Second Part 21/deficiency Rept,Item 178 Re Guyon Alloys,Inc Stainless Steel sock-o-lets & weld-o-lets Not Supplied Per Nca 3800.Of 139 Fittings received,132 Returned to Vendor. Final Rept by 841115
ML20098E533
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/14/1984
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-267, REF-PT21-84-462-000 178, PT21-84-462, PT21-84-462-000, NUDOCS 8409280617
Download: ML20098E533 (4)


Text

_ __ _ __ __ _

. e 6

Cp&L #

Carolina Power & Light Company '$

j9 SLf li 5 I.IU P.O. Box 101, New Hill, N.C. 27562 i-September 14, 1984

(

I Mr. James P. O'Reilly NRC-267 f- United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 2900) f Atlanta, Georgia 30323 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 - 900,000 KW - UNIT 1 SOCK 0LETS AND WELD 0LETS -

QUESTIONABLE STARTING MATERIAL, ITEM 178

Dear Mr. O'Reilly:

Attached is our second interim report on the subject item which was deemed reportable per the provisions of 10CFR50.55(e) and 10CFR, Part 21, on June 19, 1984. CP&L is pursuing this matter, and it is currently projected that corrective action and submission of the final report will be accomplished by November 15, 1984.

Thank you for your consideration in this matter.

Yours very truly, W

R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/ jam Attachment cc: Messrs. G. Maxwell /R Prevatte (NRC-SHNPP)

Mr. R. C. DeYoung (NRC)

, n hM4 a T, r? PY

g. p, 8409200617 840914

, PDR ADOCK 05000400 ;I t. ,

c; PDR "g v, -

qI '~t ;

1 l

CAROLINA POWER & LIGHT COMPMY j

~

SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 SECOND INTERIM REPORT SOCK 0LETS AND WELD 0LETS -

QUESTIONABLE STARTING MATERIAL ITEM 178 SEPTEMBER 14, 1984 REPORTABLE UNDER 10CFR50.55(e) AND 10CFR21

SUBJECT:

Shearon Harris Nuclear Power Plant, Unit No. 1, 10CFRS9.55(e)'and 10CFR, Part 21 reportable

. deficiency. Stainless steel sockolets and weldolets not supplied in-accordance with NCA_3800.

ITEM: 1" and 1/2" ASME III Code Class 2 Weldolets and Sockolets.-

-SUPPLIED BY: Guyon Alloys, Inc., 950 S. 4th St., Harrison, New Jersey 07029 NATURE OF DEFICIENCY: Bonney Forge, the fitting manufacturer, performed an

-internal review and found that the material was not supplied in accordance with NCA 3800. (The mill test report was not verified by Bonney Forge testing.)

DATE PROBLEM OCCURRED: CP&L was notified by Guyon Alloys on May 29, 1984 that the documentation was deficient.

DATE PROBLEM REPORTED: On June 19, 1984, CP&L (Mr. K. V. Hate') notified the NRC (Mr. A. Hardin) that this item was reportable per the provisions of 10CFR50.5S(e) and 10CFR, Part 21.

SCOPE OF PROBLEM: 139 each 1" and 1/2" weldolets and sockolets.

SAFETY IMPLICATION: Since the documentation does not meet ASME Code requirements, the potential exists for failure if the fittings are installed in an ASME Class 2 or 3 line.

REASON DEFICIENCY IS REPORTABLE: The materials were incorrectly qualified as ASME Class 2.

1 I

i L

= ,

o, CORRECTIVE ACTION: Of the 139 fittings received, 132 have been returned to the vendor. Four (4) each have been scrapped, two (2) each have been downgraded for use in Non-ASME lines, and one (1) each has not been accounted for yet; however, a search for this fitting is continuing.

The three (3) heat numbers in question are represented in the 132 fittings returned to the vendor. Bonney Forge has notified CP&L that the required chemical overchecks have now been performed.

CP&L is currently awaiting Guyon Alloys' review and acceptance of these test results.

l FINAL REPORT: The final report on this item is pending notification from Guyon Alloys on the acceptability of the chemical overchecks performed. The final report is projected to be issued by November 15, 1984.

_ - _ - _ _ _ _ _ _ _ _ _ _ - _ . _ _ _ _ - _ _ .