ML20101A840
| ML20101A840 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 12/07/1984 |
| From: | Nix H GEORGIA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION (ADM) |
| References | |
| 50-366-1984-003, 50-366-1984-3, GM-84-1096, NUDOCS 8412190338 | |
| Download: ML20101A840 (2) | |
Text
'
, Georgia Power Company i Post offic) B:x 439 Baxt:y, Georgb 31513 Telephone 912 367 7781 912 537-9444 Edwin 1. Hatch Nuclear Plant Decarber 7,1984 GM-84-1096 PLANT E.
I. HATCH Special Report Docket No.
50-366 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C.
20555 Attached is Special Report No.
50-366/1984-03.
This report is required by Hatch Unit 2
Technical Specifications Section 3.5.1, ACTION c.
$HY H.C. Nix /
General Manager dd HCN/TLE/v1z xc:
R. J. Kelly G. F. Head J. T.
Beckham, Jr.
P. D. Rice K. M.
Gillespie S.
B. Tipps R. D. Baker Control Room Document Control
\\
1 8412190338 841207 PDR ADOCK 05000366 S
PDR fS 8/z
I a
SPECIAL REPORT 50-366/1984-003 LICENSEE GEORGIA POWER C0hfPANY FACILITY NAME EDWIN I. HATCH DOCKET NUh!BER 50-366 DESCRIPTION OF EVENT:
On 10/20/84 at approximately 1319 CST, HPCI was manually initiated to restore reactor water level following a
low reactor water level transient.
The low reactor water level transient resulted after Unit 2 was manually scrammed and the main steam line isolation valves were closed to repair a leak on a reactor feed pump seal water return line.
As of the date of this report, there have been twenty-six incidents with HPCI injection into the reactor vessel.