ML20096F401
| ML20096F401 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 01/15/1996 |
| From: | Rainey G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20096F404 | List: |
| References | |
| NUDOCS 9601230372 | |
| Download: ML20096F401 (1) | |
Text
.
Poech Gottsm At:mic Prwsr Etition
. g-4 y
PECO ENERGY sc n ; s "*""
c Delta. PA 17314 9739 717 456 7014 January 15,1996 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:
Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of December 1995 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.
Attached to this month's report is a correction to Peach Bottom Unit 3 reactor critical hours for August 1995 and October 1995. We regret any inconvenience this may cause.
Sincerely, l
Gerald R. Rainey Vice President, Peach Bottom Atomic Power Station
@ J6f4 GRR/TNM/JGH:lph enclosures cc:
R.A. Burricelli, Public Service Electric & Gas W.P. Dornsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L Schmidt, USNRC, Senior Resident Inspector H.C. Schwemm, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center 23r/5p 9601230372 960115 PDR ADOCK 05000277 R
ppR
[ HAY ccn 96-14004 4I