Proposed TS 3.10.3 & 3.10.4 Re Reactor Trip Setpoints for intermediate-range Channels & power-range Channels
ML20097F334
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 06/08/1992
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20097F331 List:
References
NUDOCS 9206150253
Download: ML20097F334 (5)


Text

__ ___ __ _ _ _ _ _ _ _______-________-___ -._

4 Attachment 1 I

e i

Completed Version of Proposed Changes North Anna Units 1 and 2 Virginia Electric and Power Company 9206150253 9U M :

PDR ADOCK 0500G138

~P FDR

' SPECIALTEST EXCEETO43

- PHYSICSTESTS UMITING CONDITION FOR OPERATION -

3.10.3 The limitations of Specifications 3.1.1.4, 3.1.3.1, 3.1.3.5_ and 3.1.3.6 may be suspended during the performance of PHYSICS TESTS provided:

a. The THERMAL POWER does not exceed 5% of RATED THERMAL POWER, l
b. The reactor trip setpoints on the OPERABLE Intermediate Range Channels are set at less than or equal to 35% of RATED THERMAL POWER, and -
c. The reactor trip setpoints on the OPERABLE Power Range Channels are set at less than or equal to 25% of RATED THERMAL. POWER.

AEPLICABILITY: MODE 2.

ACTD t With the THERMAL POWER > 5% of RATED THERMAL POWER,immediately open the '

reactor trip breakers.

SURVEll' ANCEREQUIREMENTS 4.10.3.1 The THERMAL POWER shall be determined to be s.5% of RATED THERMAL POWER at least once per hour during PHYSICS TESTS.

5 4.10.3.2 Each intermediate and Power Isange Channel shall be subjected to a CHANNEL FUNCTIONAL TEST within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to initiating PHYSICS TESTS.

NORTH ANNA - UNIT 1. 3/4 10 3

-l

L SPECIALTEST EXCEPTIONS REACTORCOOUNrLOOPS UMITING CONDITION FOR OPERATION 3.10.4 The limitations of Specification 3.4.1.1 may be suspended during the performance of startup and PHYSICS TESTS provided:

a. The THERMAL POWER does not exceed the P 7 Interlock Setpoint, l

, b. ~ The reactor trip setpoints on the OPERABLE Intermediate Range Channels are set at less thsn or equal to 35% of RATED THERMAL POWER, and

c. The reactor trip setpoints on the OPERABLE Power Range Channels are set at less than or equal to 25% of RATED THERMAL POWER. P

] d APPLICABILITY: During operation below the P 7 Interlock Setpoint.

ACTION.

- With the THERMAL POWER greater than the P 7 Interlock Setpoint, immediatel; open the reactor trip breakers.

SURVEILUWCE REQUIREMENTS 4.10.4.1 The THERMAL POWER shall be determined to be less than P 7 Interlock Setpoint at least once per hour during startup and PHYSICS TESTS.'

4.10.4.2 Each Intermediate, Power Range Channel and P 7 Interlock shall be subjected to a CHANNEL FUNCTIONAL TEST within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to initiating startup or PHYSICS TESTS.

NORTH ANNA - UNIT 1 3/4 10 4 k

SPECIALTEST EXCEPTIONS PHYSICSTESTS UMITING CONDITION FOR OPERATION i

3.10.3 The limitations of Specifications 3.1.1.4, 3.1.1.5, 3.1.3.1, 3.1.3.5 and 3.1.3.6 may be suspended during the perfonnance of PHYSICS TESTS provided:

a. . TheTHERMALPOWERdoesnot exceed 5%of RATEDTHERMALPOWER, l
b. The reactor trip setpoints on the OPERABLE Intermediate Range Channels are set at less than or equal to 35% of RATED THERMAL POWER, and -
c. The reactor trip setpoints on the OPERABLE Power Range Channels are set at less than or equa! to 25% of RATED THERMAL POWER, and
d. The Reactor Coolant System lowest operating loop temperature (Tavg) is; l

' greater than or equal to $310F,

- APPLICABILITY: MODE 2.

ACTION.

a. With tha THERMAL POWER greater than 5% of RATED THERMAL POWER, immediately open the reactor trio breakers,
b. With_ a Reactor Coolant System operating loop temperature (Tavg) less than 531_OF, restore Tavg to_ within its limit within 15 minutes or be'in at least HOT STANDBY within the next 15 minutos.

- SURVEILLANCE REQUIREMENTS

'4.10.3.1 The THERMAL POWER shall be determined to be less than or equal to 5% of-

' RATED THERMAL POWER at least once per hour during PHYSICS TESTS."

4.10.3.2 Each Intermediate and Power Range Channel shall be subjected to a CHANNEL FUNCTIONAL TEST. within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to initiating PHYSICS TESTS.

4.10.3.3 : The Reactor Coolant System temperature (Tavg) shall bo determined to be i greater than or equal to 5310F at least once per.30 minutes during PHYSICS TESTG.

NORTH ANNA- UNIT 2 - 3/41103 -

1 L_i-_= - _ _ _. _ __ _ - - _ - . _ _ - _ _ . __

e . ..

4 SPECIALTEST EXCEPTIONS .

REACTORCOQUWTLOOPS UMITiNG CONDITK)N FOR OPERATION 3.10.4 The limitations of Specification 3.4.1.1 may be suspended during the

. performance of startup and PHYSICS TESTS provided:

a. The THERMAL POWER does not exceed the P4 Interlock Setpoint, l
b. ~ The reactor trip setpoints on the OPERABLE Intermediate Range Channels are set at less than or equal to 35% of RATED THERMAL POWER, and
c. The reactor trip setpoints on the OPERABLE Power Range Channels are set at 1 iess than or equal to 25% of RATED THERMAL POWER.

T APPLICABILITY: During operation below the P.7 Interlock Setpoint.

ACTIOtt

- With the THERMAL. POWER greater than the P-7 Interlock Setpoint, immediately open -

the reactor trip breakers. '

SURVElLLANCE REQUIREMENTS .

4.10.4.1 The THERMAL POWER shall be determined to be less than P 7 luterlock' Setpoint at least once per hour during startup and PHYSICS TESTS.-

4.10.4.2 Each Intermediate, Power Range Channel and P 7 Interlock shall be subjected to a CHANNEL FUNCTIONAL TEST within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to initiating startup or PHYSICS TESTS.

1 G-l NORTH ANNA- UNIT 2 3/4 10 4- ,

- _ - _- -__ _ - _ - - - - - - - -- - -