ML20100D852
| ML20100D852 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 11/29/1984 |
| From: | PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | |
| Shared Package | |
| ML20100D831 | List: |
| References | |
| NUDOCS 8412060066 | |
| Download: ML20100D852 (6) | |
Text
._
_a TABLE 4.2 E MINIMUM TEST AND CALIBRATION FREQUENCY FOR DRYWELL LEAK DETECTION Instrument Channel Instrument Functional Calibration Instrument-Test Frequency Check l
I
- 1). Equipment Drain Sump Flow Integrator
. (1)
Once/3 months Once/dayL 2)
Floor Drain Sump Flow Integrator (1)
Once/3 months once/ day 3)
Drywell Atmosphere Radioactivity (1)'
Once/3 months.
Once/ day Monitor l
I 841 h 0066 941129 DR ADOCK 05000277 PDR
y t.
,D*;
PBAPS-L 3. 2.(.. BASES (Cont ' d) trip and the other a downscale trip.
There is a' fifteen
~
7 minute delay before the air. ejector off gas isolation valve
~
is: closed' This delay is-accounted for.by.the 30-minute
. holdup time of the off gas before it is released to the stack:during reactor power operation when the recombiner.
system'is not operating.
-Both' instruments.are required for trip but'the instruments
~
.are-so' designed that any instrument failure gives a downscale trip.
The trip settings of;the instruments are set.so that the instantaneous stack release rate limit given
-incSpecification 3.8 is not exceeded.
Four sets.of two radiation monitors are provided which
' initiate the Reactor Building Isolation function and operation of the standby gas treatment system.
Four instrument-channels monitor the radiation from the refueling
. area ventilation exhaust ducts and four instrument channels imonitor the building ventilation below the refueling floor.
-Each set of instrumen* channels is arranged in a 1 out of 2 twice trip logic..
' Trip settings of'less than 16 mr/hr for the monitors in-the refueling area ventilation exhaust ducts are based upon 1
-initiating normal ventilation isolation and standby gas
~
treatment system operation so that none of the activity released during the refueling accident leaves the Reactor
' Building _via the normal ventilation path but rather all the activity is processed-by the standby gas treatment system.
Flow integrators-are used to record the integrated flow of liquid from the drywell sumps.
The integrated flow is indicative of roactor coolant leakage.
A Drywell Atmosphere Radioactivity Monitor is provided to give supporting information to that supplied by the reactor coolant leakage monitoring system.
(See Bases for 3.6.C and 4.6.C) 4 For each parameter monitored, as listed in Table 3.2.F,
- there are two (2) channels of instrumentation.
By comparing readings between the two (2) channel.s, a near continuous surveillance of. instrument performar.co is available.
Any l deviation in readings will initiate an early recalibration,
- thereby.naintaining the quality of the instrument readings.
The recirculation pump tr!p has been added at.the suggestion of ACRS as a means of limiting the consequences of the unlikely occurrence of a failure to scram during an
~ anticipated transient.
The response of the plant to this
. postulated event fall within the envelope of study events given in General Electric Company Topical Report, NEDO-10349, dated'Harch, 1971.
u
-U-
yg c'
2
+
,.c PBAPS
.^tLIMITING ' CONDITIONS FOR OPERATION ~
SURVEILLANCE REQUIREMENTS
?3.6;B. Coolant Chemistry (Cont'd) 4.6.B Coolant Chemistry (Cont'd)
Jb)
-ChlorideLConcentration Time above 0.2 ppm'
.2 weeks / year s
- Maximum /liAlt 1.0 ppm
- c);
- pH
,During; operations, if the conJuctivitylexceeds 1.0 umho/cm,
.pHishall.benmeasured and
. brought within the:5.6 to.8.6
. range within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. If the pH' cannot-be corrected, or if the pHcis~outside a range of 4 to.10,
.the unit shall be'placed in Hot Shutdown within 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />s-and in Cold' Shutdown with 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
-C.;' Coolant Leakage C.-
Coolant Leakage 31.
Any time' irradiated fuel is 1..
Reactor coolant system leakage
~
Inithe-reactor vessel and reactor.
shall be determined.by the coolant-temperature is above~
primary containment (Drywell)
(212 degrees F, the rate of.
su'mp' collection an'd flow
~
-reactor / coolant-leakage to the monitoring system and. recorded
, primary containment from unidenti-every;4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or less.
Lfied sources shall not exceed 25 gallons'per' minute.
The rate 12.
Drywell atmosphere radioactivity ofJchangelof unidentified leakage-levels shall be monitored and Lshall,not-exceed'2 gallons per recorded at least once per day.
~ ' minute per~24 hour surveillance
. period'when the reactor'is operated
.in the "Run". mode. In addition, the total' reactor. coolant system
-leakage into the~ primary contain-ment:shall not exceed 25 gpm
. averaged over any 24 hour-
' surveillance period.
+
r t
e
-146-1 f
.m PBAPS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 23.6.C. Coolant Leakage 2.
The primary containment (Drywell) cump. collection and flow monitoring cystem shall be operable during
-reactor power operation.
From and ofter the time that this system is made or found to be inoperable for cny reason, reactor power operation is_ permissible' only during the cucceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless the system is made operable. sooner.
For purposes of this paragraph, the primary containment (Drywell) sump collection and flow monitoring system operability i:s defined as the ability to measure reactor coolant leakage.
3.-
The Drywell Atmosphere Radioactivity Monitor shall be operable during reactor power operation as a supple-ment to the reactor coolant leakage monitoring system.
From and after
'the time _that.this system is made or found to be inoperable for any
. reason,-reactor power operation is permissible for up to 30 days provided garb samples of the containment atmo-ephere are obtained and analyzed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
34.. If the conditions in 1, 2, or 3 cannot be met, an orderly chutdown shall be initiated end the reactor shall be in ct least Hot Shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in Cold Shutdown Condition within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
-146a-
PBAPS 3.6.C & 4.6.C BASES.
Coolant Leakage Allowable leakage rates of coolant from the reactor coolant system have been based on the predicted and experimentally observed behavior of cracks in pipes and on the ability to makeup coolant system leakage in the event of loss of offsite ac power.
The normally expected background leakage due to equipment design and the detection capability for determining coolant system leakage were also considered in establishing the limits.
The behavior of cracks in piping systems has been experimentally and analytically investigated as part of the USAEC sponsored Reactor Primary Coolant System Rupture Study (the Pipe Rupture Study).
Work utilizing the data obtained in this study indicates that leakage from a crack can be detected before the crack grows to a dangerous or critical size by mechanically or thermally induced cyclic loading, or stress corrosion cracking or some other mechanism characterized by gradual crack growth.
This evidence suggests that for leakage somewhat greater than the limit specified for unidentified leakage, the probability is small that imperfections or cracks associated with such leakage would grow rapidly.
However, the establishment of allowable unidentified leakage greater than that given in 3.6.C on the basis of the data presently available would be premature because of uncertainties associated with the data.
For leakage of the order of 5 gpm, as specified in 3.6.C, the experimental and analytical data suggest a reasonable margin of safety that such leakage magnitude would not result from a crack approaching the critical size for rapid propagation.
Leakage less than the magnitude specified can be detected reasonably in a matter of a few hours utilizing the available leakage detection schemes, and if the origin cannot be determined in a reasonably short time, the plant should be shutdown to allow further investigation and corrective action.
A rate of change limit of 2 gpm per 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> surveillance period is specified to provide additional conservatism.
This limit is applicable to reactor operations in the "Run" mode, during which time there is little variation in primary coolaat system pressure.
The limit does not apply to the "Startup" mode since this period is characterized by large variations in system pressure and consequently, changes in measured leakage would not be indicative of system degradation.
During the limited duration of the startup phase, the 5 gpm limit will ensure the integrity of the primary coolant system.
The total leakage rate consists of all leakage, unidentified and identified, which flows to the drywell floor drain and equipment drain sumps, respectively.
Both the Drywell floor drain and the equipment drain sumps have pump-out capacitites of 50 gpm per pump.
Any one pump can therefore handle in excess of the maximum allowable total leakage of 25 gpm.
If the ability to measure pump-out flow from either of these sumps is lost, the inoperable
-156 -
=
1 o'
sump will overflow into the remaining operable sump.
The remaining operable sump pump-out flow will.then represent the total leakage rate.
During the time when one sump is overflowing, any increase in total flow will be assumed to be from an unidentified source.
This primary containment (Drywell) sump collection and flow monitoring system can provide viable measurement of reactor coolant system leakage so long as one pump and its associated flow meter are operable.
The Drywell Atmosphere Radioactivity Monitor provides supporting information to that provided by the reactor coolant leakage monitoring system.
There is no direct correlation between the radioactivity monitor indication and the leakage rate because of the uncertainties regarding coolant activity levels, source of leakage, and background radiation levels.
While the radioactivity monitors will not quantify primary coolant leakage, they would provide an early warning of.a major leak especially if there is a significant difference in the radioactivity level between the leakage source and drywell background.
0 6
0
-156a-
..--.-.