Text
--
1 J A // -
LICENSE AUTHORITY F1 t COP 1 g
g UNITED STATES
,]
[,
ATOMIC ENERGY COMMISSION g
g WASHINGTON. O C.
20545 d
I l
l
=
' 'rern e #
((
December 19, 1972 Docket No. 50-160 g
W-pud). 4/
1)
Georgia Institute of Technology i
Nuclear and Biological Sciences Division ATTN:
Mr. Robert S. Kirkland Reactor Supervisor Atlanta, Georgia 30332 Gentlemen:
A copy of the Notice of Proposed Issuance of Construction Permit' and Amended Facility License which is being filed with the Office of the Federal Register for publication is enclosed for your information.
The proposed issuance relates to your appli-cation received on March 11, 1968, as amended, to modify your research reactor and to its subsequent operation at 5 megawatts (thermal).
i Copies of the proposed construction permit, proposed amended license and our Safety Evaluation also are enclosed for your information.
J You will note that Section 4 of your present license relating to the allocation of special nuclear material pursuant to Section 50.60 of the Commission's regulations is not included in the proposed amended license.
As of April 1967, when private owner-ship of special nuclear material was approved, we discontinued this provision in licenses.
However, this does not mean that your contractual agreement with the Commission is void.
You will continue to work with our supplying office on the receipt and return of your special nuclear material.
From our initial review of your proposed Technical Specifications, dated May 26, 1972, and other portions of your application, we have determined that there is reasonable assurance that operation s
9604030411 960322 PDR ADOCK 05000160 H
PDR Q (, v 'r a s v r a y
W.
of the reactor at 5 megawatts (thermal) will not endanger the health and safety of the public.
However, we are still working on revisions to these specifications that are necessary to meet regulatory requirements.
You will be advised if any additional information is needed.
Sincerely, jy;,, f /gf. /2 ' "* g ' L-s,/ i
,/
Donald J. dovholt Assistant Director for Operating Reactors Directorate of Licensing Enclosures 1.
Notice of Proposed Issuance 2.
Proposed Construction Permit 3.
Proposed Operating License 4.
Safety Evaluation cc w/ enclosures and w/cy of Ga. Tech's application and all amendments thereto:
Mr. Tom Linder, Jr.
State Planning & Community Affairs Officer Bureau of State Planning & Community Affairs 270 Washington Street, S. W.
Atlanta, Georgia 30334 cc w/ enclosures 1 thru 4:
Dr. John E. Mock Science Advisor to the Governor Suite 706 225 Peachtree Street, N. E.
Atlanta, Georgia 30303 Honorable Sam Massell Mayor, City of Atlanta Atlanta, Georgia 30334