ML20112A304

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Dec 1984
ML20112A304
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/31/1984
From: Graham D
FLORIDA POWER CORP.
To:
Shared Package
ML20112A279 List:
References
NUDOCS 8503180247
Download: ML20112A304 (1)


Text

.

3 OPERATING DATA REPORT DOCKET NO.

50-302 DATE IMD COMPLETED BY n Grnhnrn TELEPHONE (904) 795-3802 OPERATING STATUS Crystal River Unit 3 Notes Please note correction CI rt ng Period:

12/1/84 - 12/31/84 en on for December.

3. Licensed Thermal Power (MWt):

2544

4. Nameplate Rating (Gross MWe):

890

5. Design Electrical Rating (Net MWe):

825

6. Maximum Dependable Capacity (Gross MWe):

860

7. Maximum Dependable Capacity (Net MWe):

821

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To Which Restricted. If Any INet MWe):

NA

10. Reasons For Restrictions. If Any:

NA This Month Yr. to.Date Cumulative II. Hours in Reporting Period 744 8784 68424

12. Number Of Hours Reactor Was Critical 744 8346.5 45915.7
13. Reactor Resene Shutdown Hours 0

0 1280.3

14. Hours Generator On-Line 744 8298.8 44917.8
15. Unit Resene Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1715240 19697550 101661885 17 Gross Electrical Energy Generated (MWH)

G5976573 C68000617

_ ( 3472679T)

18. Net Electrical Energy Generated (MWH) 568890 6478928 32996011
19. Unit Sersice Factor 100 %

94.5 %

65.6 %

20. Unit Availability Factor 100 %

94.5 %

65.6 %

21. Unit Capacity Factor IUsing MDC Net) 93.1 %

89.8%

60.7 %

22. Unit Capacity Factor (Using DER Neti 92 7 %

R94%

SR.5%

23. Unit Forced Outage Rate 0%

0.9%

20.2 %

24. Shutdowns Scheduled Oser Nest 6 Months iType. Date, and Duration of Each t:

Refueline outare scheduled to becin 3/9/85. and last 20 weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

NA

26. Units in Test Status tPrior to Commercial Operationt Forecast Achiesed INITIAL CRITICALITY I/14/77 INITI A L ELECTRICITY 1/30/77 COMMERCl4L OPER 4 TION 3/13/77

\\

8503180247 850208 PDR ADOCK 05000302 R

PDR

-