Interim Deficiency Rept,Item 203,re Environ Qualification of Motor Operators in Main Steam Tunnel.Initially Reported on 850201.Item Not Reportable Per 10CFR50.55(e)
ML20108F433
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/04/1985
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
203, MQAH-85-45, NUDOCS 8503120432
Download: ML20108F433 (1)


Text

e Cp&L ga lingwer & Light Company NO x 165, New Hill, North Carolina 27562 February 4,.1985 FILE:

SH N-2/18 MQAH:85~45 Item 203 Dr.-J. N.. Grace United States Nuclear Regulatory Commission Region II Suite 2900 101 Marietta Street, NW l

Atlanta, Georgia 30323 SHEARON HARRIS NUCLEAR F0WER PLANT, UNIT NO. 1 DOCKET NO. 50-400 MOTOR OPERATORS - ~ ENVIRONMENTAL QUALIFICATIONS

Dear.Dr. Grace:

This is to confirm the February 1,1985 telephone conversation between Mr. N. J. Chiangi (CP&L) and Mr. A. Hardin.

Mr. Hardin was informed that the January 4,1985 potentially reportable item, pertaining to the specification for motor operated valees located in the main steam tunnel not requiring qualification to the environmental qualification requirements as stated in the 'FSAR, has been evaluated and considered not to be reportable per the provisions of 10CFR50.55(e).

Thank you for your consideration in this matter.

Yours very'.truly, NJC/mt cc:

Mr. R. C. DeYoung N. J. Chi gi - Manager Mr. G. Maxwell Quality Ass ce/ Quality Control Mr. R. L..Prevatte Harris Plant 8503120432 850204 PDR ADOCK 05000400 omOAC COM g