ML20101L392
| ML20101L392 | |
| Person / Time | |
|---|---|
| Site: | Neely Research Reactor |
| Issue date: | 05/02/1973 |
| From: | Ziemann D US ATOMIC ENERGY COMMISSION (AEC) |
| To: | |
| Shared Package | |
| ML20101L254 | List: |
| References | |
| NUDOCS 9604040014 | |
| Download: ML20101L392 (3) | |
Text
ew LNITED STATES ATOMIC ENERGY COPNISSION DOCKET NO. 50-160 GEOP,GIA INSTITllTE OF TECHNOLOGY NOTICE OF ISSUANCE OF CONSTRUCTION PERMIT No request for a hearing or petition for leave to intervene having been filed following publication of the notice of proposed action in the Federal Register on December 22, 1972 (37 F. R. 28312), the Atomic Energy Comission ("the Comission") has issued Construction Pemit No. CPRR-ll6 to the Georgia Institute of Technology (Georgia Tech) as proposed in that notice, except that the earliest date for completion of the modifications to the reactor has been changed from February 22, 1973, to May 22,1973. The construction permit authorizes Georgia Tech to make modifications to its existing research reactor located on its campus in Atlanta, Georgia, which are necessary for operation of the reactor at power levels up to 5 megawatts (thermal) in accordance with Georgia Tech's application received by the Comission's regulatory staff on March 11, 1968, as amended.
The Comission has found that the application for the construction permit complies with the requirements of the Atomic Energy Act of 1954, as amended ("the Act"), and the Comission's regulations published in 10 CFR Chapter I.
The Comission has made the remainder of the findings j
required by the Act and the Comission's regulations, which are set forth in the construction pemit, and has concluded that the issuance of the construction permit will not be inimical to the common defense and security or to the health and safety of the public. The Georgia Institute 9604040014 960322 PDR ADOCK 05000160 PDR
} -_ _,_ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _
90
7 e
, of Technology has satisfied the indemnification requirements of Section 170 of the Act and 10 CFR Part 140 of the Comission's regulations.
A copy of the construction permit and the Safety Evaluation dated December 19, 1972, are available for inspection at the Comission's Public Document Room,1717 H Street, N. W., Washington, D. C., or may be obtained upon request sent to the U. S. Atomic Energy Comission, Washington, D. C.
20545, Attention: Deputy Director for Reactor Projects Directorate of Licensing.
J Dated at Bethesda, Maryland, this 2nd day of May 1973.
FOR THE ATOMIC ENERGY COM4ISSION Q)W h -D r..
Dennis L. Ziemann Chief Operating Reactors Branch #2 Directorate of Licensing
l l
l i
t I
l l
AEC letter dated June 6, 1974, that amends the Facility License authorizing a licensed power level increase to 5 megawatts (thermal)
}
e 4
ENCLOSURE 9 j
5
^
.f 1
-rr m-
,.