ML20099B151

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jan 1985
ML20099B151
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 01/31/1985
From: Dietz C, Harrison F
CAROLINA POWER & LIGHT CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
BSEP-85-0208, BSEP-85-208, NUDOCS 8503070338
Download: ML20099B151 (13)


Text

,

APPENDIX B AVERAGE DAILY POWER LEVEL DOCKEl NO. 050-032S UNIT BRUNSWICK UNIT i DATE 02/06/85 COMPLE1ED DY FRANCES HARRISON TELEPHONE (919)457-9521 JANUARY 1985 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MUE-NET) 1 715 17 68?

2 701 18 596 3 700 19 634 4 711 20 693 5 706 21 678 6 705 22 674 7 703 23 672 8 703 24 638 9 701 25 -it 10 698 26 -4 11 696 27 488 12 694 28 656 13 695 29 667 14 692 30 660 15 690 31 659 16 688 i.16 - 8 8503070338 850131 PDR R ADOCK 05000324 PDR p.s' q i

}

m. ._. ___ - . - _ . _.- _ _ __ -- ... __. _ _ . . . . _ _ _ _ _ . . . _ _ . _ _

OPERATING DATA REPORT DOCKET NO. 050-0325 DATE 02/06/85 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STATUS

]

1. UNIT NAME: BRUNSWICK UNIT $ i NOTES I
2. REPORTING PERIOD; JANUARY 85 I i

-3. LICENSED THERMAL POWER (MWT) 2436 I i

4. NAMEPLATE RATING-(GROSS MWE): 867.0 l l
5. DESIGN ELECTRICAL RATING (NET MWE) 821.0 1 1
6. MAX DEPENDABLE CAPACITY (GROSS MWE)- 815.0 i i
7. MAX DEPENDABLE CAPACITY (NET MWE) 790.0 ----------------------------- -
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

4 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)

10. REASONS FOR RESTRICTION IF ANY THIS YR TO CUMUL MONTH DATE ATIVE
11. HOURS IN REPORTING PERIOD 744.00 744.00 69049.00
12. NUMBER OF HOURS REACTOR CRITICAL 711.52 711.52 44133.38 13.-REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10
14. HOURS GENERATOR ON LINE 696.97 696.97 41585.80 15'. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWM) 1437179.59 1437179.59 05486376.51
17. GROSS ELEC. ENERGY Gt04. (MWH) 484531.00 484531.00 28226628.00
18. NET ELEC. ENERGY GENERATED (MWH) 469990.00 469998.00 27115781.00
19. UNIT SERVICE FACTOR 93.68 93.68 60.23
20. UNIT AVAILABILITY FACTOR 93.68 93.68 60.23
21. UNIT CAP. FACTOR (USING MDC NET) 79.96 79.96 49.71
22. UNIT CAP. FACTOR (USING DER NET) 76.94 76.94 47.83
23. UNIT FORCED OUTAGE RATE 6.32 6.32 20.81 24.-SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)-

REFUELIhG 04-01-85 30 WEEKS

25. IF-SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) FORCAST ACHE [VED INITIAL CRITICALITY -------- -------

INITIAL ELECTRICITY - - - - - - - - - - - - -

COMMERCIAL OPERATION ----- -- --------

APPENDIX DOCKET NO.: 050-0325 UNIT: Brunswick 1 DATE: February 1985 COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT 1 Brunswick. Unit 1 operated at a 93.68% availability factor for the month of January with a 79.96% capacity factor. There was one scram and one power reduction. Details are in Appendix D, Unit Shutdowns and Power Reductions log.

There are 656 BWR and 160 PWR spent fuel bundles in the Brunswick Unit 1 fuel pool.

4 8

+

DOCKET NO. 150-032s UNIT SHUTDOWNS AND P WER REDUCTIONS UNIT N AME Brim swi ck i DATE February 1985 COMPLETED BY Frances 11n rri ann REPORT MONTH January 1985 TELEPHONE (9141457-9s?1

-  : c W

-, [7 'b j5'5 Licensee 5 r, g*. Cause & Corrective

^'""'"

Darc i 3g 4 255 Event g7 EU Prevent Recurrence H

f: 5 j ;f, g Report e vi U g

d5 85-002 850118 S 00 B 5 NA Power reduction-I6C working on stator cooling pressure control valve. .

I 2 3 4 F: Forced Reason: Method: Exhibit G . instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram- Entry Sheets for Licensee C. Refueling 3 Automatic Scram. Event Report (LER) File INUREG-D-Regulator > Restriction 0161)

E-Operator Training & License Examination 4-Continuations F Administrative 5-Load Reductions s GOperational Error IExplain) (,-Other Exhibit i . Same Source (9/77) Il-Ot her (E xplain)

4 DOCKET NO. '.050-032s UNIT SHUTDOWNS AND PDWER REDUCTIONS UNlrNAME Brunswick 1 DATE Februnry 1985 COMPLETED BY Frnneen Hnvriann REPORT MONTH Janunrv 1995 TELEPHONE (9191457-os91

\ _ ~h a

-, [] 'h j5'E Licensee p, *". Cause & Corrective W Daic i 3? j ji5 Event g7 ^'""'"

  • j= s j ;f, g Report e mV gEU. Prevent Recurrence 6

85-003 850124 F 47.03 A 3 NA .

. Reactor scram-turbine stop valve fast ,

closure due to loss of vacuum.

I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1. Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C. Refueling 3. Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 0161)

E-Operator Training & License Examination 4-Continuat. ions F. Administ rative 5-Load Reductions 5 G-Operational Error (Explain) (,-Other Exhibis 1 - Same Source (9/77)~ II Oiher (Explain)

OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 02/06/85 COMPLETED BY' FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STATUS 1

i ~. UNIT NAME: BRUNSWICK UNIT 2 i NOTES I

2. REPORTING PERIOD: DECEMBE' 84 1 1
3. LICENSED THERMAL POWER (hWT)- 2436 i I
4. NAMEPLATE RATING (GROSS MWE)' 867.0 t i
5. DESIGN-ELECTRICAL RATING (NET MWE) 821.0 1 1
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 l l
7. MAX DEPENDABLE CAPACITY (NET MWE) 790.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONIH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.00 0704.00 00329.00
12. NUMBER OF HOURS REACTOR CRITICAL 373.07 2650.10 47377.52
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 321.60 2239.60 44025.07
15. UNIT RESERVE SHUT))OWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) ~713582. 3S 4534146.29 83110067.31
17. GROSS ELEC. ENERGY GEN. (MWH) 237764.00 1492006.00 27601704.00
10. NET ELEC. ENERGY GENERATED (MWH) 227242.00 1392656.00 26420474.00
19. UNIT SERVICE FACTOR 43.24 25.50 54.81
20. UNIT AVAILABILITY FACTOR 43.24 25.50 54.81
21. UNIT CAP. FACTOR (USING MDC NET) 38.66 20.07 41.63
22. UNIT CAP. FACTOR (USING DER NET) 37.20 19.31 40.06
23. UNIT FORCED OUTAGE RATE 56.76 23.21 16.37
24. SHUTDOWNS'SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP
26. UNITS IN TEST STATUS'(PRIOR TO COMMERCIAL OPERATION) FORCAST ACHEIVED INITIAL CRITICALITY --- -

INITIAL ELEClRICITY --------

COMMERCIAL OPERATION -------- --- ---

1.16 - 9

r

~

. APPENDIX E AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 UNIT BRUNSW1CK UNIT 2 DATE~02/06/95 COMPLETED DY FRANCES HARRISGN TELEPHONE (919)457-9521 JANUARY 1905 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 785 17 709 2 702 18 709 3 602 19 776 4 168 20 781 5 660 21 781 6 687 22 783 7 783 23 787 8 785 24 787 9 706 25 787 10 786 26 766 11 770 27 704 12 728 28 785 13 706 29 787 14 709 30 786 IL 772 31 706 16 792 1.16 0

  • ~ OPERATING DATA REPCRT I

DOCKET NO. 050-0324 DATE 02/06/85 COMPLETED BY FRANCES HARRISO4 TELEPHONE (919)457-9521 OPERATING ~ STATUS

i. UNIT NAME: BRUNSWICK _ UNIT 2 i NOTES -1
12. REPORTING-PERIOD: JANUARY 85 I i
3. LICENSED THERMAL POWER (MWT)' 2436. l l
4. NAMEPLATE RATING (GROSS MWE)- 867.0 1 1

.5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 t i

6. MAX. DEPENDABLE CAPACITY (GROSS MWE): 815.0 l l
7. MAX' DEPENDABLE CAPACITY-(NET MWE)- 790.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONSt
9. POWER' LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)
10. REASONS FOR RESTRICTION IF ANY:

TilIS (R 10 CUMUL MONTH DATE ATIVE ii. HOURS IN REPORTING PERIOD 744.00 744.00 01073.00

12. NUMBER OF HOURS REACTOR CRITICAL 744.00 744.00 40121.52
13. REACTOR RESERVE SHUTDOWN HRS .00 ,00 .00 14, rl0URS GENERATOR ON LINE ?20.40 720.40 44753.55
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1700487.63 1708407.63 84819354.94 i
17. GROSS ELEC. ENERGY GEN. (MWH) 573279.00 573279.00 20174983.00 iB'. NET ELEC. ENERGY GENERATED (MWH) 557137.00 557137.00 26977611.00
19. UNIT SERVICE FACTOR 97.91 97.91 55.20
20. UNIT AVAILABILITY FACTOR 97.91 97.91 55.20
21. UNIT' CAP. FACTOR-(USING MDC NET) 94.79 94.79 42.12
22. UNIT. CAP. FACTOR (USING DER NET) 91.21 91.21 40.53
23. UNIT. FORCED OUTAGE RATE 2.09 2.09 16.17
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)-
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)- FORCAST ACHEIVED ,

INITIAL CRITICALITY -------- ------~~

INITIAL EL.ECTRICITY - - - - - - - --- --

l COMMERCIAL OPERATION -------- - - - - - - - -

l 1.16 -9

APPENDIX DOCKET NO.: 050-0324 UNIT: Brunswick 2 DATE: February 1985 COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT 2 Brunswick Unit 2 operated at a 97.91% availability for the month of January with a 94.79% capacity factor. There was one reactor recirculation pump trip and two power reductions. Details are in Appendix D, Unit Shutdowns and Power Reductions Log.

There are 608 BWR and 144 PWR spent fuel bundles in the Brunswick Unit 2 fuel pool.

DOCKET NO. ' 050-0324 .

UNIT SHUTDOWNS AND P WER REDUCTIONS UNIT NAME Brunswick 2 DATE Februnrv IqRs ~

COMPLETED gy Frances Harrison REPORT MONTH January 1985 TELEPHONE (919)457-9521

~= -,",

i : c jg  %. Cause & Currective

-, i2 s f E ;:; Licensee g

5. '8 Actirn to N" D C i 55 4 .ig s 5 Event u7 AU V
  • jE 5 jgg Repius e Prevent Recurrence c5 85-003 850103 F 13.5
  • 1' 6 NA Trip 2A reactor recirculation mg carsed by inadvertent bumping of -

temperature switch B32-5002A-TS-4 which trips the mg on drive motor.

  • personnel error y y 4 F: Forced Reason Method: Exhibit G Instructions A Equipment Failure (Explain) 1 -Manual for Preparation of Data S Scheduled Entry Sheets for Licensee B Maintenance of Test 2-Manual Scram.

C Refueling 3 Automatic Scram. Event ReporI(LER) File (NUREG-D Regulatory Restriction 0161)

E-Operator Training & License Examination I-Continuations l

F Administrative 5-Load Reductions 5 G-Operational Error (Explain) 6-Other Exhibit 1. Same Source (9/77) Il-Other ( E xplain!

DOCKET NO. ~050-0324 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME Brunswiek 2 DATE Februarv 14Rs COMPLETED BY Frances Harrison REPORT MONTH Januarv 19Rs TELEPHONE (9191457-95?1

n. Cause & Corrective
, {,  ;

h5 Licensee h  ? Action to W Daic i 3? { 255 Event u?

H f $ j ;f, g Report e mO g Prevent Recterence 6

85-006 850111 S 00 B 5 NA .

Reduced power to 90% for E bus degraded

  • voltage test.

I I 2 3 4 i F: Forced Reason: Method: Exhibit G - Instructions S- Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data

[ Entry Sheets for Licensee B Maintenance of Test 2-Manual Scram.

C-Refueling 3 Automatic Scram- Event Report (LERI File INUREG-D Regulator) Resttiction - 0161)

E-Operator Training & License Examination 4-Continuations F Administrative 5-Load Reductions 5 G Operational Error IExplain) 6-Other Eshibit I- Same Source (9/77) Il-Othe r IE splain)

4-UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0U4 UNIT NAME Brunswick 2 DATE February 1985 COMPLETED BY Fenncoe Pnvriann REPORT MONTH Ynnnnrv ioG5 TELEPHONE (919)457-9521 "k

u, =

c r, 3 . - E

, .2 E E ,E4 Lkensee g r, ge., Cause & Corrective No. Date g 3g j jg5 Event s'? 6' Action to

$: 5 ~~

e @ =f Repor # VT U  ! '8 u

Pievent Recurrence 6

35-007 850115 F 00 B 5 LCO-A2-85-097 Reduced power-unlocked B reactor recirculation pur:p scoop tube.

4 i

1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 016I)

E-Operator Training & License Examination 4-Continuat. ions F-Administrative 5-Load Reductions 5 G4hwrational Error (Explain) 6-Other Exhibit 1 - Same Source (9/77) Ilother(Esplain)

. , t , 1 8' .s. .e a 4 ....l... , . s - l.a -4 s--- ~ ~-e- < a s,. e - -~~ *

'- #*"**~iL

<> i:V

~

~

Carolina Power & Light Company enem:rmr:rres:r=: :-

Brunswick Steam Electric Plant ,

P. O. Box 10429 7 Southport, NC 28461-0429 February 6, 1985 FILE: B09-13510C SERIAL: BSEP/85-0208 Mr. R. C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 LICENSE NOS. DPR-71 AND DPR-62 DOCKET NOS. 50-325 AND 50-324 MONTHLY OPERATING REPORT

Dear Mr. DeYoung:

In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of January 1985.

An integrator reading error which occurred in December 1984 necessitates an 11 MW correction to lines 17 and 18 of the Unit 2 report for that month.

  • corrected copy of the report is included for your records.

Very truly yours, biQ C. R. Dietz, General Manager Brunswick Steam Electric Plant FH/vt/LETCG Enclosures cc: Ms. J. C. Baker Mr. S. W. McDowell Mr. M. R. Beebe Mr. J. P. O'Reilly Mr. J. L. Harness INPO 9M L_

9@