Amends 840629 Final Deficiency Rept Re Gh Bettis Actuators. Corrective Action Changed to Allow Performance of Actuator Stroke Time Tests Per Gh Bettis Recommendation.Corrective Action Should Be Completed by 850628
ML20100B474
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/12/1985
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
(NMP2L-0340), (NMP2L-340), NUDOCS 8503280360
Download: ML20100B474 (1)


Text

_ _ _ _ _ _,

og Y NIAGARA NUMOHAWK NIAGARA MOHAWK POWER CORPORATION /3OO ERIE BOULEVARD WEST. SYRACUSE N Y.13202/ TELEPHONE (315) 4741511 February 12, 1985 (NMP2L 0340)

Mr. R. W. Starostecki, Director U. S. Nuclear Regulatory Comission Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point - Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

In our letter of June 29, 1984, we submitted a final report in accordance with 10CFR50.55(e) on a problem concerning actuators furnished by G.

H.

Bettis

(#84-00-02).

As part of the corrective action, we comitted to replace seals and use Dow Corning Molykote 44 lubricant.

We would like to amend the corrective action to allow the performance of actuator stroke time tests in accordance wi th the G.

H.

Bettis' recomendation.

Any actuators that fail the test will be modified as originally stated. Corrective action should be completed by June 28, 1985.

Very truly yours, C. V. Mangan Vice President Nuclear Engineering and Licensing CVM/GG:csb (0726H) xc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 R. A. Gram, NRC Resident Inspector ProjectFile(2) 8503280360 850212 PDR ADOCK 05000410 S