Interim Deficiency Rept,Item 189 Re Inadequate Process Controls for Instrumentation Installations.Initially Reported on 841012.Evaluation Underway W/Ebasco to Determine Disposition.Final Rept Expected by 850125
ML20099J109
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/07/1984
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-288 189, NUDOCS 8411280512
Download: ML20099J109 (2)


Text

P g-~

_.1

.__e-m... -- ~s 1r Oarolina hygy Light Oompany

.e,

, j,.

P. O. Box 101, New Hill, NC 27562 November 7,1984 Mr. James P. O'Reilly NRC-238 United States Nuclear Regulatory Commission Region 11 101 Marietta Street, Northwest (Suite 2900)

Atlanta, Georgia 30323 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 - 900,000 KW - UNIT I INSTRUMENTATION INSTALLATION PROCESS CONTROLS, ITEM 189

Dear Mr. O'Reilly:

On October 12,1984, Mr. N. J. Chiangi notified the NRC (Mr. D. Verrelli) of a potentially reportable item per the provisions of 10CFR50.55(e). The NRC was informed that inadequate process controls for instrumentation installations have resulted in problems such as improper implementation of field change requests.

An evaluation effort is currently underway between Ebasco and CP&L to determine the disposition of this item. It is projected that a report on the reportability of this item will be issued by January 25,1985.

Thank you for your consideration in this matter.

Yours very truly, 9)>)F 1 M ;-L R. M. Parsons Project General Manager Shearon Harris Nuclev Power Plant RMP/rst cc:

Messrs. G. Maxwell /R. Prevatte (NRC-SHNPP)

Mr. R. C. DeYoung (NRC) 8411280512 841107 PDP ADOCK 05000400 g

PDR OFFICIAL COPY h

Wt Q 5

t q.

~

.o

- Mr. James P. O'Reilly NRC-233 bec: Mh H. R. Banks Mr. C. S. Bohanan Mr. H. W. Bowles Mr. C. Carmichael (2)

Mr. G. S. Cashell Mr. N. 3. Chiang!

Mr. A. B. Cutter Dr. T. S. Elleman Ms. S. F. Flynn Mr. G. L. Forehand Mr. 3. f. Garibaldi (Ebasco)

Mr. 3. L. Harness Mr. P. C. Hopkins Dr. 3. D. E. Jeffries Mr.1. A. Johnson Mr. L. I. Loflin Mr. R. E. Lumsden Mr. R. L. Mayton, Jr.

Mr. M. A. McDuffie Mr. S. McManus Mr. C. H. Moseley, Jr.

Mr. D. L. Nordstrom (LIS)

Mr. R. M. Parsons Mr. Sheldon D. Smith Mr. A. C. Tollison Mr. R. A. Watson Mr. M. Shannon (Westinghouse)

Mr. 3. L. Willis Mr. T. A. Baxter (Shaw, Pittman, Potts & Trowbridge)

Mr. M. F. Thompson, 3r.

Mr. S. Hinnant Mr. 3. F. Nevill File: HI/A-2D File H-X-0544 e

.