal River 3 operated normally with no outages during the month.
The plant began reducing power due to the end of cycle power coast-down.
4 I
I l
]