f PAUL SCHERRER INSTITUT E f._

~

l".J Document No.

ALPHA-605 Document Title PANDA Transient Tests M3B Integral System Test 1

Apparent Test Results Revision Status Approval / Date Rev.

Prepared / Revised by P PM G-PM G-SQR lssue Date Remarks 1-hff J. Torbeck G. Wingate ppr vI:s n le 0

C. Aubert 11 April 96 dQ - El -

o 10 Apnf 96 10 Apnl 96 (P EAM 37,p 2)

I 9605000200 960506 PDR ADOCK 0520 4

1

ALPHA-605 Seite 2

Controlled Copy (CC) Distribution List Note: Standard distribution (cf. next page) is non-controlled CC Holder CC List Entry Return / Recall No.

Name, Affiliation Date Date

m.u.ng m246 07 i

F PAUL SCHERRER INSTITUT ALPHA-605-0 Erseta PANDA Transient Tests Titel 513B Integral System Test Apparent Test Results Ersten Autoren/

C. Auben, J. Dreier, O. Fischer, M. Huggenberger S.Lomperski, H.J. Strassberger Autorinnen 10.04.96 Summary:

This Apparent Test Results (ATR) report is compiled in accordance with the requirements specified in the Test Plan (TP) 25A5764R2 (GE document) section 10. The report covers the results for the PANDA Transient Test M3B. The ATR summarizes the apparent results and includes: test number, test objective, test date and time, data recording period, data analysis period, name of data file and ORACLE data tables, list of failed or unitvailable instruments considered to be required for the test, list of required instruments with zero or reference check points not in tolerance or in over-range or under-range during test, deviations from test proce.

dure and problems which occured during test. Statements are made whether or not the test objective has been reached and the data were recorded correctly. A table of actual initial con-ditions based on average and standard deviation over one minute time periodjust before the test start for all parameters with a specified acceptance criteria in section 9.2 of TP is provided as well as time history plots over test duration for all top priority measurements.

Ver'eder Att Empfinger/Empfingennnen Ent Abt Empfinger/Empfingemnen Ect Ent 42 G. Yadizaroglu I

GE San Jose CA secma f-l9gf l

19sLL;'*~~ ~ ~ ' '" Y pesme 6

T. Bandurski I

(for distribution at GE to j

J. Dreier i

mal 19 i

O. Fischer 1

J.R. Fitch, G.A. Wingate, J.Healzer 1

sean 22 B.S. Shiralkar, M. Huggenberger l

S. Lomperski 1

DRF No. T10-00005)

Beita;en H.J. Strassberger 1

intmaiensas:e PANDA Documentation 2

0 l1 l2 l3 l4 ls l8 l3 l^

VtSLm ADId2Cor'etJng:

ALPHA-605-0 page 4

PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS TEST M3B Contents:

Page

1. Test Objectives 5
2. Reference Documents 5

l l

3. Test Dateffime 5
4. Data Recording Period 5
5. File Names 5
6. ORACLE Data Tables 5
7. RPV Power Curve 6
8. Test Instrumentaion 6
9. Deviations from Test Procedure 6
10. List of Deviations from Requested Initial Conditions 7
11. Test Processing 7
12. Water Temperature for PCC Pool Refilling 7
13. Requested Initial Conditions 7

Data Analysis Period for Initial Conditions 7

Environment Parameters 8

RPV Parameters 8

DRYWELL Parameters 8

SUPPRESSION CHAMBER Parameters 9

GDCS Parameters 10 PCCl Pool Parameters 11 PCC2 Pool Parameters 11 PCC3 Pool Parameters 12

14. Graphs M3B Test - Vacuum Breaker Opening 13 M3B Test - RPV, Drywell and Welwell Pressures 14 M3B Test - Drywell and Wetwell Air Partial Pressures 15 M3B Test - RPV Heater Power 16 M3B Test - RPV and Drywell Temperatures 17 M3B Test - Wetwell Temperatures 18 f

M3B Test PCC Lower Drum and GDCS Return Line Water Temperatures 19 M3B Test - PCC Vent Line Gas Temperatures 20 M3B Test - Main Steam Line & PCC Feed Line Flows 21 M3B Test - PCC Pool Water Level 22

ALPHA 605-0 l

page 5

PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS TEST M3B l

1. TEST OBJECTIVES:

The objectives of the PANDA integral system tests are to provide additional data to: a) confirm the capability of TRACG to predict SBWR containement system performance, including potential systems interaction effects (Integral System Tests) and b) demonstrate startup and long-term oper-ation of a passive containement cooling system (Concept Demonstration).

The specific objective of test M3B which was conducted with nominal post LOCA conditions after a Main Steam Line Break is to establish the base case and demonstrate transient system response and repeatability.

2. REFERENCE DOCUMENTS:

Test Plan:

GE document 25 A5764R2 Test Procedure:

ALPHA 520-2

3. TEST DATE/ TIME:

1 Test Start:

31-OCT 95 /18:25:38 l

Test Stop:

Ol-NOV-95 /14:38:26 Test Duration:

20:12:48 Test Period:

0 to 72768 sec

4. DATA RECORDING PERIOD:

Start:

31-OCT-95 /18:02:22 Stop:

01-NOV-95 /14:38:26 Data Recording Period:

-1396 to 72768 sec

5. FILE NAMES:

Raw Data:

panda _M3B.dat DAS-Configuration / Channel List:

kbt99999999.ol2

6. ORACLE DATA TABLES:

PANDA _M3B_MT_LINE PANDA _M3B_MT_ POOL PANDA._M3B_MT_REF PANDA _M3B_MT_ VESSEL

]

PANDA _M3B_M_OTHER PANDA _M3B_M_ TIME PANDA _M3B_KBT l

INFO _ TESTS

. = _ _

ALPHA.605-0 page 6

PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS TEST M3B

7. RPV POWER CURVE:

Power analys' period:

20 to 20600 see and 21800 to 72768 sec Maximum negative deviation:

Maximum positive deviation:

Standard deviation:

Power curve tolerance:

25.0

[kW]

j i

Definition of RPV oower deviation (6 Power) and standard _ deviation (ch l

6 APower = Power - E MW.RP./

e Power : theoretical power e

e 1 MW.RP./: measured power h

(Power?

MW.RP./ )

(# of rnaasurements throughout the tes o=

l l

l l

l

8. TESTINSTRUMENTATION i

LIST OF FAILED OR UNAVAILABLE REQUIRED INSTRUMENTS:

l l

Air panial pressure in DW1 MPG.D 1.3 Back-up instrument: MPG.D 1.2 Air panial pressure in DW2 MPG.D2.2 (see NCR P-016)

MPG.D2.3 (see NCR P-016)

LIST OF REQUIRED INSTRUMENTS WITH ZERO NOT IN TOLERANCE OR OVER RANGE OR UNDER RANGE DURING TEST:

None

9. DEVIATIONS FROM TEST PROCEDURE:

Noae I.The power curve analysis has been performed without mcluding power spdes due to switching between rod groups (see NCR P413). This analysis does also not mclude a test pened of 1200 sea >nds (between 20600 and 21800 sech it is covered by NCR P415.

ALPHA-605-0 page 7

PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS TEST M3B

10. LIST OF DEVIATIONS FROM REQUESTED INITIAL CONDITIONS:

l

11. TEST PROCESSING j

PROBLEMS:

None i

IIAS TIIE TEST OBJECTIVE BEEN REACHED:

Yes IIAVE TIIE DATA BEEN CORRECTLY RECORDED:

Yes

12. WATER TEMPERATURE FOR PCC POOL REFILLING
13. REQUESTED INITIAL CONDITIONS DATA ANALYSIS PERIOD FOR INITIAL CONDITIONS:

Data analysis period:

-556 to -496 sec l

Initial conditions are calculated over one minute just before connection of Drywells to RPV (phase n* l23.9 of Test Procedure) l

ALPHA-605-0 page 8

PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS TEST M3B TABLE OF INITIAL CONDITIONS VARIABLE PROCESSID UNIT Average Standard Requested Tolerance Value Deviation Value ENVIRONMENT PARAMETERS Atmospheric pressure MP.EN bar Temperature of saturation for atmospheric pressure (Tsai_es)

C RPV PARAMETERS Total pressure MP.RP.1 bar Fluid temperatures:

Spatial average Tr_mean(RP)

C Local MTF.RP.1 C

MTF.RP.2 C

MTF.RP.3 C

MTF.RP.4 C

MTF.RP.5 C

Water level ML.RP.1 m

DRYWELL PARAMETERS

  • Total pressure MP.D1 bar Air partial pressure MPG.Dl.1 bar MPG.D 1.2 bar MPG.D2.1 bar MPG.D2.2 bar Gas temperatures:

Spatial average To,mean(D1)

C Local MTG.D l.1 C

MTG.D 1.2 C

MTG.D I.3 C

MTG.D I.4 C

MTG.D l.5 C

MTG.D I.6 C

  • The Drywell total pressures are not independIriiTaTr ablesTibey are given by temperarures and air partial pressures. The corresponding tolerance is calculated from temperasure and gas partid pressure tolerances.

ALPHA-605-0 page 9

PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS 1

TEST M3B TABI.E OF INITIAL CONDITIONS (Cont'd)

VARIABLE PROCESS!D UNIT Average Standard Requested Tolerance Value Deviation Value DRYWELL PARAMETERS (Cont'd)

Spatial average Tc_m an(D2)

C Local MTG.D2.1 C

MTG.D2.2 C

MTG.D2.3 C

MTG.D2.4 C

MTG.D2.5 C

MTG.D2.6 C

Water level ML.D1 m

ML.D2 m

SUPPRESSION CHAMBER PARAMETE

)

Total pressure MP.S1 bar

" Air partial pressure MPG.Sl bar MPG.S2 bar Water temperatures:

Spatial average Tw mean(SI)

C Local MTL.S t.1 C

MTL.S 1.2 C

MTL.S t.3 C

MTL.S t.4 C

MTL.S t.5 C

MTL.S t.6 C

Spatial average Tw mesn(S2)

C Local MTL.S2.1 C

MTL.S2.2 C

MTL.S2.3 C

I MTL.S2.4 C

    • De suppression Chamber er pani.il preuvres are not indepenJant =ariabicTthey are gi.'en by temperarures and total pressures The corresponJ-ing tolerance is cah:ulated from temperature and total pressure tolerances-l

ALPHA-605-0 l

page 10 l

PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS l

TEST M3B l

TABLE OF INITIAL CONDITIONS (Cont'd) l VARIABLE PROCESSID UNIT Average Standard Requested Tolerance i

Value Deviation Value SUPPRESSION CHAMBER PARAMETERS (Cont'd)

Water Temperatures:

Local MTL.S2.5 C

MTL.S2.6 C

Gas temperatures:

Spatial average Tc_.3n(SI)

C Local MTG.S t.1 C

MTG.S t.2 C

MTG.S t.3 C

MTG.S t.4 C

MTG.S t.5 C

MTO.S t.6 C

Spatial-average To,,,n(S2)

C Local MTG.S2.1 C

MTG.S2.2 -

C MTG.S2.3 C

MTO.S2.4 C

MTG.S2.5 C

MTG.S2.6 C

Water level ML.Sl m

ML.S2 m

GDCS PARAMETERS Total pressure MP.GD bar Fluid temperatures:

Spatial average Tp, 3n(GD)

C Local MTF.GD.1 C

MTF.GD.2 C

MTF.GD.3 C

MTF.GD 4 C

ALPHA-605 0 page 11 PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS TEST M3B TABLE OF INITIAL CONDITIONS (Cont'd)

VARIABLE PROCESSID UNIT Average Standard Requested Tolerance Value Deviation Value GDCS PARAMETERS (Cont'd)

MTF.GD.5 C

MTF.GD.6 C

MTF.GD.7 C

Water level ML.GD m

PCCI POOL PARAMETERS Water temperatures:

Spatial average Tw.. (Ul)

C Local MTL.Ul.1 C

MTL.UI.2 C

MTL.UI.3 C

MTL.U 1.4 C

~

MTL.UI.5 C

MTL.UI.6 C

MTL.UI.7 C

Water level ML.U1 m

1 PCC2 POOL PARAMETERS Water temperatures:

Spatial average Tw..n(U2)

C Local MTL.U2.1 C

MTI..U2.2 C

MTL.U2.3 C

MTL.U2.4 C

MTL U2.5 C

MTL.U2.6 C

MTL.U2.7 C

Water level ML.U2 m

ALPHA 605-0 page 12 PANDA INTEGRAL SYSTEM TEST APPARENT TEST RESULTS l

TEST M3B l

TABLE OF INITIAL CONDITIONS (Cont'd) l l

VARIABLE PROCESSID UNIT Average Standard Requested Tolerance Value Deviation Value i

PCC3 POOL PARAMETERS i

Water temperatures:

Spatial average Tw m,3,(U3)

C f

Local MTLU3.1 C

MTL.U3.2 C

MTL.U3.3 C

J MTL.U3.4 C

MTL.U3.5 C

MTL.U3.6 C

MTL.U3.7 C

MTL.U3.8 C

MTL.U3.9 C

MTL.U3.10 C

MTL.U3.Il C

MTL.U3.12 C

MTL.U3.13 C

MTL.U3.14 C

i MTL.U3.15 C

L I

MTL.U3.16 C

MTL.U3.17 C

MTL U3.18 C

l MTL U3.19 C

Water level ML.U3 m

i I

l

t s?0 1

,g u

o 2

2 Y gW ? m<-

E Oa Z H0s:o Fu gy veC D

000 56 g

n 00 i

  • 0 n

0 e

6 p

O r

e k

a e

rB, C

E 0

S_

m s 00 u

5 E 5 M u

IT c

a V

t s

e T

=

=

B 00 3

0 s

0 M

5 0

)

0 0

5

[

4 0

0 0

0 5

1

M3B Test - RPV, Drywell and Wetwell Pressure g

[bar]

I 4.00

?

1 S

m6 3.50 -

3.00 -

2.50 -

3z mO m>

I 2.00 -

g m ae M>

a 1.50 -

y y[

w w -<

~

1.00 -

h$

d M a

0.s0 -

0.00

-1000 19000 39000 59000 79000

' TIME _SEC

t M3B Test - Drywell and Wetweil Air Partial Pressures j

[bar]

4.00

~

3.50 -

3.00 -

t 2.50 -

g$

[

m>

2.00 -

g2 g 4 ds ame 1.50 -

M $y

$4 8?

1.00 g*

4 0.50 -

i y

0.00 --

-1000 19000 39000 59000 79000 I

o TIME _SEC f

b C; I

, >Gx?$m

, 3*

$?_

o"@ 4 2 gn 3m>bMpm05Fd Mnra 00097 0

r

,00 e

9 w

5 o

P re tae H

C E

0 S_

V 0

P

,0 E

9 R

3 M IT tse T

B 3

M 00

,0 9

1

]

0 W

00 k

1

[

0 0

0 0

0 0

0 0

0 0

0 0

0 2

0 8

6 4

2 1

1

M3B Test - RPV and Drywell Temperatures

[c]

138 136 -

o 134 -

3$S

>d

~

132 -

5, g g 58 7 mF

o A

~

&M F2 130 -

dg n

128

-1000 19000 39000 59000 79000

?>

m TIME _SEC C

x

?8 3E

M3B Test - Wetwell Temperatures

~[c]

$ Q 85 x

5; 83 -

u 81 -

1S

>9 Y

$ 3i a H*

H @b 79 -

E m am hm "M

Fx 77 -

dg n

i 75

-1000 19000 39000 59000 79000 TIME _SEC

M3B Test - PCC Lower Drum and GDCS Return Line

[c]

Water Tem.peratures 120 100 -

~

m y/

80 -

a?

s2

~

N $!

dg a

60 -

yy,

  • $d mM Fz:

d M 40 -

y I

20 --

-1000 19000 39000 59000 79000 4

TIME _SEC 3>

3$

M3B Test - PCC Vent Line Gas Temperatures 3 #

3

[c]

120 b

.y 100 -

5 Db m>

80 -

E

$H Y ?i B n a%

w g O 60 -

5xN mm F?

Y 40 -

a 20

-2000 18000 38000 58000 78000 TIME _SEC

M3B Test - Main Steam Line & Feed Line Flows

[g/s]

250 --

200 -

m>

>2 150 -

qj

%2 rn -a h bo d$

H mr 100 -

u --i m 03 W<

$Y FE dy 50 -

m G

E E

E

--1000 19000 39000 59000 79000 TIME _SEC y

t u

v-

~O

M3B Test - PCC Pool Water Level j &'

[m]

f 5.00 a8b H

4.80 -

>Z 4.60 -i m as (n

x 4.40 -

h 3$

00 Fr N

4.20 -

H 4.00 i

-1000 19000 39000 59000 79000 TIME _SEC

___ __ ___-_____________ _ ______ _ ;