Attachnent 1 NRC Docket NPF-5 Edwin I. Hatch Nuclear Plant Unit 2 Request Ebr Technical Specification Relief Ihe proposed change to 'nchnical Specifications (Appendix A to Operating License NPF-5) would be incorporated as follows:
Renove Page Insert Page 3/4 8-21 3/4 8-21 3/4 8 3/4 8-22 F
+
4 8409050157 840827 PDR ADOCK 05000366 P
.. ~.
7 t
,e..
TABIE 3.8.2.6-1 (Continued)
PRIMARY CONTAIbMDff PENETRATICN 00NDLCIOR OVERGRRENT PROTECTIVE DEVICES DEVI NLMBER
'IRIP
RESPONSE
SYSTEM /OCMPONENT
~ AND IOCATION*
SETPOINT TIME NWERED (Amperes)
(Milliseconds) c.
Type 3:
- 1. -
600 VAC, MCB, T.M.
15 NA RECIRC. PLMP FCIOR HEATER 2R24-S014,- OCMPT. 5E 2B21-C001B 2.
600 VAC, MG, T.M.
15 NA REACIOR RECIRC. RMP MOIOR 2R24-S013, CCMPT. 5B HEATER 2B21-C001A d.
Type 4:
1.
120 VAC, MG, T.M.
20 NA CABLES BHE805M01 AND 2R25-S102, CKKT. 10 BHE80EH02 2.
120 VAC, MG, T.M.-
20 NA CK'IS, BGE70EM01 AND 2R25-S101, CKT. 10 BGE70EN02 e.
Type 5:
1.
600 VAC, MCB, M.O.
7 NA DRWELL DQUIP. IR. SIMP
- 2R24-S014, CCMPr. 2A DISG. MOV 2Gll-F018 2.
600 VAC, MCB, M.O.
15 NA DRWELL EQUIP. DRAIN SLMP 2R24-S014, CTMPT. 6C RECIRC. MOV 2Gll-F015-3.
600 VAC, MCB, M.O.
22 NA RCIC STEAMLINE INBOARD 2R24-S012, CCMPT.19C ISO. MOV. 2E51-F007 4.
600 VAC, MG, M.O.
16 NA RHR HEAD SPRAY ISOIATION 2R24-S0ll, CCMPT. 9A MOV. 2 Ell-F022 5.
600 VAC, MCB, M.O.
35 NA HPCI STEAM LINE INBOARD 2R24-S0ll, CIMPT.14B ISOIATION MOV. 2E41-F002 6.
600 VAC, MG, M.O.
22 NA BWCU INBOARD ISOIATION 2R24-50ll,- OCMPT. 14C MOV. 2G31-ET)01 7.
600 VAC, MCB. M.O.
19 NA MAIN STEAM LINE DRAIN 2R24-SOll, CCMPT.15B MOV. 2B21-F016
- M.C.B. - molded case circuit breaker M.O. - magnetic only
~ T.M. - thermal magnetic HA'IG - UNIT 2 3/4 8-21
c:.
TABLE 3.8.2.6-1 (Continued)
PRIMARY CONTAIMENT PENETRATION COtODOIOR Cw OVERCURRENT PRO 7ECTIVE DEVICEE DEVICE NLMBER TRIP
RESPONSE
SYSTEM /001PONENT
- ABD ~IOCATION*
SETPOINT TIME IOWERED (Amperes)
(Milliseconds)
'f.
Type 6:
'600VkC,MCB,M.O.
200 NA IOOP 'A' RMP SUCTION
' 1. -
2R24-S018A, CXMPT. 2A MOV 2B31-F023A
-2.
.600 VAC, MCB, M.O.-
135 NA ICOP 'A' RMP DISCH.
- 2R24-S018A, CCMPT. 2B MOV 2B31-F031A 4 3.L 600 VAC/ MG, M.O.
270 NA ICOP 'B' RMP SUCTION 2R24-S018)B, CXMPT. 3A MOV 2B31-F023B 4.-
600 VAC, MCB, M.
O.~
135 NA ICOP 'B' RMP DISCH.
2R24-S018B, CCMPT. 3B MOV 2B31-ET)31B
- 5.
600 VAC,'M G, M.O.
190-NA DRWELL EQUIP. DRAIN 2R24-S014, CIMPT.1B RMP B 2Gil-C006B 6.-
600 VAC, MCB, M.O.*'
140-NA DRWELL FICOR DRAIN StMP 2R24-S014, CCMPT. 7D RMP 'B' 2Gil-C001B
.7.
600 VAC, M G, M.O.
150 NA DRWELL FIDOR DRAIN SLMP 2R24-3013, OCMPT. 4A PLMP 1A 2Gil-C001A
- 8.
-600 VAC, McB, M.O.
130 NA DRWELL EQUIP. DRAIN SEMP
' 2R24-S013, ' CXMPT. 4B PLMP A 2G11-C006A 9.
600 VAC, MCB, M.O.
480 NA DRWELL COOLING LNIT 2R24-S012, CXMPT.18B -
'. 10. 600 VAC, MG, M.O.
66 NA-DRWEIL COOLING UNIT 2R24-S012, CXMPT.19A 2T47-C001B
- 11. 600 VAC, MG, M.O.
-190 NA RHR SHUIDOWN COOLING ISO. MOV 2 Ell-F009 2R24-S0ll, ~ CCMPT. 6C
- 12. - 600 VAC, MCB, M.O.
455' NA DRWELL COOLING LHIT-2R24-S0ll, CCMPT.18A.
- 13. - - 600 VAC, MCB, M.O.
140 NA DRWELL CDOLING REIURN
' 2R24-S0ll, CCMPT.18C AIR FAN 2T47-C991A
- M.C.B. - molded case circuit breaker M.O. '. magnetic only T.M. - thermal magnetic HA'!OI - LNIT 2 '
3/4 8-22 2
h s'-
t.
m NRC Docket NPF-5
^
Edwin-Is Hatch Nuclear' Plant Unit 2 Request For Technical Specification Relief 10 CFR 50.92 Evaluation ~
Change the Unit 2 Technical Specifications Table 3.8.2.6-1 Trip Setpoints:
Current Value (7mps)
Proposed Value (7mps)
~
. e.5 -
= 30 -
35 e.7
-7 19
~
- f.2.
215 135'
/
, f.4 :
185 135 Basis
'T Wis change results fra the implementation of 10 CFR 50.49 on Plant Hatch Unit 2..
See safety-related motors were changed in order to meet accident environment requirements.
We requested; change to 'Iw:hnical Specifications e
.results fra the need :to show the new primary contaiment electrical penetration c over-current-breaker setpoints-to acconnodate - these newly
-installed motors.
%ese proposed setpoint values were derived using the-
- criteria for the other setpoints in the Table.
In each case, the over-current
. breaker value is a few percent (1-5%). of the rated mperage of the electrical-penetration.
ne breaker would protect the penetration in the event of a -
short in the circuit or in the motor.
Because this change results fra the installation of new motors which were required as a result of 10 CFR 50.49, and because the requested change results
- in no changes to facility operation, this change is consistent wth Item vii of
- the "Exanples of Amenchents that are Considered Not Likely to Involve
~
Significant Hazards ' Considerations" listed on page 14,870 ' of the April 6,.
U 1983, issue of the Federal Register.