ML20096D649
| ML20096D649 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 12/31/1995 |
| From: | Robert Williams DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20096D660 | List: |
| References | |
| NUDOCS 9601190210 | |
| Download: ML20096D649 (12) | |
Text
.
' OPERATIN6 DAIA REPOR!-
1 DOCKET NO 50-369 ETIJanuary 15. 1996 OPERATIMBSTATUS COMPLETED BY R.A. Willines TELEPHONE 704-392-5346
- 1. Unit Neee McGuire !
- 2. Reporting Period December 1,1995-December 31,1995
- 3. Licensed Thersal Power (MWt):
3411-
- 4. haseplate Rating (6ross itWelt 1305e
. Notes eNaseplate Rating
- 5. Design Electrical Rating (Net MWel 1190 (6ross MWe) calculated as
- 6. Maxieue Dependable Capacity (Bross MWel:
!!71 1450.000 MVA
.90 power
- 7. Marious Dependable Capacity (Net MWe):
!!29 factor per Page 111,.
-8.IfChangesOccurinCapacityRatings(1teesNumber3Through7)SinceLast
.NURE6-0020.
Report. Give Reasons:-
r
- 9. Power Level To Which Restricted, if Any (Net MWe):
- 10. Reason for Restrictions, if any:
i ThisMonth Yr.-to-Date Cueulative
- 11. Hours in Reporting Period 744.0 8760.0 123456.0
- 12. Nueber Of Hours Reactor Was Critical 317.6 8079.9 88439.3
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
- 14. Hours Eenerator On-Line 316.0 B018.9 87531.6
- 15. Unit Reserve Shutdown Hours
--0--
- --0--
- 16. Srpss Thereal Energy Generated (IMil 999198 26931676 274754102
- 17. Bross Electrical Energy Generated (MWHI 346710 9223557 94375280
- 19. Net Electrical Energy Generated (MWH) 329794 8860203 90167571
- 19. Unit Service Factor 42.5 91.5 70.9
- 20. Unit Availability Factor 42.5 91.5 70.9
- 21. Unit Capacity Factor (Using MDC Net) 39.3 89.6 63.7
- 22. Unit Capacity Factor (Using DER Net) 37.6 85.7 61.9 e
- 23. Unit Forced Outage Rate 0.0 3.8 13.6
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Eachl:
Currentiv Refueling
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup January 24. 1996
- 26. Units In Test Status (Prior to Coseercial Operation):
Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIALDPERATION 9601190210 960115 PDR ADOCK 05000369 R
3--
~.
h s
SPERATIN6 M TA REPORT t
DOCKET No 50-369 h
IMIT licGuire 1 MTE3anuarv 15. 1995 ColFLETE8 BY R.A. Willians TELEPHONE 7M-382-5346 I
N0l!TH December. 1995 El AVERAGE MILY POWER LEVC.
H1 AYERAGE MILY POER LEVEL i
(flue-Net)
.fluie-flet)
+
1
!!!8 17 0
i 2
1099 18 -
0 i
3 1099 19 0-t 4
1094 20 0
l 5
1079 21 0
6 1077 22 0
-7 1069 23 0
l 8-1063 24 0
9 1063 25 0
l 10 1051 26 0
11 -
IM7 27.
O j
12 1037 28 0
13.
'977 29 0
l 14
'0-30 0
l l-
- 13 '
0 31 0
h
- 16 0
1 i'li l
UNIT' SHUTDOWNS AND POWER' REDUCTIONS' DOCKET NO. 369 UNIT NAME m u y u u se.; 1 DATE ul/1d/yd REPORT MONTH December 1995 COMPLETED BY x.
a.
vuilliams TELEPHONE (sus)-Juz-daed (1)
(2)
(3)
(4)
(5)
^
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
-HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 6
95-12-14 S
427.98 C
1 RC FUELXX END-OF-CYCLE 10 REFUELING OUTAGE (1)
(2)
(3)
(4)
~
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equi 6 ment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent w Sneets For Licensee C-Refueling 3-Automatic Scram Event Re G-0161))
rt (LER D-Regulatory Restriction 4-Other (Explain)
File (
E-Operator Training & License Examination F-Administrative (5)
(Explain) (Explain)
G-Operator Error Exhibit I - Same Source H-Other
- DOCKET: 50-369 UNIT: McGuire 1 -
Date:
01/15/96 NARRATIVE
SUMMARY
MONTH: December 1995 McGuire Unit I began the month of December operating at approximately 98% full power. The unit began power coast down and was removed from service on 12/14/95 at 0401 to begin end-of-cycle 10 refueling outage. The unit was in the refueling outage the remainder of the month.
Prepared by: R. A. Williams -
- Telephone:(704)- 382-5346
l MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name:
McGuire. Unit 1 2.
Scheduled next refueling shutdown: Currently Refueling 3.
Scheduled restart following refueling: Januarv 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF.
ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pool: 221 8.
Present licensed fuel pool capacity: J_4fil Size of requested or planned increase: :: :
9.
Projected date oflast refueling which can be accommodated by present license capacity: March
- g...
DUKE POWER COMPANY DATE: January 15.1996 Name of
Contact:
R. A. Williann Phone: (704)- 382-5346
1 BPERATING DATA REPORT DOCKET NO 50-370 DATE.Tanuary 15. 1996 OPERATIN6 STATUS COMPLETED BY R.A. Willines TELEPHONE 704-382-5346 1.' Unit Mase: McGuire 2
- 2. Reporting Period December 1, 1995-December 31,1995 3J Licensed Thereal Power ( Wti:
3411
- 4. Naseplate Rating (Brass MWe):
1305e Notes & seplate Rating
- 5. Design Electrical Rating (Net MWe):
1180 (Bross MWe) calculated as
- 6. Marious Dependable Capacity (Bross MWe):. 1171 1450.000 MVA :.90 poner
-7. Marious Dependable Capacity (Net MWe):.
1129 factor per Page iii,
- 8. If. Changes Occur in Capacity Ratings (!!ees Nueber 3 Through 7) Since Last NURE6-0020.
Report. Give Reasons:
i
- 9. Power Level To Which Restricted, If Any (Net MWel:
- 10. Reason for Restrictions, if any:
i ThisMonth Yr.-to-Date Cueulative
!!. Hours In Reporting Period 744.0 8760.0 103752.0
- 12. Nueber Of Hours Reactor Was Critical 561.9 8202.8 81755.6
- 13. Reactor Reserve Shutdown Hours
--0--
- -0--
- 14. Hours Senerator On-Line 555.9 8146.1 80730.8
- 15. Unit Reserve Shutdown Hours -
- - 16. Orcss Thereal Energy Generated (MWH1 1767303 27394235 265239649
- 17. Gross Electrical Energy Generated (WH) 612850 9455678 92503276
- 18. Net Electrical Energy Generated (MWH) 584053 9090011 88712357
- 19. Unit Service Factor 74.7 93.0 77.8
- 20. Unit Availability Factor 74.7 93.0 77.8
- 21. Unit Capacity Factor (Using MDC Net) 69.5 91.9 75.0
- 22. Unit Capacity Factor (Using DER Net) 66.5 87.9 72.5
- 23. Unit forced Outage Rate 25.3 4.1 6.4
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling - April 05. 1996 - 46 days
- 25. If Shut Down At End Of Report Period. Estiaated Date of Startup:
- 26. Units In Test Status (Prior to Coseercial Operationi Forecast Achieved I
INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
OPERATING DATA REPORT DOCKET N3 50-370 tiNIT McGuire 2 DATE January 15. 1995 C0flFLETED BY R.A. Williaes TELEPHONE 704-382-5346 MONTH Deceaber. 1995 QA1 AVERAGE DAILY POWER LEVEL g4.1 A'ERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Neti 1
1148 17 0
2 1147 IB 0
3 1149 19 0
4
!!46 20 0
5 1106 21 0
6 365 22 0
7 646 23 0
8 1129 24 796 9
1142 25 1140 10 1143 26 litt i
1145 27 1142 12 1146 28 1140 13 1132 29
!!42 14
!!47 30
!!62 15 1056 31 1142 16 0
-. = -
l-UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-370 UNIT NAME muyultit:; 2 DATE v1/id/yd__.
REPORT MONTH December 1995 COMPLETED BY x.
A.
vv1111ams TELEPHONE-tius1-362-d4eb
(
(1)
(2)
(3)
(4)
(5)
R MET-E HOD i:
T A
OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 8-P 95 6 F
A HB VALVEX
.#3 GOVERNOR VALVE FAILED OPEN 9-P 95 6 F
A CB VALVEX REPAIRED 2NC-29 REACTOR COOLANT SYSTEM VALVE 10-P 95 7 F
B IA INSTRU POWER RANGE NUCLEAR INSTRUMENTATION.
11-P 95 7 F
A HB VALVEX
- 3 GOVERNOR VALVE 3
95-12-15 F
188.08 A
1 CB ACCUMU DEGRADED PRESSURIZER RELIEF TANK CONDITION i
i t
i (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions.
S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sheets For Licensee
- C-Refueling 3-Automatic Scram (LER Event-Report (NUREG-0161))
D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error r
H-Other i
F c.
,.. _ - ~,
l t
DOCKET: 50-370 UNIT: McGuire 2
' Date:
01/15/96 NARRATIVE
SUMMARY
l MONTH: December 1995 McGuire Unit 2 began the month of December operating at 100% full power. The unit operated at or near j
100% full power until 12/05/95 at 2000 when the unit began reducing power due to reactor coolant system valve repair. The unit held from 0143 to 1626 at 45% power due to #3 governor valve going full l
. open. The unit decreased to 8% power, and held from 2200 to 12/07/95 at 0242 due to repaired 2NC-29 reactor coolant system valve. During power escalation, the unit held at 47% power from 0645 to 0848 due to power range nuclear instrumentation. On 12/07/95 at 1327 the unit held at 80% power to place #3 governor valve back in service. The unit returned to 100% full power on 12/08/95 at 0012. The unit was j.
removed from service on 12/15/95 at 2350 due to degraded pressurizer relief tank condition. The unit was
- placed on-line 12/23/95 at 1955. The unit retumed 100% full power on 12/24/95 at 1801, and operated at or near 100% full power the remainder of the month.
l f
l l
1 l
l I
Prepared by: R. A, Williams Telephone: (704)- 382-5346
_ = _ _ _ _ _ -.
_____-________2 _ ______ _________ _-____
i
.a 1
i MONT11LY REFUEL ING INFORMATION REOUEST 1.
Facility name:
McGuire. Unit 2
?
2.
Scheduled next refueling shutdown: Anril 1996 3.
. Scheduled restart following refueling: May 1996 Tile PROJECT MANAGER IIAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4
{
TilROUGli 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or otherlicense amendment?
if yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
1 i
7.
Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 191 1
8.
Present licensed fuel pool capacity: 1461 Size of requested or planned increase: -.::
I 9.
Projected date oflast refueling which can be accommodated by present license capacity:
j December 2001 DUKE POWER COMPANY DATE: January 15.1996 1
Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 1
t.
.. _,