9 4

l 1

OfttAtlIGIATA!!P0tt DOCitt50 50 369  !

LAtt ~bly 15,1992 ~

Oflut!NG $7ATUS

~~"~~~

CCMittt!DBT i ,A. Willians tit!!EDEI 1643135987

1. hit Inst: McGuire1
2. Reporting Period; hat 1, til2 kne 30,1992

.3.ticensedthersalPower(Mst):- 3411

(,Naseplattlating(GrossMVt): _

1305' Rctes 'tastplatt lating

$.DesignIltctricallatir.glIttNYt): 2180 (GressMVt)calculatadas .;

6.MaritusteptadableCappetty(GrossMiti: 1171 1450.000 K n x .90 power ,

7.MartiusDependahl* Capacity (IttMVt): 1129 facterperfaltill,

8. 11 Change Occur in Capaciti latings (!teti Innher 3 Through 1) Since tatt E!!G0020.

.tapert.Giveleasons:

~

0.Pcvertet:170Whichtestricted,ifArt(letMVt'

10. teason !ct itstrictions, :( sty:

ThisMonth fr. to Date Cumulative ,

11.HourslaReportingPeriod 120.0 4361.0 $2159.0 12.MutherOfHoursteacterVasCritical 196.1 207.7 61461.2

13. Reactor leserve $hutdown Betts - ~0~ -0" ~0-14.'HoursGeneratoronLine 282.5 2469.1 63750.9 15.- Unit Itstrie Shutsevn Hours ~0" ~0" ~0"

-15.GrcssthertalEnergyGenersted(MEH) 880214 80HH1 1950301H

11. Gros Iltetrical Intrgy Generated (MVB) 249107 2601254 61161011 16.Ett!!tetricaltatttiGenerated(FH) 218865 2666054 64051101 *
19. att larvice facter 39.2 56.6 68.1
20. D it Atallibiliti Iacter 39.2 56.6 68.7 21.Unitcapacityfactor(HingMDC1111_ 34.3 51.1 60.0 22.UnitCap:cityfactor(tsingt!!Ett). 32.6 51.7 58.5 23.UnitforcedOutagelate 60.8 13.4 14.3 24, thatdcyn Scheduled Over Etzt 6 Menths (Tytt, Datt, and Duration of tach):

None.

25.IfthutDeinAtIndoflepertPeriod.IstinatedCateofStartup:

26.UnitsInfestStatus{PriortoCentercialOptration): f** cast. Achieved IFIflAt'CtlTICAtlTI IIITIAtIt!CTt!C17f COMMIRCint0711A7105-9207210097 920715

{DR ADOCK 05000369-PDR

t Cf!AATINGIATAElf;1T 00CKit50 50 361 l'VIf McGuire i tATIhly15,132 ~

00KILit!D!! t.A. Willians T!!! Fell 10431556I EITI hra,1911 DA: AV!!AGI IAILY KVit itVIL LAY

~

AVIRAGI Call! F0WII LIVIL

~

lMVtEtt) (XVeitt) 1 0 11 0 2 0 18 204 3 0 19 1066 4 0 20 1115 5 0 21 1110 i 0 22 1101 _

1 0 23 1112 i _

0 2( 1115 1 0 25 514 10 0 26 121 11 0 Il __

1011 12 0 28 1105 13 0 29 1111 11 0 30 1111 15 0 16 0

l

~

DOCKET NO. 50-369 UNIT SHUTDOWNS AFD POWER REDUCTIONS UNIT NAME ra.uuixt. A DATE u , / A > / '3 4 REPORT MONTH June 1992 COMPLETED B'I n. L.. dirmvad TELEPHONE ( / v4 J .56z-3e d.s (1) (2 (3) (4) (5)

R) MET-E HOD T A OF LICENSE CAUSE AND CORRECTIVE Y S SHUT EVENT SYS ,

N TEM ! COMPONENT ACTION TO O P DURATION O DOWN REPORT CODE CODE PREVENT RECURRENCE o DATE E HOURS N R/X NO.

F 416.32 B 1 CH HTEXCH STEAM GENERATVR INSPECTION OUTAGE l 2 94 1 F B '-- HG XXX.hX HOLD FOR CHEMISTRY 8-P 92- 6-18 --

t F B -- IA INSTRU NUCLEAR INSTRUMENTATION CALIBRATION

! 9-P 92- 6-18 --

I 92- 6-25 F 21.17 H 3 IB XXXXXX REACTOR TRIP ON SOLID STATE i 3 PROTECTION SYSTEM ALARM WHEN FUSE WAS REMOVED F B HG XXXXXX SECONDARY CHEMISTRY 10-P 92- 6-26 --

l--

I (3) (4)

(1)F Forced (2)

Reason- Method: Erhibit G - Instructions for Preparation of, Data A-Equi ment Failure (Explain) 1-Manual S Scheduled B-Main enance or test 2-Manual Scram EntW Sheets For Licensee Event Report (LER)

C-Refueling 3-Automatic Scram i i

D-Regulatorv Restriction , ,

4-Other (Explain) File (NUREG-0161)

E-Operator Training & License Examination (5 F-Administrative hibit I - Same Source G-Operator Error (Explain)

H-Other (Explain) i l

1 l.

l .

DOCKET NO: 50 369 UNIT: McGuire i DATE: 7/13/92 NARRATIVE SUMPARY MONTH: June 1992 McGuire Unit 1 began the mor.th ot' June in a steam generator inspection outage. The unit was placed on line at 0819 on 6/18. During power esculation, tne unit held at 306 power from 1245 to 1530 for foodsater chemistry and nuclear instrumentation calibrations. The unit held at 604 power from 2127 to 2312 for nucicar instrumentation calibrations.

The unit held at 864 power from 6/?9 at 0151 to 0252 for nuclear instrumentation calibrations. The t. nit held at 93% from 0330 to 0358 due to the quadrant power tilt ratio being out of specification. The unit held at 984 power from 0603 to 0900 for nuclear instrumentation calibrations. The unit reached 100% full power at 1044. On 6/25 at 1313 the unit experienced a reactor / turbine trip on a solid state protection system alarm when a fused was rcmoved. The unit was pieced on line on 6/26 at 1023, During power esculation the unit held at 30%

power from 1240 to 2020 for feodwater chemistry and at 904 power from 6/27 at 0345 to 0430 for nuclear instrumentation calibraticns, The unit reached 100% full power at 0850. The unit operated at or near 100% for the remainder of the month.

Prepared by: N. C. Simmons Telephone 704 382-5263

. _ . _ . . _ . _ _ _ _ _ - _ - ~ _ _ _ _ - _ __ . _ _ -

4 MONTHLY REFUELING _INFORMATION REQ 1!E.SI S

1. Facility namot McGuire, Unit 1
2. Scheduled next refueling shutdown March 1993 j i

-3. Scheduled restart following refueling:_May 1993 i

.Ti!E PROJECT MANAGER IIAS BEEN ADVISED BY SEPARATE COMMUN? CATION Ol' ANY T.S. CilANGE OR LICENSE AMENDMENT. TilEREFORE, QUt:STIONS 4 2 TliROUGli 6 WILL NO' LONGER BE MAINTAINED IN TilIS REPORT.

-4. Will refueling or resumption of operation thoroafter requito a technical specification change or other licenso amendmont? +

If yes, what will those bo?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unroviewed safety questions?

5. Scheduied. date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (now or different design or supplier, unroviewed design or performance analysis methods, significant changos in design or new operating proceduros).
7. Number of Fuel assemblies (a) in the core: Jjl (b) in the spent fuel pool: #l9
8. Present licensed fuel pool capacity: 1161

. Size-nf-requested or planned increase: ---

9. Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 DUKE POWER COMPANY DATE: July _15 . 1992 Name of contact: R. A. Williams Phone: 704-382-534,q_

. _. . . _ - _ _ . - . _ . . _- . _ . . _ - - . - . _ . _ . . . .- ...;_-_. s

4

^

i .

OfIt1 TIE 3 IATA ttPCit D00t!! X0 $0310 0111 hly 15,1992 OfttAt!I3ITATUI C0KitttIDIf R.A.Villitas

~~~~~

TillfECEI 1043135961 1.Unitlate:McGuire2

2. Etterting fetied: hte 1,1992 Jute 30,1992
3. Liettsel ther:61 Fever (Ekt): 3(11 4.Etteplatelating(GretsKVel: 130$' Ictes 'ntteplatt lating
5. Design Iltetrical titing (Itt MVt): 1110 (GressMVt)calculatedas 6.NarirusDt;ttdthltCapacity(GrestEVt): 1171 1450.000KVA1.90; cutt
7. Maritts Lepenhble Capacity (let NVt): 1129 facterperPagtlit, l.IfChangesOccurit.Capteltytitings(1tetsluther3through7)StateLast IUt!G0020.

Itp rt. Give leasets:

9. fever Level to vtich testricted, if Aty (litt ne):

10.letschIcttestrictiets,Ifany:

ThisMenth it. to titt Cmittitt

11. Huts In tepetting fitted 120.0 4367.0 13055.0 _

12.NuthtrOfBoursteleterVascritteil 133.8 1895.8 5M97.2 13.teletottesttftShutdevnHours 0- 0-14.BoursGeneratorOnLine 129.9 1941.6 5(194.5

15. Unit itsette shuthva Hours 0- 0- 0-
16. Grcss Thet:61InergyGenerated(MvH) (03103 312(113 1168405(3
17. Grcss Electrical Intigy Generated (WB) 138326 20(3181 6181(113
18. Iet Iltett'cll 3tergy Generated (EVE) 12(216 1929568 593t1919
19. Unit 5ttficeInctet 18.0 42.2 14.2
20. Unit Attilthilit! !acter 18.0 (2.2 14.2 21.UnitCapacityfactorlUsingKDCXtt) 15.3 39,1 10.9 22.UnitCapacityfactor(Usit;O!!let) 14.6 37a 68.8 23.UnitTottedOutt;tlate 0.0 6.0 8.0 2(. Shutdown $chthled Over liett 6 Konths (Typt, tite, and Datation el hach):

,,J n n n ,_

25.11ShutDcunAtEndOflepcitFerled.EstititedD3e~01Starttp:

26.UnitsinTestStatus(PriortoCentercialOpersticD): forecast Achieved INITIALCPITICALITT IEITIAL ILICTl!CIti CCH !!CIAL 0?!AAT105 l 1

4 trilATING tktA t!K11 000117 'O $0 370 ~

tX11 M:Guire 2 IATI hly 15, Ill!

00h?t!!!D If _ R.A. Willists t!LIFEN! 1H 313 59IY ENTI htt, Ill!

DAt AVERAGI CAILY POVII LIVIL LAT- AVIRAGI CAILI POW!! LIVIL

~

(XVeNet) (KVtVeti 1 0 17 0 2 0 18 0 3 0 19 0 1 0 20 0 5 0 21 0 6 0 22 0 -

1 0 23 0 1 0 l4 0 1 0 25 50 10 0 26 15(

11 0 21 1140 12 0 18 1139 13 0 29 1142 11 0 30 1142 Il 0 16 0

~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET I.' 50-370 ~

UNIT NAES ricuvuu, 4 DATE 'o7/laf32 REPORT MONTH June 1992 COMPLE N BY re . u. diru tund .

TELEPHONE tive)-auz-azo.)

(1) (4) (5)

{2) f3 _

. E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRDICE 13 92 1 S 590.15 'B 1 ,

CH HTEXCH STEAM GENERATOR INSPECTION OUTAGE 13-P 92- 6-25 S ---

B --

HG XXXXXX SECONDARY CHEMISTRY 14-P 92- 6-26 S --

B --

IA INSTRU UUCLEAR INSTRUMENTATION CALIBRATION (1)'

F Forced (2) (3) (4)

Reason

  • Method: Exhibit G *nstructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Rgstrictior) , 4-Other (Explain) File (NUREG-Ol61))

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error (Explain) Exhibit I - Same Source H-Other (Explain)

~ _ _ _ _ . -

4 UNIT: McGuire 2 DATE: 7/13/92 NARRATIVE

SUMMARY

f HONTit: June 1992 McGuire Unit 2 began the month of June in a steam generator inspection cutage. The unit was placed on-line on 6/25 at 1400 During power esculation, the unit held at 30% power from 1805 to 2239 for feodwater chemistry. The unit held at 65% power from 6/26 at 0620 to 0645 for nuclear instrumentation calibrations and at 896 power from 1005 to 1145 for nuclear instrumentation calibrations. The unit reach 100% full power at 1640. The unit operated at or near 1.00% for the remainder of the month.

Prepared by: N. C. Simmons Telephono: 704 382-5263 l

l

MONTHLY REFUELIJQ_INFOMATION REOUESI

1. Facility name: McGuire. Unit _;L
. 2. Scheduled next refueling shutdown
June 1993
3. Scheduled restart following refueling: Auciust 1993 THE PROJECT MANAGER HAS BEEN ADV'iSED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAIbTAINED IN THIS REPORT. {
4. Will refueling or resumption of cperation thereaf ter require a j

(

technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by 1 Safety Review Committee regarding unreviewed safety questions' '

I a Scheduled date(s) for submitting proposed licensing action and 9 5.

supporting information.

4. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 14.1 j- 8. Present lice'.s,d fuel pool capacity: 1463 Size of requested or planned increase: ---
9. Projm ted date of last refueling which can be accommodated by 4

present licensed capacity: December 2003 7

DUKE POWER COMPANY DATE: July 15, 1992 Name of

Contact:

R. A, . Williams Phone: 704-382-5364 3