1 PAUL SCHERRERINSTITiff j
MA~
Document No.
ALPHA-601 Document Title PANDA Transient Tests M3 Integral System Test Apparent Test Results i
i a
l i
Revision Status Approval / Date 4
Rev.
Prepared / Revised by P-PM GSM G-SOR lssue Date Remarks 42-31~'%6M
'#E di-E-$b
'Y O
C. Aubert a M/4 % 1xhL-w 9605080203 960506 PDR ADOCK 05200004 A
r ALPHA-601 Seite 2
Controlled Copy (CC) Distribution List Note: Standard distribution (cf. next page) is non-controlled CC Holder CC List Entry Return / Recall No.
Name, Affiliation Date Date e
i i
i I
l
nes,s w ung m246-01
~
PAUL SCHERRER I N S TIT U T ALPHA-60i-0 M- -
Ersma PANDA Transient Tests Titel M3 Integral System Test 1
Apparent Test Results Ema Autoren/
C. Aubert, J. Dreier, O. Fischer, M. Huggenberger, S.Lomperski, H.J. Strassberger Autorinnen 13.02.96 Summary:
This Apparent Test Results (ATR) report is compiled in accordance with the requirements j
specified in the Test Plan (TP) 25A5764R1 (GE document) section 10. The report covers the results for the PANDA Transient Test M3. The ATR summarizes the apparent results and includes: test number, test objective, test date and time, data recording period, data analysis period, name of data file and ORACLE data tables, list of failed or unavailable instruments considered to be required for the test, list of required instruments with zero or reference check points not in tolerance or in over-range or under-range during test, deviations from test proce-dure and problems which occured during test. Statements are made whether or not the test objective has been reached and the data were recorded correctly. A table of actualinitial con-ditions based on average and standard deviation over one minute time period just before the test start for all parameters with a specified acceptance criteria in section 9.2 of TP is provided as well as time history plots over test duration for all top priority measurements.
Verteder Abt Empfinger/Empfangennnen Expl.
Abt Empinger/Empingemnen Expl.
Expl.
42 G. Yadigaroglu 1
GE@ PSI BNothek G. Varadt i
1 C. Aubert 1
A.G. Arretz Reserve 6
T. Bandurski 1
J. Dreier 1
Total 20 O. Fischer 1
GE San Jose CA I
senen J.Healzer 1
J.E. Torbeck M. Huggenberger 1
S. Lomperski I
(for distribution at GE to seitagen H.J. Strassberger 1
informa:ensaste J.R. Fitch, G.A. Wingate, PANDA Documentation 2
B.S. Shiralkar, ol1l2 3 l4 l5 ls l9 l A V'5"* Ab'A8
""S ~
DRF No. T10-00005)
q ALPHA-601-0 page 4
PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS TEST M3 Contents:
Page
- 1. TEST OBECTIVES 5
- 2. REFERENCE DOCUMENTS 5
- 3. TEST DATEfTIME 5
- 4. DATA RECORDING PERIOD 5
- 5. FILE NAMES 5
- 6. ORACLE DATA TABLES 5
- 7. RPV POWER CURVE 6
- 8. TEST INSTRUMENTATION 6
- 9. DEVIATIONS FROM TEST PROCEDURE 6
- 10. LIST OF "NOT REACHED" INITIAL CONDITIONS 7
- 11. TEST PROCESSING 7
- 12. INITIAL CONDITIONS DATA ANALYSIS PERIOD FOR INITIAL CONDITIONS 7
ENVIRONMENT PARAhETERS 8
RPV PARAMETERS 8
DRYWELL PARAMETERS 8
SUPPRESSION CHAMBER PARAMETERS 9
GDCS PARAhETERS 10 PCCI POOL PARAhETERS 11 PCC2 POOL PARAMETERS 11 PCC3 POOL PARAhETERS 11
- 13. GRAPHS M3 Test - RPV, Drywell and Wetwell Pressures 13 M3 Test - Drywell and Wetwell Air Partial Pressures 14 M3 Test - RPV Heater Power 15 M3 Test - RPV and Drywell Temperatures 16 M3 Test - Wetwell Temperatures 17 M3 Test - PCC Lower Drum and GDCS Return Line Water Temperatures 18 M3 Test - PCC Vent Line Gas Temperatures 19 M3 Test - PCC Main Steam Line & PCC Feed Line Flows 20
~
ALPHA-601-0 page 5
PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS TEST M3
- 1. TEST OBJECTIVES:
The objectives of the PANDA integral system tests are to provide additional data to: a) confirm the capability of TRACG to predict SBWR containement system performance, including potential systems interaction effects (/ntegral System Tests) and b) demonstrate startup and long-term op-eration of a passive containement cooling system (Concept Demonstration).
The specific objective of test M3 wich was conducted with nominal post-LOCA conditions after a Main Steam Line Break is to establish the base case and demonstrate transient system response.
- 2. REFERENCE DOCUMENTS:
Test Plan:
GE document 25A5764R1 Test Procedure:
ALPHA-520-0 I
- 3. TEST DATE/ TIME:
Test Start:
03-OCT-95 / 22:58:10 Test Stop:
04-OCT-95 /19:23:20 Test Duration:
20:25:10 Test Period:
0 to 73510 see
- 4. DATA RECORDING PERIOD:
Start:
03-OCT-95 / 22:36:34 Stop:
04-OCT-95 /19:23:20 Data Recording Period:
-1296 to 73510 sec
- 5. FILE NAMES:
Raw Data:
panda _M3.dat DAS-Configuration / Channel List:
kbt99999999.ol0
- 6. ORACLE DATA TABLES:
PANDA _M3_MT_LINE PANDA _M3_MT_ POOL PANDA _M3_MT_REF PANDA _M3_MT_ VESSEL PANDA _M3_M_OTHER PANDA _M3_M_ TIME PANDA _M3_KBT INFO _ TESTS
ALPHA-601-0 page 6
PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS TEST M3
- 7. RPV POWER CURVE:
l Poweranalysis period:
20 to 73510 sec Maximum negative deviation:
Maximum positive deviation:
Standard deviation:
Power curve tolerance:
25.0
[kW)
Definition of RPV power deviation (APower) and standard deviation (c):
1" '
Power : theoretical power e
e Z MW.RP.j: rneasured power h
o=
n: # of measurements throughout the test
Mass flow rate in GDCS Return Line MV.GRT (NCR: P-007)
Air partial pressure in DW2 MPG.D2.3 Back-up instmments:
MPG.D2.1 & MP.D2.2 Pressure difference in Main Vent 2 (Hydrostatic water head at Main Vent outlet)
MD.MV2 Back-up instrument:
MD.MV1 LIST OF REQUIRED INSTRUMENTS WITH ZERO NOT IN TOLERANCE OR OVER RANGE OR UNDER-RANGE DURING TEST:
Mass flow rate under-range in Main Steam Lines MV.MSI. MV.MS2 (NCR: P-Oll)
Mass flow rate under-range in PCC2 Feed Line MV.P2F (NCR: P-012)
!.The power cune analysis has been 'pidorWd Meodt ' 6niidenng power spikes Jde to sicchini beiween rod groups (see NCR p-013) c
ALPH A-601-_0 page 7
PANDA INTEGRAL SYSTEM 'EST APPARENT TEST RESULTS TEST M3
- 9. DEVIATIONS FROM TEST PROCEDURE:
None
- 10. LIST OF DEVIATIONS FROM INITIAL CONDITIONS:
1
- 11. TEST PROCESSING PROBLEMS:
Non'e HAS THE TEST OBJECTIVE BEEN REACHED:
Yes HAVE THE DATA BEEN CORRECTLY RECORDED:
Yes
- R:ter ta Test PrNehre on 50* me ir parnal piciTuN ii 3J;uitiJin'thF DW"> i nor badd oi6iijin pi6t2 measurements. but on pressure in r:se dunn; se in e;noni w
s
ALPHA-601-3 page 8
PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS TEST M3
- 12. LNITIAL CONDITIONS DATA ANALYSIS PERIOD FOR INITIAL CONDITIONS:
j Data analysis period (in second): (-458:-398]
Initial conditions are calculated over one m nute just before connection of Drywells to RPV (phase n*113.8 of Test Procedure).
TABLE OF INITIAL CONDITIONS VARIABLE PROCESSID UNIT Average Standard Requested Tolerance Value Deviation Value ENVIRONMENT PARAMETERS:
Atmospheric pressure MP.EN bar Temperature of saturation for atmospheric pressure (T,,i_gs)
C RPV PARAMETERS:
Total pressure MP.RP.1 bar Fluid temperatures:
Spatial average Tp, n(RP)
C Local MTF.RP.1 C
MTF.RP.2 C
MTF.RP.3 C
MTF.RP.4 C
MTF.RP.5 C
r q
l
\\
l ALPHA.601-0 page 9
l PANDA INTEGRAL SYSTEM TEST APPARENT TEST dSULTS TEST M3 i
TABLE OF INITIAL CONDITIONS (Cont'd) t VARIABLE PROCESSID UNIT Average Standard Requested Tolerance Value Deviation Value i
DRYWELL PARAMETERS:
- Total pressure MP.D1 bar i
l Air partial pressure MPG.Dl.1 bar MPG.DI.2 bar i
MPG.DI.3 bar l
Air partial pressure MPG.D2.1 bar MPG.D2.2 bar
[
Gas temperatures:
l Spatial average To_rnean(D1)
C l
Local MTG.Dl.1 C
MTG.DI.2 C
MTG.DI.3 C
MTG.DI.4 C
MTG.DI.5 C
MTG.DI.6 C
]
Spatial average To_me.n(D2)
C Local MTG.D2.1 C
MTG.D2.2 C
i MTG.D2.3 C
MTG.D2.4 C
MTG.D2.5 C
MTG.D?.6 C
l l
Water level ML.D1 m
hD..D2 m
(
l
- The Drywell tot J pressures are notisdeFndaniTarTableCihey are gnen by temperatures andir pirtialiIrissures The corre;pondmg tolerance as calculated from temperature and gas parual pressure tolerances I
l l
ALPHA-601-0 page 10 PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS TEST M3 TABLE OF INITIAL CONDITIONS (Cont'd)
VARIABLE PROCESSID UNIT Average Standard Requested Tolerance Value Deviation Value SUPPRESSION CHAMBER PARAMETERS l
Total pressure MP.Sl bar l
" Air panial pressure MPG.Sl bar MPG.52 bar Water temperatures:
Spatial average Tw rneu(SI)
C j
Local MTL.S I.1 C
MTL.S t.2 C
MTL.SI.3 C
MTL.S I.4 C
MTL.SI.5 C
MTL.S I.6 C
Spatial average Tw mean(S2)
C Local MTL.S2_1 C
MTL.S2_2 C
MTL.S2_3 C
MTL.S2_4 C
MTL.S2_5 C
MTL.S2 6 C
Gas temperatures:
Spatial average To_mean(SI)
C Local MTG.S I.1 C
MTG.S t.2 C
Spatial average To_mean(S2)
C Local MTG.S2.1 C
- The Suppression Charnber air partial pressures are not indeperidarit%ablerthey are given by temperaiEies and total pressures. The correspond.
ing tolerance is calculated from temperature and total press'ee tolerances
ALPHA 6QLQ page 11 PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS TEST M3 TABLE OF INITIAL CONDITIONS (Cont'd)
VARIABLE PROCESSID UNIT Average Standard Requested Tolerance Value Deviation Value SUPPRESSION CHAMBER PARAMETERS (Cont'd)
Gas Temperatures:
MTG.S2.2 C
Local MTG.S2.3 C
MTG.S2.4 C
MTG.S2.5 C
MTG.S2.6 C
Water level ML.Sl m
GDCS PARAMETERS:
Total pressure MP.GD bar Fluid temperatures:
Spatial average Tp,.n(GD)
C
~
Local MTF.GD.1 C
MTF.GD.2 C
MTF.GD.3 C
MTF.GD.4 C
MTF.GD.5 C
MTF.GD.6 C
MTF.GD.7 C
Water level ML.GD m
PCCI PARAMETERS Water temperatures:
Spatial average Tw m n(Ul)
C Local MTL.Ul.1 C
MTL.Ul.2 C
MTL.U 1.3 C
MTL.Ul.4 C
MTL.U I.5 C
MTL.U I.6 C
MTL.U I.7 C
Water level ML.UI m
ALPHA-601-0 page 12 PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS -
TEST M3 TABLE OF INITIAL CONDITIONS (Cont'd) i VARIABLE PROCESSID UNIT Average Standard Requested Tolerance Value Deviation Value PCC2 PARAhETERS Water temperatures:
Spatial average Tw =o(U2)
C Local MTL.U2.1 C
MTL.U2.2 C
MTL.U2.3 C
MTL.U2.4 C
)
MTL.U2.5 C
MTL.U2.6 C
MTL.U2.7 C
Water level ML.U2 m
PCC3 PARAhETERS Water temperatures:
Spatial average Tw (U3)
.C Local MTL.U3.1 C
MTL.U3.2 C
MTL.U3.3 C
MTL.U3.4 C
MTL.U3.5 C
MTL.U3.6 C
MTL.U3.7 C
MTL.U3.8 C
MTL.U3.9 C
MTL.U3.10 C
MTL.U3.11 C
MTL.U3.12 C
MTL.U3.13 C
MTL.U3.14 C
MTL.U3.15 C
MTL.U3.16 C
MTL.U3.17 C
MTL.U3.18 C
MTL.U3.19 C
Water level ML.U3 m
8 Mmh &5 tS" G
T o
m$gKmA Du h M*H Nabg" mA xw 000 I
97 s
e russ m
e r
P 5
l l
e w
t e
W d
C n
E a
0 S 0
0 E i
l 9
le 3 M I
w T
yrD VPR 000 t
9 s
1 eT 3
M 0
]r 0
a 0
b
~
1
[
0 0
0 0
0 0
0 0
0 0
5 0
5 0
5 0
5 0
4 3
3 2
2 1
1 0
0
)
?.
>f r.
M3 Test - Drywell and Wetwell Air Partial' Pressures 8
[bar]
E 3.50 -
e 3.00 -
m g>
m 2.50 -
ab 6$w$
an1 2.00 --
$g m
1.50 -
m 1.00 -
-B-0.50 -
0.00 -
59b00 79000
-1000 19000 39000 TIME _SEC
1
[kW)
M3 Test - RPV Heater Power 1200 l
1000 -
m g>
800 -
N O
l 600 -
m
- o 5am g; d 400 -
"M dK man 200 -
h l
k E
-1000 19000 39000 59000 79000 h
TIME _SEC sr vi o
T >r-
=
"d rY ll Temperatures 8
L 138 E
136 -
o
~
d>
134 - I' h
a e
132 -
aa wy Px d M a
l 130 -
128 -
1 i
-2000 18000 38000 58 78000 TIME _SEC
[cj M3 Test - Wetwell Temperatures 80 78 -
o
>4>
76 -
a ae
~
n df rm 74 -
gj "d
Fr dg n
72 -
g 70
-1000 19000 39000 59000 79000
]
TIME _SEC as
m >'
$ Gx M3 Test - PCC Lower Drum and GDCS Return Line
?
[c]
Water Temperatures O
i 110 g
i 108 -
106 -
104 -
,O i
102 -
bh hOq
,00 -
~
sn n 98 -
8x 96 -
d a
94 -
~
l 92 -
90 i
i 1
-1000 19000 39000 59000 79000 TIME _SEC
hI5
?E s
m
,goh.gdrdN
>ag4 dn gEga MA =*
00
,0 87 se ru t
0 a
0 r
,0 e
8 5
p meT s
. a G
C E
e S_
0 n
0
,0 E
iL 8 M 3
I t
T neV C
C P
0 t
,0 s
08 e
1 T
3 M
00
]
0 c
~
~
2
[
0 0
0 0
0 0
2 0
8 6
4 2
1 1
'o >
i G' M3 Test - Main Steam Line & PCC Feed Line Flows 5
[g/s]
O 250 i
go M
M 200 H
]
g>h J
150 -
m e
4 db xm 100 -
bdM Fz dg n
50 -
0 -
i
-1000 19000 39000 59000 79000 TIME _SEC
- - -