BSEP-85-0208, Forwards Monthly Operating Repts for Jan 1985 & Corrected Monthly Operating Rept for Unit 2 for Dec 1984
| ML20112A847 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 02/06/1985 |
| From: | Dietz C CAROLINA POWER & LIGHT CO. |
| To: | Deyoung R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20112A850 | List: |
| References | |
| BSEP-85-0208, BSEP-85-208, NUDOCS 8503180478 | |
| Download: ML20112A847 (1) | |
Text
P CiPE Carohna Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 February 6,1985 FILE: B09-13510C SERIAL: BSEP/85-0208 Mr. R. C. DeYoung, Director Office of Inspection and Enforcement U.S. Nucicar Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 LICENSE NOS. DPR-71 AND DPR-62 DOCKET NOS. 50-325 AND 50-324 HONTHLY OPERATING REPORT
Dear Mr. DeYoung:
In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of January 1985.
An integrator reading error which occurred in December 1984 necessitates an 11 MW correction to lines 17 and 18 of the Unit 2 report for that month.
A corrected copy of the report is included for your records.
Very truly yours, dig C. R. Dietz, General Manager Brunswick Steam Electric Plant FH/vt/LETCG Enclosures cc:
Ms. J. C. Baker Mr. S. W. McDowell Mr. J. P. O'Reilly Mr. M. R. Beebe Mr. J. L. Harness INPO
., y,1, j
g[
w
,.s..a '-
9)l-
'W
&m 1
Ccit G503100478 850206 PDR ADOCK 05000324 R