PAUL SCHERRER INSTITUT p~p a

Document No.

ALPHA-607 Document Title PANDA Transient Tests M7 Integral System Test

. Apparent Test Results Revision Status Approval / Date Rev.

Prepared / Revised by P PM G-PM G SOR issue Date Remarks 6.

V J. Torbeck G. Wingate 17 April 96 vais on Ne O

C. Aubert d6-W-h 16 April 96 16 Apnl96 (P-EAM-38. p2)

tR5988aa3t888804 PDR A

1 ALPHA-607 Seite 2

Controlled Copy (CC) Distribution List Note: Standard distribution (cf. next page) is non-controlled CC Holder CC Ust Entry Return / Recall No.

Name, Affiliation Date Date

nes.oews m-42-96-09 Jumf PAUL SCHERRER INSTITUT ALPHA-607-0

" " " ~ ~

PANDA Transient Tests Erse Titel M7 Integral System Test Apparent Test Results Erswa Autoren/

C. Aubert, J. Dreier, O. Fischer, M. Huggenberger, S.Lomperski, HJ. Strassberger Autorinnen 16.04.%

Summary:

This Apparent Test Results (ATR) report is compiled in accordance with the requirements specified in the Test Plan (TP) 25A5764R3 (GE document) section 10. The report covers the l

results for the PANDA Transient Test M7. The ATR summarizes the apparent results and includes: test number, test objective, test date and time, data recording period, data analysis period, name of data file and ORACLE data tables, list of failed or unavailable instruments considered to be required for the test, list of required instruments with zero or reference check points not in tolerance or in over range or under-range during test, deviations from test proce-dure and problems which occured during test. Statements are made whether or not the test objective has been reached and the data were recorded correctly. A table of actual initial con-ditions based on average and standard deviation over one minute time period just before the test start for all parameters with a specified acceptance criterion in section 9.2 of TP is provided as well as time history plots over test duration for all top priority measurements.

l Veneur et Ernpfinger/Empfangemnen Egl Abt.

Empf&nger!Ernpfangemnon Egl Expl 1

GE San Jose CA Buethe G. Yadigaroglu 42 I

h.ube J.E. Torbeck w

6 T. Bandurski I

(for distribution at GE to J. Dreier 1

Total 19 O. Fischer 1

J.R. Fitch, G.A. Wingate, seen 22 J.Healzer i

B.S. Shiralkar, M. Huggenberger i

S. Lomperski 1

DRF No. T10-00005)

Beh ea 9

H.J. Strassberger 1

intormaronsasa PANDA Documentation 2

D l1 l2 l3 l4 l5 l89 lA vsum AbtAabodenung:

i

=.

ALPHA-607-0 page 4

PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS TEST M7 Contents:

Page

1. Test Objectives 5
2. Reference Documents 5
3. Test Date/ Time 5
4. Data Recording Period 5

l

5. File Names 5
6. ORACLE Data Tables 5
7. RPV Power Curve 6

)

8. Test Instrumentation 6
9. Deviations from Test Procedure 6
10. List of Deviations from Requested Initial Conditions 7
11. Test Processing 7
12. Requested Initial Conditions 7

-Data Analysis Period for Initial Conditions 7

Environment Parameters 8

RPV Parameters 8

DRYWELL Parameters 8

SUPPRESSION CHAMBER Parameters 9

'GDCS Parameters 10 PCCI Pool Parameters 11 PCC2 Pool Parameters 11 PCC3 Poo! Parameters 11

13. Graphs M7 Test - RPV, Drywell and Wetwell Pressures 13 M7 Test - Drywell and Wetwell Air Partial Pressures 14 M7 Test - RPV Heater Power 15 M7 Test - RPV and Drywell Temperatures 16 M7 Test - Wetwell Temperatures 17 M7 Test - PCC Lower Drum and GDCS Return Line Water Temperatures 18 M7 Test - PCC Vent Line Gas Temperatures 19 M7 Test - Main Steam Line & PCC Feed Line Flows 20 M7 Test - Main Vent Line 1 Temperatures 21 M7 Test - Main Vent Line 2 Temperatures 22

ALPHA-607-0 page 5

PANDA INTEGRAL SYSTEM TEST l

i APPARENT TEST RESULTS TEST M7

1. TEST OBJECTIVES:

The objectives of the PANDA integral system tests are to provide additional data to: a) confirm the capability of TRACG to predict SBWR containment system performance, including potential sys-tems interaction effects (Integral System Tests) and b) demonstrate start-up and long-term operation of a passive containment cooling system (Concept Demonstration).

The specific objective of test M7, which was initiated with Drywells and PCC units filled with air, is to provide data to determine the PCC condenser start-up characteristics when blanketed with noncondensable gas.

2. REFERENCE DOCUMENTS:

Test Plan:

GE document 25A5764R3 Test Procedure:

ALPHA-521-0

3. TEST DATF/ RIME:

Test Start:

14-NOV-95 /19:10:30 Test Stop:

15-NOV-95 / 00:20:43 Test Duration:

05:10:13 Test Period:

0 to 18613 see

4. DATA RECORDING PERIOD:

Start:

14-NOV-95 /18:57:10 Stop:

15-NOV-95 / 00:20:43 Data Recording Period:

-800 to 18613 sec

5. FILE NAMES:

Raw Data:

panda _M7.dat DAS-Configuration / Channel List:

kbt99999999.ol2

6. ORACLE DATA TABLES:

PANDA _M7_MT_LINE PANDA _M7_MT_ POOL PANDA _M7_MT_REF PANDA _M7_MT_ VESSEL l

PANDA _M7_M_OTHER PANDA _M7_M_ TINE PANDA _M7_KBT INFO _ TESTS

1 ALPHA 607-0 page 6

PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS TEST M7

7. RPV POWER CURVE:

Power analysis period:

20 to 18613 see Mean value Maximum negative deviation:

Maximum positive deviation:

Standard deviation:

Power curve tolerance-25.0

[kW)

Definition of RPV power deviation (APower) and standard deviation (c):

6 j

APower = Power -1MW.RP./

1 e

I"'

Power,: theoretical power MW.RP./: measured power f

(Power"- MW.RP./ )

('# of measurements throughout the test o=

8. TESTINSTRUMENTATION LIST OF FAILED OR UNAVAILABLE REQUIRED INSTRUMENTS:

Air partial pressure in DW1 MPG.DI.3 Back up instmment: MPG.DI.2 Air partial pressure in DW2 MPG.D2.3 Back-up instrument: MPG.D2.2 LIST OF REQUIRED INSTRUMENTS WITH ZERO NOT IN TOLERANCE OR OVER RANGE OR UNDER-RANGE DURING TEST:

None

9. DEVIATIONS FROM TEST PROCEDURE:

None

ALPHA-607-0 Page 7

PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS TEST M7

10. LIST OF DEVIATIONS FROM REQUESTED INITIAL CONDITIONS:
11. TEST PROCESSING PROBLEMS:

)

None HAS TIE TEST OBJECTIVE BEEN REACHED:

Yes HAVE THE DATA BEEN CORRECTLY RECORDED:

Yes

12. REQUESTED INITIAL CONDITIONS DATA ANALYSIS PERIOD FOR LNITIAL CONDITIONS:

Data analysis period:

-120 to -60 see Initial conditions are calculated over one minute just before connection of Drywells to RPV (phase n*113.9 of Test Procedure)

ALPHA-607-0 page 8

PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS TEST M7 TABLE OF INITIAL CONDITIONS VARIABLE PROCESSID UNIT Average Standard Requested Tolerance Value Devia' ion Value ENVIRONMENT PARAMETERS Atmospheric pressure MP.EN bar Temperature of saturation for atmospheric pressure (Ts,_ss)

C RPV PARAMETERS Total pressure MP.RP.1 bar Fluid temperatures:

Spatial average Tp_me (RP)

C Local MTF.RP.1 C

MTF.RP.2 C

MTF.RP.3 C

MTF.RP.4 C

MTF.RP.5 C

Water level ML.RP.1 m

DRYWELL PARAMETERS

  • Total pressure MP.D1 bar Air panial pressure MPG.Dl.1 bar MPG.DI.2 bar MPG.D2.1 bar MPG.D2.2 bar Gas temperatures:

Spatial average To_mean(D1)

C Local MTG.Dl.1 C

MTG.DI.2 C

MTG.DI.3 C

MTG.DI.4 C

MTG.DI.5 C

MTG.DI.6 C

  • The Drywell total pressures are noGnisependent vanables. uwy are given by temperatures and air parual pressures.The correspondmg tolerance is calculmed from temperature and air parual pressure tolerances.

I l

i l

~

ALPHA-607-0 page 9

PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS TEST M7 TABLE OF INITIAL CONDITIONS (Cont'd)

VARIABLE PROCESSID UNIT Average Standard Requested Tolerance i

Value Deviation Value DRYWELL PARAMETERS (Cont'd)

Spatial average To,mean(D2)

C Local MTG.D2.1 C

MTG.D2.2 C

MTG.D2.3 C

MTG.D2.4 C

MTG.D2.5 C

i MTG.D2.6 C

Water level ML.D1 m

ML.D2 m

i SUPPRESSION CHAMBER PARAME'mR Total pressure M P.Sl bar i

    • ir partial pressure MPG.Sl bar A

MPG.S2 bar Water temperatures:

Spatial average Tw m o(SI)

C j

Local MTL.Sl.1 C

M11..SI.2 C

MTL.S t.3 C

MTL.S t.4 C

j MTL.SI.5 C

MTL.SI.6 C

Spatial average Tw mean(S2)

C Local MTL.S2.1 C

MTL.S2.2 C

MTL.S2.3 C

MTL.S2.4 C

MTL.S2.5 C

MTL.S2.6 C

    • The Suppression Chamber air partial pressures are not independant vanables,iEy are gnen by temperaures and total pressures. The co ing tolerance is calculated from temperature and total pressure tolerances.

1 l

ALPHA-607-0 page 10 PANDA INTEGRAL SYSTEM TEST APPARFNr TEST RESULTS l

l TEST M7 TABLE OF INITIAL CONDITIONS (Cont'd)

VARIABLE PROCESSID UNIT Average Standard Requested Tolerance Value Deviation Value SUPPRESSION CHAMBER PARAMETERS (Cont'd)

Gas temperatures.

Spatial average To on(SI)

C

]

Local MTG.SI.1 C

MTG.SI.2 C

MTG.S t.3 C

MTO.S t.4 C

MTG.S t.5 C

MTG.S I.6 C

Spatial average To,mun(S2)

C Local MTG.S2.1 C

MTG.S2.2 C

MTG.S2.3 C

MTG.S2.4 C

MTG.S2.5 C

MTG.52.6 C

Water level M L.Sl m

ML.S2 m

GDCS PARAMETERS i

Total pressure MP.GD bar Fluid temperatures:

Spatial average Tp mon (GD)

C Local MTF.GD.1 C

MTF.GD.2 C

MTF.GD.3 C

MTF.GD.4 C

MTF.GD.5 C

MTF.GD.6 C

MTF.GD.7 C

Water level ML.GD m

~

ALPHA-607-0 page 11 PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS l

TEST M7 TABLE OF INITIAL CONDITIONS (Cont'd)

VARIABLE PROCESSID UNIT Average Standard Requested Tolerance Value Deviation Value PCCl POOL PARAMETERS Water temperatures:

Spatial average Tw nun (Ul)

C Local MTL.Ul.1 C

MTL.UI.2 C

MTL.Ul.3 C

MTL.UI.4 C

MTL.UI.5 C

MTL.UI.6 C

MTL.U1.7 C

i Water level ML.U1 m

PCC2 POOL PARAMETERS Water temperatures:

Spatial average Tw nun (U2)

C Local MTL.U2.1 C

MTL.U2.2 C

MTL.U2.3 C

MTL.U2.4 C

MTL.U2.5 C

MTL.U2.6 C

MTL.U2.7 C

Water level ML.U2 m

PCC3 POOL PARAMETERS Water temperatures:

Spatial average Tw,ne.n(U3)

C Local MTL.U3.1 C

MTL.U3.2 C

MTL.U3.3 C

ALPHA-607-0 page 12 PANDA INTEGRAL SYSTEM'IEST APPARENT TEST RESULTS TEST M7 TABLE OF INITIAL CONDITIONS (Cont'd)

VARIABLE PROCESSID UNIT Average Standard Requested Tolerance Value Deviation Value 1

PCC3 POOL PARAMETERS (Cont'd)

Water temperatures:

Local MTL.U3.4 C

MTL.U3.5 C

MTL.U3.6 C

MTL.U3.7 C

MTL.U3.8 C

MTL.U3.9 C

MTL.U3.10 C

MTL.U3.ll C

MTL.U3.12 C

MTL.U3.13 C

MTL.U3.14 C

MTL.U3.15 C

M11.U3.16 C

MTL.U3.17 C

MTL.U3.18 C

MTL.U3.19 C

Water level ML.U3 m

13.

GRAPHS:

a

?

M7 Test - RPV, Drywell and Wetwell Pressures

[bar]

4.00 Suu 3.50 -

3.00 y$>

~

h 2.50 __'

Mdo

?3 g; h v1 2.00 2;

~

-m

~

hh 1.50 -

yg Mm 1.00 J a

eu muu 0.50 -

)

0.00 8

s i

Q

-1000 1000 3000 5000 7000 9 0 11000 13000 15000 17000 19000 x

TIME _.SEC ov

-wo

g >'

[bar]

M7 Test - Drywell and Wetwell Air Partial Pressures I

?

4.00 8

{

3.50 1:

3.00 m

g a

d 4,e 2.50 2.00 -

Q l3

~

o U Nh

$am 1.50 --

gg FN

~

d 1.00 -

0.50 0.00 -~

i

-1000 1000 3000 5000 7000 9000 11000 13000 15000 17000 19000 TIME _SEC 1

l L

3Qx> 8$

"o

  • G m

O wgMK &eH n

h A

M

?"

0

,009 1

0 007 1

0 0

0 5

r 1

e w

00 o

,0 3

P 1

r e

0 t

0

. a

,0 1

e C

1 E

H S_

V 0 E 0

P

,0 M

9 I

R T

0 t

,0 s

07 eT 7

0

,0 M

05 00

,0 3

00

,0 1

0

)

0 W

0 k

~

~

~

1

[

0 0

0 0

0 0

0 0

0 0

0 0

8 6

4 2

0 8

6 4

2 0

2 1

1 1

1 1

0 0

0 0

0 1

1 1

1 1

1 1

1 1

1 1

>Gxt9 m$

g

Thg, O$mdMrM4 M$ l"P ym E

Maf 00

, 0 9

1 000 7

1 se r

0 u

00 t

5 a

1 r

e p

00 m

, 0 3

e 1

T l

00 l

e

, 0 1

w C

1 E

y S_

r 0 E D

, 00 M d

9 IT na 0

V

, 00 P

7 R

00 t

, 0 s

5 eT 0

7 0

M

, 0 3

00

, 0 1

0

]

0 c

0

[

1 0

0 0

0 0

0 0

0 0

0 0

0 4

3 2

1 0

9 8

7 6

5 4

3 1

1 1

1 1

[cj M7 Test - Wetwell Temperatures 88 l

87 -

86 -

mI 85 -

yz

%3 84 -

gg a ae 8

a M$

54m 82 -

gg mg 8-81 -

g 4

80 -

79 -

g 78

-1000 1000 3000 5000 7000 9000 11000 13000 15000 17000 19000

]

TIME _SEC 9

-ao

t

'N Gx>

I v

a M7 Test - PCC Lower Drum and GDCS Return Line

[c]

Water Temperatures 120

~

m 110 -

y l

Y>

100 -

du m

W 90 -

K yg hb "d

80 -

hK M

a 70 -

60 -

50

-1000 1000 3000 5000 7000 9000 11000 13000 15000 17000 19000 TIME _SEC

M7 Test - PCC Vent Line Gas Temperatures

[c]

120 -

110 -

100 -

m 90 -

g>

m 80 -

M30 70 -

A Mf 5am 60 -

gg mg 50 -

hK

-a 4

40 -

30 -

20

.g i

-1000 1000 3000 5000 7000 9000 11000 13000 15000 17000 19000 5

TIME _SEC s

G 5

'a > '

O e M7 Test - Main Steam Line & PCC Feed Line Flows 2

y

[g/s]

s 6

550 --

g 500 f

~

450 -

m k>

m

>g-350 f MkO 300 -

a M$

E f$m 250

@d 2*

4 gg h

150

~

100 -~

50 f O l 1

-1000 1000 3000 5000 7000 9000 11000 13000 15000 17000 19000 TIME _SEC

I

[cj M7 Test - Main Vent Line 1 Temperatures 140 -

~

t 130 -

120 -

m 110 -

yk m?

Mb]O

~

90 -

0 Yf 80 --

f$w gd 70 -

hr d M 60 -

N 50 -

40 -

~

y 30 a

-1000 1000 3000 '

5000 7000 9000 11000 13000 15000 17000 19000 y

f TIME _SEC 8

'E d

3@'

2

[cj M7 Test - Main Vent Line 2 Temperatures

[v 140 -

M 130 -

120 -

m 110 -

~

100 -

O 90 -

M5 s am 00 -

Ed 70 -

mg hX 60 -

d a

50 -

40 -

30

-1000 1000 3000 5000 7000 9000 11000 13000 15000 17000 19000 TIME _SEC

-.-